LAUNCH COMPLEX D TYURA TAM MISSILE TEST CENTER, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000200300093-8
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 2, 2000
Sequence Number: 
93
Case Number: 
Publication Date: 
April 1, 1963
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000200300093-8.pdf112.11 KB
Body: 
ILLEGIB Approved For Release 2001/03/30 : CIA-RDP78TO5439A000200300093-8 Approved For Release 2001/03/30 : CIA-RDP78TO5439A000200300093-8 I--~, ry 2 Pc-,es L SO/rd T/ NFiC R-48 63 00 Arai 1963 .' Handle Via TALENT - KEYHOLE Control Only This document conrc,ns class,f.ed nfa.ena,, on sired. n- Y+,e rwat.o-aT $ecuury of if,* Unrted States within the mea,,,, of the es(:onoye !o,.s U. S ~oa? Ttr;e ip, Sectone 793 s.4 744. The :aw prohibits its tronsm,as.on or the r-eiation of is contents in any nsonner to an ,,,,e.~t^oi.zeQ ;>rson, as wet: as its us? in any manner pre udi col to the safety or intetesr of the Untied Stotts Co for the benefit of any fore,2n goternment to the detriment of the United Stotts. It is to be seen on'y tsy ptrson,e' spec airy indoctrinated and aurhorized to --sr TALENT-K EYHOLE informo?,on, Its secur,fy me st to n.a.neoined in accordance wit KEYHOLE and TALT re yu'~.o f, ans. Declassification review by NIMA/DOD LAUNCH COMPLEX D TYURA TAM MISSILE TEST CENTER. USSR Itw 87 4 re~ccACT TOP SECRET CHESS RUFF 25X1 D LAUNCH COMPLEX D TYURA TAM MISSILE TEST CENTER, USSR This report provides answers to specific questions on Launch Complex D, Tyura Tam Missile Test Center, contained in CIA joint requirement OSI/R-240/62--ORR/RR-255/62. It makes no attempt to present a comprehensive description of Launch Complex D. A more detailed study of this launch complex appears in NPIC/R-30/63, Silo ICBM Launch Areas in the USSR. 1/ The two launch areas a: Launch Complex D (Dl and D2), although not in the same stage of construction, appear as though they will be identical in size and configuration when com- pleted (Figure 1). The previously reported objects at Dl and D2 are now referred to as silos. The two silos at Dl measure 50 feet across and are 200 feet apart from center to center. Their sha a is still indistinct. As of they extended approximately 10 feet above ground level. This extension above ground may mean that backfilling has not yet been Ampleted. Alternatively, it may mean that scaffolding has been erected over the silos. If so, the scaffolding would be used to lower materials into the silos during the final phase of construction. The onl significant construction activity at DI since has been the all-weather surfacing of a triangular portion of the entrance service road. CONSTRUCTION SUPPORT SLOGS 01 U1 OBJECT BLDG ZOO' X 70' NEW ROAD SURFACE PARKING APRON I MEASUREMENTS ACCURATE 25X1 D 25X1 D 25X1 D TOP SECRET CHESS RUFF TOP SECRET CHESS RUFF 25X1 D The two silos at F-)2 measure f+' feet However, the control bunker has been installed across and are 200 feet apart from center to and construction is proceeding in the pattern center. They appear to be square in sha e. established at Dl. D2 had not been backfilled as of 25X1 D REFERENCES TOP SECRET CHESS RUFF