ADDITIONS TO FLOORSPACE OF VORONEZH AIRCRAFT ASSEMBLY PLANT NO 64, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000200370046-3
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
March 23, 2000
Sequence Number: 
46
Case Number: 
Publication Date: 
July 1, 1963
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000200370046-3.pdf249.01 KB
Body: 
Approved For Release 2001/11/07 : CIA-RDP78TO5439A000200370046-3 Approved For Release 2001/11/07 : CIA-RDP78TO5439A000200370046-3 PHOTOGRAPHIC I `ERPRETAT G 4 REPORT V ADDmONS TV FLOOR PACE OF VORO EZH ?AIRCRAFT ASSEMBLY. PLANT NO 64, ALENT - KEY E control -Only .`lat&fiiey iHiai avian ?ff? itna t;`;I natieiiui sa=:ru:i,y F ini Unit1I Stateas u.*''i?' tEes . . ,a ry i .- .tee sa* a* i~ ~ea i- t E r - Y `#- IF dn-? 3 ?finer TO 0. ynOJ rz,r nar33nq 05 W. nu r.,ni:ae ,, 10 Uniroa .~ -3 a: TOT- W n# a.iy I i-z T~ a5 ~lss nv:''. -F-Z-0'T8 Sit=3 with :CE `' .=L+ & d TOP SECRET CHESS RUFF ADDITIONS TO FLOORSPACE OF VORONEZH AIRCRAFT ASSEMBLY PLANT NO 64, USSR 25X1 DI Voronezh Aircraft Assembly Plant No 64 The aircraft assembly plant (Figures 2 and ( located at 51-38N 39-15E 3) is served by both road and rail. The adjacent on a east si e o the Voronezh River (e Fig- Voronezh East airfield is used as a flyaway ure 1), approximately 2.5 nautical miles east- field. The presence of BADGER and CAT air- southeast of Voronezh city center. craft at the airfield indicates that the plant is engaged in the production of this type of aircraft. The plant has an estimated total floorspace o (Figure 2), consisting of two final assembly buildings, subassembly buildings, workshops, machine shops, storage buildings, administration buildings, and a found- ry. Other buildings within the fenced area of the airfield and aircraft plant are primarily for maintenance and support. All buildings in the aircraft assembly plant are included in the total estimated floorspace, but only the major build- ings have been annotated. A new extension on the northeast end of the subassembly building, under construction in extension contains an estimated 107,300 square feet, giving this building a new estimated total of 239,250 square feet. - - An additional section located on the west side of the final assembly building was not included in a previous report J. This section has an estimated floorspace of (Figure 2, item 9). TOP SECRET CHESS RUFF TOP SECRET CHESS RUFF o u WORKSHOP ADMIN BLO9y~ FINAL $E MOLY 6 2 0 WORKSHOP 1 O BLDG LENGTH SQ FT j & WIDTH 1 1 1550 x 465 720,000 2 1 230 x 105 24.150 3 4 500 x 35 130 x 35 24.150 5 6 7 825 x 290 239,250 8 1245 x 205 255,225 9 10 390 x 310 I 120,900 11 450 x 200 90.000 12 OTHERS TOTAL NOTE: ADDITIONS TO FLOORSPACE ARE SHOWN IN RED TOP SECRET CHESS RUFF TAXIWAYS I TO A/c AIRFIELD A r SUB- SUPPORT ASSEMBLY AREA I I ' 12 I0 O FOUNDRY a FIN AL ASSEMBLY 4T - UASsu SEMBLY BARRACKSI9 AREA 7 SUBASSEMBLY 5 - TOP SECRET CHESS RUFF 25X1 D Mission Date Pass Camera Frame Classification DOCUMENTS TOP SECRET CHESS RUFF