SEARCH FOR THE LUNG-WANG-MIAO, HYDRO-ELECTRIC POWER PLANT, COMMUNIST CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000300270074-2
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
May 18, 2000
Sequence Number: 
74
Case Number: 
Publication Date: 
March 18, 1964
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000300270074-2.pdf573.16 KB
Body: 
ILLEGIB Approved For Release 2001/03/03 : CIA-RDP78TO5439A000300270074-2 Approved For Release 2001/03/03 : CIA-RDP78TO5439A000300270074-2 Approved For Release 2001/03/03 : CIA-RDP78T05439A000300270074-2 b I3DRANDUM FOR: Chief, Resoirces Division, ORR 25X1 A ATTENTION 25X1 D THROUGH Chief, Requirements Branch, Reconnaissance Croup, CGS FROM Chief, CIA/PID (NPIC) SUBJECT Search for the Lung-Wang-Miao, Hydro-electric Power Plant, Communist China REFERENCES (1) ORR Requirement No. 41-63 (Revised) (2) CIA/PID Project No. C-153/63 1. In response to the above referenced requirement, a search of avail- able photography was undertaken in an attempt to locate and describe the re- ported Ling-Wang-Miao Hydro-electric Power Plant. - 2. The results of the search proved to be ative. All available photo- graphy was scanned for this facility. KEYHOLE was the best quality, cloud free photography of the search area. A p o o-Mosaic of the search area (see figure 2) was prepared for your use as a record of the. reported location and its.environs. 3. The reported location of the power plant (L255N-12(O5E) is indicated on both enclosed graphics. There was no indication of any dam nor was there any evidence of any construction activity that could be associated with a struct- ure of this type within a 30 nautical mile radius of the location. The reported site is located within the reservoir area of the Feng-Man- Tsun Hydro-electric Power Plant and Dam. There is a highway bridge and several small villages clearly vfcsible near the reported location. None of the activity evident in this area, could be construed as construction type. 25X1 B The reservoir behind the Feng-Man-Tsun Dam is probably still filling up because it has not reached the heights indicated on current maps. The only change observed on the rivers emptying into the reservoir is at the city of Hua-Tien, here the river meanders were re-aligned and a high levee was contructed to pro- ,, - 0 R2 Exci^dzd from !te,,dctic d ra- i-? C'LZi~? :ficUtiza Approved For Release 2001/03/03 : CIA-RDP78TO5439A000300270074-2 cit Approved For Release 2001/03/03 : CIA-RDP78TO5439A000300270074-2 25X1A 25X1A SUBJECT: Search for the Lung-t?Tang-b ao, Hydro-Electric Power Plant, Communist China 4. The photo analyst assigned to this project was who may be contacted on extension 2607 should you have any further questions regard- ing this project. This requirement and attachments completes this project. Enclosures: 1 Annotated Map (cIA/Pm/IE-P-457/61+) 1 Annotated Photo Enlargement (cIA/PID/Is-P-)+58/6)4) Approved For Release 2001/03/03 : CIA-RDP78TO5439A000300270074-2 liAl-LUNG ( KU. !EN.TZU `a- h60 TOP SECRET - RUFF ReI.vase 3M3 CtkRPP-7 TQ54a9A000 CH!N HU-CHAN CMONSING CO NG 50 // - r }'~ ._/^ ..,