SOVIET TYPE IIIA ICBM SITES
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05439A000400060045-6
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
6
Document Creation Date:
December 28, 2016
Document Release Date:
March 12, 2001
Sequence Number:
45
Case Number:
Publication Date:
August 7, 1964
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 232.11 KB |
Body:
ILLEGIB
Approved For Release 2001/07/12 : CIA-RDP78T05439A000400060045-6
Next 1 Page(s) In Document Exempt
Approved For Release 2001/07/12 : CIA-RDP78T05439A000400060045-6
HANDLE VIA
Tik,L.:" NT- K E yHoLE
CONTROL 5Y0tCM ONLY
25X1A
25X1D
25X1D
25X1D
25X1D
25X1D
Lxc!!:;cri
DECLASS REVIEW BY NIMA / DoD
mEmoBANDUmPOR:
ATTENTION:
THROUGH:
FROM:
SUBJECT:
REFFIlENCES:
i?
PCs 7677/64
.M/EB 398/64
7 August 964
Copy
Chief, Forces Division# ORE
Chief, Requirements'Brauch, Reconnaissance Group, COS
Chief, CIA/Pp (MC)
Sovfet Type 1114 ICBM Sites
(a) Requirement CpaRm4-81,569
(b) CIA/PID Project C 1156.64
1. This memo
1964 which requests
sites associated with
to determine diffe
different time pert
Missile Test Center.
is in response to your requirement dated 6%Tuly
examination of all Soviet type ma. hardened ICBM
the 80..7 missile system. This examination was made
ces, if any, between deployed sites constructed during
and differences between DI and D2 at the Tyura Tam
o any apparent relationships between D1 and D2 and
the deployed sites were to be determined.
2. The 27 Type 1114 hard sites were considered as an early and a late
group as requested, ifts early group of 16 sites were first observed under
construction on otography between The late group
of 11 sites were first observed between Listed below
are the early and late groups and construction status.
Site
Yurya, E
Yurya 0
Novosibirsk
Hhadrinsk A
Bhadrinsk B
Kbstroma E
Verkhnyaya Saida F
Verkhnyaya Salda G
Plesetsk C
Yedrovo E
Yedrovo H
EARLY GROUP
Negation
First Seen rate
0.1?101?MM.INIONIMIIINNIP
Construction
Stage *
None Compl4e
'Home Come
11.111111
complete
Complete
Complete
Complete
Complete
Complete
.Complete
iLtd
,
Estimated.
Quarter
Completed
11111101.
SVSTLIA
HANDLE VIA
eTALNT-V,ZYHOLE
!corsiTkoL. cNt.Vt
TOP SECRET RUFF
1R21.1ECh Soviet Type /ZIA ICBM Sites
Tai 7677/64
M/EB 398/64
EARLY GROW ,(e6ntinnedY. _
Negation Construction Estimated
Bite First seen Date Stage * Qparter
Comkaleted
Yedrovo 1 Complete. ...-
25X1 D YurYa K , . Late 4th -- ' 64
Olovyannya A Complete ...
25X1D Drovyanaya B Complete ......
Novosibirsk C Late 3rd - 64
25X1D * Stage of construction
25X1D
25X1D
25X1D
Site
Perm
Shadrinsk C
Olovyannaya B
Drovyanays
DrovYmakral,
Gladkaya C
Xbstroma H
OlovyannaTa C
Gladkaya D
Gladkaya E
Svobodnyy G
LATE GROUP
Negation Construction Estimated
First Seen Date Stage * Quarter
Completed
J
* Stage of construction
Late 1st - 65,
Late let - 65
Mid Snd - 65
Mid 2nd - 65'
Nld 2nd - 65
Stay ?
Mid 3r4 - 65
Mid 3rd - 65
Mid-late 2nd - 65
Early 7
Late 2nd. - 65
The thotography or the earlr sites under construction 414 not,Zrariaa
structural dote/liven exactlyhOw. the sites sere conitructega'' Good quality,
large scale pkotogrelibY Cliar some of these site. now gives a much more
detailed signature of the finished configuration. A, limited amount of good
quality, large scale photography or the late group or sites under construction
indicates that the finisbed signature (of the facilities built 'within the
excavation) will probably be similar to that of the early group. In overall
gross features of construction, all of the sites in, the late group appear to
be similar to each other and to the sites in the early group.
2
.Tel? c:r RUFF
HANDLE' VIA
TALENT-(IV} OLE .
CONTROL: SYSTEM 0;41A
r,
.-IANDLE VIA
, TgLENT-KEYki0LE
CONTROL =.;','FLM ONLY
TOP SECRET RUFF
StISJIXT: Soviet 3;orpe II1A ICU Bites
Tcs-7677/64
WEB 393/64
athCel the Limiting factors explained in the above paragraph pRilittits
detersathation of structural differences, if lii:tyr between the site, lit wan
neoeasary to examine isuacil3nry features for ery correlation between the two
groups of deployed Utak and. ill an11132. Considered here were the construction
of RLI facilities at deployed site. and differesces in technical support
facilities at DI and I.
25X1 D 1111M iz2itial scarring for the construction of a new facility
vas f o served at the early gx?oup of sites. This was approxiaately ono
year after the deployed bard site program was observed. This new construction
25X9 vas subsequently labeled a RIX facility (Receivinci Inspection, and Maintenance).
25X9 It liaa placed outside the Secured launch site end cjt of one missile ol
25X9 buijLIg
25X9 of RX ities were first observed
25X1 D at the early sites the Second quarter of This time period torresxnds
to tha begthaingcanerucUoai of the late group of .hard sites. It.ti facilities
have been first oeec under construction at the early Site. so late as
25X1 D
?25X1 D at the Yedrovo couplers Sone scarring at Yedrovo V. in may be
this yeiar. None 120.41 yet been identified at
4121 thincation of constriction. Mere read= Dozedo as whether -
Thdrovo ii is actually a launch site.
25X1 D
25X1 D
25X1 B
25X1 D
25X1 D
3
HANDLE vrA
TALENT-KEYHOLE
TO? SiCRET CONTROL: SYL7.71:14 ONLY
? ? a a ? ?Asso,oss.ss, -6
HANDLE VIA
TALENT-KEYHOLE
CONTROL SYSTEM ONLY
25X1B
25X1D
25X1D
25X1D
25X1D
TOP SECRET RUFF
=MEM: Soviet Type 3:W. ICU Sites ?
TeS 7677/64
giED 3Y1614
!?
ati facilities nre possialy uoder cceurtruction at Olovytuanua Zeunch
Sites B ai4 eg but when, last seen 4233,7-goo4 photography ecnatruction was
f4r enouch advanced to ;emit positive identification, Ti"*mb, Site 11 at
3trona ia atill too early in construction to identify the :Ate coApone4.,ts.
Construction bas cowed at the remaininc tvo sites in the late
Launch
Sites C iz1 E at Cladlava appear the maze in=es the/ did in
this year.
It is not pasaijOle to deteraine any structural differences betwenii
and :2 at the '2:iure/ 23:3 IlLaelle Test Center. The aurface features
at Di are conaiste4rh those at the coopleted deployed aites in the
25x1D LI-oup. Launch Site $ when completed; probribly will present the saLe appea.r.
wane. UNA1 buildires bare been constructed _ = site ut 12. Uis
of them was pzeotehdy wider construction in and both were viarcze
25X1 D 92bese appear to be arob?roof = ? to the missile
Lutidinges at the RDI facilities) and probably will be airth nounded.
',arable structures have been added to id. Me structures posaibly could ?
associate 12 with the late 6mq) of sites whim the tato missile hold bui:A.4.ir,,:p
25X1D are within the eite. The a1 conmtruc!tin &
25X1 B
25X1 B
25X1D
25X1D
co ted
Zro new facilities were observed at the D complex at the Titre Tam :Lionile
Test Center n Canetruction of these bad been initiated fatter
is en "L" shaped elactzmic facility 4,103 feet
aotkof 12. tdent1fiM traces appear to connect this ty to D2. Uw,
Jther new facility, which say also be of as elsotroeie (possibly tele-
luetry recalving), is located 8,200 feet vest of the "L" ? This facility
c:exteina one large building, a few smaller ones, end several unidentified. -
co:jects. lisittwo? of these two facillties has yet been ideatined at WV of
the dePloYed hard sites. The stage of ecsetructicewof the late oup does not
preclude the posaibility that tbeiy nay yet be lastaied. ,
? ? ? ?
TOP SECRIET RUE"
HANDLE VIA
TALENT-KEYHOLE
CONTROL ,YSTEM ONLY/
? s 5 12 : CIA-RDP78T05439A000400060045-6 ?
TOP SECRET RUFF
LIANOLr VIA
TALEN r KEYHOLE
"CONTROL ._,Y:"..TEm ONLY
SUBJECT: Soviet Type IIIA ICBM Sites
TCS 7617/64
M/EB 390/64
25X1A 3. 'Ilhe photo'analYSt on this project 'is who may be
contacted on extension 2070 should you have any further questions concerninc
this project.
25X1A
4. This project is considered to be complete.
TOP SECRET r:iiFF
?,.
HANDLE VIA
TALENT-KEYHOLE
CONTROL SYSTEM ONLY