SYNCHROTON UNDER CONSTRUCTION YEREVAN, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000400080002-1
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
7
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 4, 2012
Sequence Number: 
2
Case Number: 
Publication Date: 
July 1, 1964
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000400080002-1.pdf400.35 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP78TO5439A000400080002-1 ILLEGIB Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP78TO5439A000400080002-1 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP78TO5439A000400080002-1 TOP SECRET P! 4aTO^r?dtAPM C MT ERMTATICK PE MOMT ,.3 t N1 -4611'64 SYNCHROTRON UNDER CONSTRUCTION. YEREVAN, USSR TOP SECRET Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP78TO5439A000400080002-1 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP78TO5439A000400080002-1 SYNCHROTRON UNDER TRODUCTION The site of the reported 6 billion-elect on- volt- (BEV)synchrotron under constructio at o- Yerevan, L'JSSR, has been identified on p ? . Rraphy of excellent - quality from KEYHOLE located at 4 -12-20N 44-29-OOE in the suburb of-Nor rlrabkir, mmediately north-northwest of the city of revan and on the west bank of Razdan River (Figure 1). Collateral in- h e t formation indicates that the facility is part of the Yerevan Physical Institute, which is 10- 'cated about )2.6 nautical miles (nm) away. l/ on thevsiteI A security wall surrounding the site is nearly complete, and guard posts are evident at the entrances. Since. construction of the synchrotron and its associated research and service facilities is still in progress, the road system within the site has not been com- NPIC/R-464/64 ground, and what appear to be pumping - ities, all in the last stages of construction, are located on a rise approximately 1,340 feet north of the site (inset, Figure 2). An _ apps}...... r-r- they R,dan River, immediately . to the east, to the water tanks and thence to-the:synch- rotron site. Water from the tanks will prob- a.., Powerlines to the site are not discernible. The Kanaker hydroelectric powerplant is to cated approximately 1.6 nn northeast of the site, and an electric substation is-located at the northwest corner of the site (item. 24, Analysis reveals that less than half of the synchrotron magnet tunnel (item 6, Figure 3) is complete. There is no indication that mounting of the magnets and coils has begun. The associated -experimental hall and laboratory building (item 7, Figure 3) is not completely roofed. Five completed, apparently conventional laboratory buildings are present at the site (items 2, 15, 16, 18, and 22, Figure 3). All of these appear to have roof vents. The state of construction at the site and the lack of a permanent road pattern, however, suggest that the buildings are not yet in operation. Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP78TO5439A000400080002-1 Another significant building (item 14, Fig- ure 3) with an associated stack 135 feet high is under construction just west of the magnet tunnel. This building will probably be a tedmplant. s Two unidentified buildings, both completed, are located outside the wall securing the area, one on the south side and the other at- the north- West corner (items 19 and 29, Figure 3). is conne. probable shopp 12 U Unidentified building; tack 13 Unidentified building under construction 14 probable steamplant under construction with ass?c)a-e with 5 roof vents ;~j 15, Laboratory building TOP SECR, Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP78TO5439A000400080002-1 WE FIGURE 2. SYNCHROTRON SITE, APRIL 1964. Inset shows associated water tanks of site. g N--. colts) and probable pumping facilities 1,340 feet north- Ta61e.1. Description Of Structures at Synchrotron Site (Items d,e keyed to Figure`s) Description, NPIC/R-464/64 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP78TO5439A000400080002-1 TOP SECRET RUFF. NPIC/R-464/64 Id Laboratory building with at least 11 roof vents 17 Unidentified building under construction- Laboratory building with 6 roof vents 19 Unidentified building 20 Unidentified structure 21 Probable. storage building 22 Laboratory building with 6 roof vents 23 Unidentified building- 2-3 Electric substation with associated control building 25 Unidentified building 26 Probable administration building 27 Probable administration building a Unidentified building, Unidentified building Wall under construction Trench Building Building under construction TOP SECRET RUFF.. Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP78TO5439A000400080002-1 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP78TO5439A000400080002-1 TOP SECRET RUFF !NPIC/R-464/64 REFERENCES, ACIC. US Air Target Complex Chart, Series 100, Sheet 0325-9995100A, ?d ed, Dec 50, scale 1:100,000 (SECRET) 1. CIA. IR No 00-B-3,359,591, Machines and Work at Dubna, Kh ukov, Yerevan, Moscow, CERN, Frascati, Orsay, 3 Feb 64 (CONFIDENTIAL) 11 REQUIREMENT CIA. C-SI4-81,473 Ni662/61 Ili it TOP SECRET1~ RUF u Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP78TO5439A000400080002-1