IRBM LAUNCH COMPLEX NEAR GUANAJAY, CUBA CHONOLOGY OF CONSTRUCTION

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000200410061-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
11
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 7, 2000
Sequence Number: 
61
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000200410061-1.pdf547.3 KB
Body: 
ILLEGIB Approved For Release 2000/09/14: CIA-RDP78TO5439A000200410061-1 Next 1 Page(s) In Document Exempt Approved For Release 2000/09/14: CIA-RDP78TO5439A000200410061-1 25X1 C 25X1 D IRBM LAUNCH COMPLEX NEAR GUANAJAY, CHRONOLOGY OF CONSTRUCTION The Guanajay IRBM1 Launch Complex south- iv of con- sisted of two launch sites (Figure 1). Launch Site 1, located 2.5 nautical miles (nm) east- northeast of Guana jay at 22-57-OON 82-39-25W, and Launch Site 2, located 4.7 nm east-northeast of Guanajay at 22-57-25N 82-36-55W\, can be 25X1 D 25X1 D seen in very early stages of preparation (Figure 2) on photography o Site 1 was estimate to be over o per- 25X1 D was in an earlier stage of construction. As of , it % vas estimated that Site I 25X1 D was approximately 80 percent complete, whereas construction of Site 2 was estimated to be two Santa Fo,- La Boca Z Mariel LAUNCH .LAUNCH SITE 2 SITE 1'/ GUANAJAY - 1 - Declassification review by NIMA/DOD Bauta San Antonio De Los Banos 25X1 C 25X1 D SECRET 25X1 D 25X1 C weeks behind that of Site 1. On _ it was noted that both sites were being abandoned. The chronology of construction at the launch sites is outlined below, and details are given in -Fable 1. Pad areas probably cleared of brush Security fence probably L' C (Not observed on photo_Taphc) Foundations probably laid for control bunkers Excavations probably trimmed to size (Not observed on photography) Segments probably in all excavation= Probably preparations for concrete %ork (Not observed on photog-raphy) Blast walls probably built Cable trenches probably dug Concrete segments probably placed in trenches and covered Control bunker probably assembled (Not observed on photography) Control bunkers erected Cable trenches nearly finished Blast walls erected Concrete poured on some pads Excavation for liquid stara e tanks 25X Concrete on 3 pads; still at work on others Excavations for liquid storage tanks Security fencing construction More fill being added to pad areas Liquid storage tanks noted beside excavations Equipment cabling and control bunkers appearea complete One ready bldg U. C Third pad being concreted Approaches graded for one pad, fill added to others Probable pad areas cl^ared of brush Probable security fence U, C Foundation f ~r probable rectangular bldg Excavations acrd=- cads Foundations for probable control bunkers Concrete _ egm."nts piled beside excavation Three (i) excavations trimmed to size; seg- ments assembled alongside Roof ready for rectangular bldg Excavation for 4th pad Segments placed in one excavation Crane assembling prefab control bunker parts Rectangular bldg still U.'C Segments in all excavations: preparations for ~(gm concrete work Blast walls probably built Cable trenches probably dug Concrete segments probably placed in trenches and covered Control bunker probably assembled (Not observed on photography) Pads cleared of brush Security fence U, C Rectangular bldg U. C Excavations across 3 pads Foundations for control bunkers Construction continues on security fence Rectangular bldg U C Concrete segments piled beside one excavation Three excavations trimmed to size; segments of proper shape beside one excavation Roof ready for rectangular bldg 25X1 C Crane working on ready bldg- Tao liquid storage tanks placed in excavation Vicro