OAK-PART I MISSION 1009-1 6-9 AUGUST 1964

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000400100038-5
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
35
Document Creation Date: 
December 28, 2016
Sequence Number: 
38
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000400100038-5.pdf776.4 KB
Body: 
lly Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 /uoa Copy I Z . 32 Pages ~AK-PARTI MIS1I0N 1009-1 6-9 AUGUST 1964 Declass Review by NIMA/DOD 25X1 /i 25X1 '-NATIONAL PiibTOGRAPHIC INTERPRETATION CENTER ? Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET OA K-PART i MISSION 1009-1 PREFACE THIS IS THE FIRST OF AN ESTIMATED TWO DAILY OAK REPORTS BASED ON MISSION 1009-1 AND DEALING WITH THE HIGHEST-PRIORITY INTELLIGENCE ITEMS APPEARING IN THE COMOR TARGET LIST. THIS REPORT, COVERING THE OAK REPORTING PERIOD 0800 TO 1500. 13 AUGUST 1964, PRESENTS INFORMATION ONLY ON THOSE COMOR TARGETS OBSERVED ON THE PHOTOGRAPHY. TARGETS ARE ARRANGED IN THE OAK BY SUBJECT AND WITHIN EACH SUBJECT BY COMOR TARGET NUMBER. TARGETS OF OPPORTUNITY OBSERVED DURING THE OAK-REPORTING PERIOD ARE LISTED NUMERICALLY UNDER THE APPROPRIATE SUBJECT AFTER THE LISTING OF COMOR TARGETS. LOCATIONS OF TARGETS IN THIS REPORT ARE INDICATED BY THE COUNTRY CODE PRECEDING THE COORDINATES. SELECTED PHOTOGRAPHIC REFERENCES FOR EACH TARGET OBSERVED AND REPORTED FOLLOW THE DESCRIPTION OF THE TARGET. PASS NUMBERS ARE SUFFIXED WITH EITHER AN A FOR ASCENDING (SOUTH-TO-NORTH) OR D FOR DESCENDING (NORTH-TO-SOUTH). FRAMES ARE INDICATED BY THE LETTERS FR. THE LETTER F PRECEDING FRAME NUMBERS, INDICATES THE FORWARD CAMERA, AND THE LETTER A INDICATES THE AFT CAMERA. UNIVERSAL REFERENCE GRID (X-Y) COORDINATES ARE GIVEN IN PARENTHESIS AFTER THE FRAME TO WHICH THEY APPLY. THIS GRID IS IDENTIFIED AS UNIVERSAL GRID NO 19 FEB 64. SYMBOLS INDICATING CONDITIONS WHICH AFFECT THE APPEARANCE OF THE TARGET ON THE PHOTOGRAPHY ARE AS FOLLOWS -- C (CLEAR), H (HAZE), HC (HEAVY CLOUD COVER), SC (SCATTERED CLOUD COVER), SD (SEMIDARKNESS), 0 (OBLIQUITY), S (SNOW), PQ (POOR IMAGE QUALITY). OAK RECIPIENTS ARE CAUTIONED THAT THE INITIAL SCAN OF THE PHOTOGRAPHY FROM MISSION 1009-1 IS BEING ACCOMPLISHED IN A SHORT TIME AND OFTEN WITHOUT THE AID OF PRECISE ANALYTICAL AND MENSURAL EQUIPMENT COMMONLY EMPLOYED-IN DE-TAILED PHOTOGRAPHIC ANALYSIS. CONSEQUENTLY, ALTHOUGH THE INFORMATION PRESENTED HEREIN IS ESSENTIALLY ACCURATE, FUTURE, DETAILED ANALYSIS MAY SOMEWHAT ALTER PORTIONS OF THE INFORMATION. TOP SECRET 25X1 LJA I 25X1 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Next 2 Page(s) In Document Denied Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO543 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET 1. OLOVYANNAYA ICBM COMPLEX (COMORI NEW. ACTIVITY AT THE OLOVYANNAYA ICBM COMPLEX REVEALS WHAT APPEARS TO BE A NEW CONCEPT OF SILO DEPLOYMENT. THIS ACTIVITY IS LOCATED NNE OF LAUNCH AREA C AND CONSISTS OF AT LEAST ONE CONFIRMED SINGLE SILO UNDER CONSTRUCTION AND FIVE PROBABLE SINGLE SILOS UNDER CONSTRUCTION. THESE SILOS ARE ARRANGED IN A CIRCLE APPROXIMATELY 6 NM IN DIAMETER AND SPACED, ON THE AVERAGE, APPROXIMATELY 3 NM APART. LOCATED AT THE CENTER (51-05N 116-04E) OF THE CIRCLE IS WHAT APPEARS TO BE A SUPPORT/CONTROL FACILITY. THE COMPLEX WILL BE REPORTED IN DETAIL IN OAK PART II. 25X1 POSITION HARD IRBM LAUNCH AREA SINCE EARLY 2. BOLSHAYA KAMENKA IRBM LAUNCH SITE (COMOR NO CHANGE HAS BEEN NOTED IN THE CONSTRUCTION OF THE ONE- WHEN IT WAS FIRST OBSERVED. 3. KAPUSTIN YAR/VLADIMIROVKA MISSILE TEST CENTER (COMOR MOST OF THE CENTER IS OBSCURED BY CLOUDS. NO APPARENT CHANGE IS NOTED AT THOSE LAUNCH AREAS WHICH ARE DISCERNIBLE. 4. TALLINN AMM/SAM LAUNCH COMPLEX (COMOR ALL OF THE LAUNCH POSITIONS ARE NOW PARTIALLY ENCLOSED BY REVETMENT WALLS. TWO DARK CIRCULAR OBJECTS AT ONE OF THE POSITIONS ARE SIMILAR TO A PAIR SEEN AT THE SARY-SHAGAN ANTIMISSILE TEST CENTER. 5. CHEREPOVETS SUSPECT AMM/SAM LAUNCH COMPLEX (COMURI ONLY MINOR CHANGES IN CONSTRUCTION ARE VISIBLE THROUGH SCATTERED-TO- HEAVY CLOUDS, CLOUD SHADOW. AND HAZE. TOP SECRET 25X1 m 25X1 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET MISSION 1009-1, 6-9 AUGUST 1964 25X1 NORILSK AIRFIELD AND NORILSK' NW AIRFIELD ARE NOT OBSERVED DUE TO SCATTERED CLOUDS AND OBLIQUITY. HOWEVER, A NEW AIRFIELD WITH AN APPROXIMATELY 6,000 X 150 FOOT NE/SW RUNWAY IS UNDER CONSTRUCTION 16 NM WEST OF NORILSK. STATUS OF COMOR TARGET READOUT FORTY-NINE ACTIVE COMOR TARGETS WERE'OBSERVED IN THE CURRENT REPORTING. PERIOD AND ARE CONTAINED IN THIS REPORT. TOP SECRET 25X1 LJ/~ I 25X1 ^ 25X1 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET LAUNCH AREA G (SITE 6), THE COMPLEX AND PART OF THE SITE SUPPORT FACILIT AREA J (SITE 9) CAN BE IDENTIFIED BU DUE TO POOR QUALITY PHOTOGRAPHY, HAZ NO ABM ACTIVITY WAS OBSERVED IN THE PORTIONS OF THE WESTERN HALF OF THE SEARCH AREA. THE EASTERN PORTION WA VERKHNYAYA SALDA ICBM C NO SIGNIFICANT CHANGE IN LAUNCH AREA C (SITE 3), D (SITE 4), G (SITE 8), THE COMPLEX SUPPORT FACILITY, RAIL-T POINT, AND AUXILIARY SUPPORT FACILIT LAUNCH AREAS E (SIT LAUNCH AREAS 'A (SITE 2) AND F (SITE COVERED. NO ABM ACTIVITY NOTED WITHIN THE 50- AREA, WHICH IS 80 PERCENT CLOUD COVE SUPPORT FACILITY, Y AT LAUNCH T NOT INTERPRETED E, AND CLOUDS. CLOUD-FREE 50-NM RADIUS S NOT COVERED. S B (SITE 1), I (SITE 10), O-ROAD TRANSFER Y SINCE MISSION E 5), H (SITE 9), IDENTIFIED ONLY. 7) ARE CLOUD NM RADIUS SEARCH REDO COMPLEX WAS COVERED BY FAIR QUALITY STEREO PHOTOGRAPHY. NO SIGNIFICANT CHANGES SINCE MISSION TRANSFER POINT, LAUNCH AREAS A (SITE 1), C (SITE 3), D (SITE 4), E (SITE 5), AND F (SITE 6), OR AT THE PROBABLE COMMUNICATIONS ASSOCIATED FACILITY NORTH OF THE TRANSFER POINT AND SUPPORT-TYPE FACILITY BETWEEN LAUNCH AREAS C AND D. WERE OBSERVED AT THE RAIL-TO-ROAD TOP SECRET 25X1 LOA-1 25X1 25X9 25X1 I 25X1 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET (SITE 2) WERE IDENTIFIED ONLY. NO ABM ACTIVITY WAS OBSERVED IN THE CLOUD-FREE PORTIONS OF THE EASTERN TWO-THIRDS OF THE 50-NM, RADIUS SEARCH AREA. THE WESTERN THIRD WAS NOT COVERED. ITATKA ICBM COMPLEX UR 5650N 08536E NO SIGNIFICANT CHANGE IN LAUNCH AREA A (SITE 1) SINCE MISSION AND LAUNCH AREA B (SITE 2) SINCE LAUNCH AREA C (SITE 3) IS IDENTIFIED ONLY. THE COMPLEX SUPPORT FACILITY, RAIL-TO-ROAD TRANSFER. POINT, AND THE UNIDENTIFIED ACTIVITY EAST OF THE COMPLEX SUPPORT FACILITY ARE CLOUD COVERED. 0 NO ABM ACTIVITY NOTED IN CLOUD-FREE AREAS WITHIN A 50-NM RADIUS. APPROXIMATELY 80 PERCENT OF AREA CLOUD COVERED. NOVOSIBIRSK ICBM COMPLEX UR 5516N 08257E LAUNCH AREA D (SITE 4) IS IDENTIFIED ONLY. REST OF COMPLEX IS CLOUD COVERED. NO ABM ACTIVITY NOTED IN EASTERN HALF OF SEARCH AREA, WHICH IS 60 PERCENT CLOUD. COVERED. 25X1 VELSK AREA RAIL LINE UR 6105N 04206E NO SSM ACTIVITY IN VISIBLE PORTION OF 50-NM RADIUS SEARCH AREA. AREA 95 PERCENT CLOUD COVERED. TOP SECRET 25X1 25X1 25X1 I 25X1 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET GVARDEYSK MRBM LAUNCH SITE 2 UR 5445N 02109E NO HARDENED SSM ACTIVITY NOTED IN THE 25-NM RADIUS SEARCH AREA. SLAVSK MRBM LAUNCH SITE 2 UR 550ON 02129E NO HARDENED SSM ACTIVITY. NOTED IN 25-NM RADIUS SEARCH AREA. AREA CANNOT BE NEGATED DUE TO SCATTERED CLOUDS. 25X1 NO HARDENED SSM ACTIVITY NOTED IN 25-NM RADIUS SEARCH AREA. GUSEV MRBM LAUNCH SITE 1 UR 5441N 02205E NO HARDENED SSM ACTIVITY NOTED IN 25-NM RADIUS SEARCH AREA. AREA CANNOT BE NEGATED DUE TO SCATTERED CLOUDS. 25X1 NO NEW SSM ACTIVITY OBSERVED IN CLOUD-FREE PORTIONS OF 25-NM RADIUS SEARCH AREA. TOP SECRET 25X1 25X1 25X1 25X1 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET AREA CANNOT BE NEGATED DUE TO 85 PERCENT CLOUD COVER. VORU MRBM LAUNCH SITE 2 UR 5749N 02650E NO NEW SSM ACTIVITY OBSERVED IN 25-NM SEARCH AREA. AREA CANNOT BE NEGATED DUE TO HEAVY CLOUDS AND HAZE WHICH COVER APPROXIMATELY 85 PERCENT OF THE AREA. 4O HARDENED SSM ACTIVITY NOTED IN THE 25-NM RADIUS SEARCH AREA.. v - REA CANNOT BE NEGATED DUE TO SCATTERED CLOUDS. 25X1 IECAVA MRBM LAUNCH SITE UR 5633N 02420E NO EVIDENCE OF ELECTRUN-L" FACILITIES IN CLOUD-FREE AREAS. TOP SECRET 25X1 lox] 25X1 ^ 25X1 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET COMMUNICATIONS AREA APPEAR TO BE STILL ENTIFICATION ONLY. 25X1 POSTAVY MRBM LAUNCH SITE 2 UR 5506N 02700E 25X1 BOLSHAYA KAMENKA IRBM LAUGH SITE UR 5145N 04541E NO APPARENT CHANGE IN LAUNCH SITE AND SITE SUPPORT FACILITY SINCE BOTH REMAIN INCOMPLETE. NO CONSTRUCTION EQUIPMENT OR VEHICULAR ACTIVITY DISCERNIBLE IN LAUNCH AREA. THE NEW ROAD- UNDER CONSTRUCTION BETWEEN THE LAUNCH AREA AND THE THE POLCHANINOVKA-BOLSHAYA KAMENKA HIGHWAY HAS NOT BEEN EXTENDED, BUT HAS BEEN IMPROVED, SINCE KAPUSTIN YAR/VLADIMIROVKA MSL TEST GTR UR 4835N 04545E THE MAJOR PORTION OF THE KAPUSTIN YAR/VLADIMIROVKA MISSILE TEST CENTER IS OBSCURED BY CLOUDS. THE FOLLOWING SSM FACILITIES AND ELECTRONICS SITES ARE DISCERNIBLE, THOUGH FOR THE MOST PART NOT INTERPRETABLE. 25X1 ONLY. LAUNCH AREA 1C -- ID ONLY. LAUNCH AREA 2C -- ID ONLY. TOP SECRET 25X1 /-JA I 25X1 25X1 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET LAUNCH AREA 3D -- NAG SINCE LAUNCH AREA 40 -- NAG SINCE NO APPARENT CHANGE SINCE MISSION IN CLOUD-FREE AREAS. NO UNUSUALLY LONG RAIL CARS OBSERVED. _ KRASNOYARSK EXPLOSIVES PLANT ZLOBINO UR 5602N 09303E (IDENTIFICATION ONLY. AREA IS 75 PERCENT CLOUD OVERED. ---SOUTH SHORE OF SOVETSKAYA GAVAN -- 6 LARGE AND APPROXIMATELY 10 SMALL BUILDINGS AND 4 PIERS. A LARGE PRODUCTION-TYPE BUILDING LOCATED 0.5 NM WEST MAY BE ASSOCIATED. TOP SECRET 25X1 25X1 25X1 25X1 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET 25X1 25X1 25X1 VESSELS -- ONE CL, 3 DD, 4 DE WEST OF TORPEDO DEPOT, ONE DD, 2 DE, 2 PC NEAR THE PT BASE, 2 W/R-CLASS SS, ONE UBABLE MV-CLASS SS AT THE SUBMARINE BASE, ONE [lilt AT THE SEAPLANE STATION, ONE PROBABLE W/R-CLASS SS AND 3 DE AT THE SHIPYARD, AND 3 DE ANCHORED IN THE HARBOR. CONSTRUCTION HAS CONTINUED AT THE LAUNCH COMPLEX SINCE MISSION REVETMENT WALLS HAVE BEEN CONSTRUCTED AT FIVE-LAUNCH POSITIONS. ALL OF THE LAUNCH POSITIONS ARE NOW PARTIALLY ENCLOSED BY REVETMENT WALLS. A DARK, CIRCULAR OBJECT APPROXIMATELY IN DIAMETER IS OBSERVED ON 25 OF THE LAUNCH POSITIONS ON THE END OF THE POSITION NEAREST THE UNIDENTIFIED'FAC I=LITY: AT ONE OF THE LAUNCH'POSITIONS THERE ARE 2 DARK CIRCULAR OBJECTS PLACED AT EACH END OF THE PAD AND APPROXIMATELY 155 FT APART. A SIMILAR PAIR OF OBJECTS APPROXIMATELY 150 FT APART WERE IDENTIFIED AT SARY-SHAGAN ANTIMISSILE TEST CENTER LA H COMPLEX At SITE 3, PAD 5, ON A PARALLEL TRACE IS NOW OBSERVED ALONG THE NORTH FENCE LINE AND IS PROBABLY A SECOk D SECURITY FENCE UNDER CONSTRUCTION. FACILITY SINCE THE EASTERNMOST AND WESTERNMOST HEXAGONAL SITES AND PORTIONS OF THE OTHER THREE. SITES ARE VISIBLE WITH INTERPRETATION LIMITED BY SCATTERED-TO-HEAVY CLOUDS, CLOUD SHADOW, AND HAZE. THE SOUTHERN BORDER OF THE CENTRALLY LOCATED SITE HAS BEEN BROADENED SINCE TOP SECRET 25X1 LJ/~ I 25X1 25X1 Approved For Release 2008/01/03: CIA-RDP78T Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET 25X1- Im PHOTOGRAPHY EXTENDS SOUTH APPROXIMATELY 19000 FT FROM THE SW CORNER OF THE WESTERNMOST SITES THE SOUTHERN PORTION OF THE SECURED COMPLEX IS CLOUD COVERED. NO APPARENT CHANGE IS OBSERVED IN A SUPPORT AREA LOCATED APPROXIMATELY ONE NM WEST OF THE HEXAGONAL SITES. A"NORTH-SOUTH ROAD LOCATED APPROXIMATELY 19000 FT WEST OF THE SUPPORT AREA APPEARS TO HAVE BEEN WIDENED SINCE NO MISSILES, MISSILE-RELATED EQUIPMENT, ELECTRONICS, OR COMMUNICATIONS FACILITIES WERE OBSERVED. SEGMENTS OF THE HEXAGONAL SITES AND SECURITY FENCING WERE VISIBLE ON PHOTOGRAPHY OF MISSION WITH SNOW CONDITIONS AND HAZE TOP SECRET 25X1 lox] 25X1 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET AIRCRAFT -- 2 BEAR AND 2 PROBABLE BIS AREA, 10 BEAR ON SSW PARKING APRON, 7 BEAR/BISON ON CENTER HARDSTANDS, 7 BE PARKING APRON, 4 BEAR ON HARDSTAND AC GRASS AT NNE END OF FIELD, AND ONE ME WING ON ALERT APRON AT NORTH END OF F ENGELS AIRFIELD UR 512t41 04611E AIRCRAFT -- 33 BISON ON MAIN'PARKING ON IN LOADING BEAR AND 4 AR ON MAIN ROSS FROM MAIN DS, ONE BEAR ON DIUM STRAIGHT- IELD. APRON, ONE TRAIGHT-WING ARKING APRON, BADGER, AND ONE SMALL 2 UNIDENTIFIED , AND ONE TAND AREA. BISON IN MAINTENANCE AREA, 2 MEDIUM S AND 27 SWEPT-WING FIGHTERS ON NORTH P ONE BADGER ON MAIN PARKING APRON, ONE 3 PROBABLE CAB, ONE LIGHT TRANSPORT, STRAIGHT-WING ON SOUTH PARKING APRON, SWEPT-WING ON SOUTHWEST PARKING APRON POSSIBLE HOOK HELICOPTER IN LOADING S SCATTERED CLOUDS AND HAZE PRECLUDE F INTERPRETATION. AIRCRAFT -- 10 BADGER AND 3 PROBABLE 7E LIGHT TRANSPORT. 25X1 NORILSK AIRFIELD AND NORILSK NW AIRFIELD ARE NOT OBSERVED BECAUSE OF SCATTERED CLOUDS AND OBLIQUITY. TOP SECRET 25X1 lox] 25X1 25X1 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET A NEW AIRFIELD IS UNDER CONSTRUCTION AT 69-18N 087-23E, 16 NM WEST OF NORILSK. EARLY CONSTRUCTION CONSISTING OF A CONSTRUCTION BASE ALONG THE RAILROAD AT 69-22N 087-22E, A ROAD LEADING TO THE AREA OF CONSTRUCTION, AND FOUR BUILDINGS AT THE NEW AIRFIELD SITE WERE EVIDENT ON THE NEW AIRFIELD HAS AN APPROXIMATELY 69090'X 150 1-1 NE/SW RUNWAY UNDER CONSTRUCTION. SURFACE AND SERVICEABILITY UNDETERMINED DUE TO CONSTRUCTION. KALININGRAD/PROVEREN AIRFIELD UR 5446N 92025E NO APPARENT CHANGE SINCE MISSION AIRCRAFT -- 8 PROBABLE BADGER, 25 PROBABLE BLINDER, 2 POSSIBLE BLINDER, ONE MEDIUM STRAIGHT-WING, AND ONE UNIDENTIFIED SMALL AIRCRAFT OBSERVED IN CLOUD-FREE PORTIONS. BELAYA TSERKOV AIRFIELD UR 4947N 03001E AIRCRAFT -- 5 BEAR ON HARDSTANDS AT NE END OF FIELD, ONE PROBABLE BULL ON GRASS AT NE END OF FIELD, 62 BADGER ON HARDSTANDS AND GRASS ALONG EDGE OF LOOP TAXIWAY, AND 5 BADGER ON MAIN PARKING APRON. SCATTERED CLOUDS COVER SUPPORT FACILITIES. ZHITOMIR/SKOMOROKHI AIRFIELD UR 5010N 02844E AIRCRAFT -- 2 BADGER AND ONE PROBABLE BULL IN MAINTENANCE AREA. PARKING AREA LARGELY OBSCURED BY HEAVY CLOUDS. TOP SECRET 25X1 LOA-1 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET MISSION 1009-1, AIRFIELD LOCATED ON SOUTH COAST OF OSTROV VRANGELYA NEAR NE SHORE OF BUKHTA SOMNITELNAYA. 11,000 X 350 FT ENE/WSW GRADED EARTH RUNWAY, SERVICEABLE. KAZAN AIRFRAME PLANT GORBUNOV 22 UR 5552N 04907E . AIRCRAFT -- 21 BLINDER, 7 BADGER, 2 PROBABLE CAB, AND ONE MEDIUM STRAIGHT-WING. NO APPARENT CHANGE IN PLANT FACILITIES. TOP SECRET 25X1 lox] Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Nuclear Ens~~y Approved For Release 2008/01/03: CIA-RDP78TO5439A000400 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Next 2 Page(s) In Document Denied Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET MISSION 1009-1, 6-9 AUGUST 1964 NAVAL ACTIVITY/PORTS TALLINN NAVAL BASE & SHPYD MORSKOY ZAVOD UR 5927N 02444E IDENTIFICATION ONLY. RIGA NAVAL BASE UR 5703N 02402E ONE PROBABLE W/R-CLASS SS9 ONE AUXILIARY, AND SEVERAL UNIDENTIFIED SMALL VESSELS. GDYNIA NAVAL BASE OKSYWIE PO 5432N 01833E NO SUBMARINE BUILDING OR LOGISTIC FACILITIES OBSERVED. VESSELS -- ONE 400 FT DO, ONE 350 FT DD, AND ONE 250 FT SS. FOUR. UNIDENTIFIED VESSELS IN BASIN. POOR-QUALITY PHOTOGRAPHY PRECLUDES FURTHER INTERPRETATION OF SHIPS ON BUILDING WAYS. 25X1 TOP SECRET 25X1 LJ/~ I 25X1 I 25X1 pproved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 B1o1og1ca1/ Ch 4Drv Ia I Warlair? 9\ Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 ~Ioctronics/ Communications Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET. A 25-NM RADIUS OF DUSHAMBE. DENTIFIED WITHIN 25X1 NG STN UR 5717N 02235E HOWEVER, GROUND SCARS IN THE AREA OF THE INTERFEROMETERS INDICATE THE SITE IS STILL UNDER CONSTRUCTION. INTERFEROMETERS SINCE 24 TOP SECRET 25X1 25X1 25X1 25X1 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Othowr .Activity e Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET LOP'NOR AREA, SUPPORT BASE CH 4035N 08901E AREA 80 PERCENT CLOUD FREE. AIRFIELD RUNWAY HAS A BLACKTOP SURFACE. RUNWAY LENGTH IS 4,620 FT. AIRFIELD SUPPORT CONSISTS OF 2 SMALL PROBABLE HANGARS, 3 SMALL BUILDINGS, AT LEAST 30 TENTS? AND 13 POSSIBLE VEHICLES. TENT CAMP 1 -- POSSIBLE COMMUNICATIONS FACILITY JUST EAST OF TENT CAMP IS INDICATED BY POSSIBLE GUY WIRE TOP SECRET 25X1 25X1 25X1 25X1 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET MISSION 1009-1. 6-9 AUGUST 1964 BASES. HAZE AND OBLIQUITY PREVENT COMPLETE IDENTIFICATION. CAMP CONSISTS OF 4 POSSIBLE SMALL BUILDINGS AND ONE UNIDENTIFIED STRUCTURE. HAZE PREVENTS A TENT COUNT. TENT CAMP 2 -- IDENTIFICATION ONLY DUE TO ALMOST COMPLETE CLOUD COVER. ACTIVITY AREA -- CONTAINS 3 UNIDENTIFIED STRUCTURES, WITH A POSSIBLE BURIED PIPELINE CONNECTING TWO OF THE STRUCTURES. TOP SECRET 25X1 ?25X1 25X1 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78T05439A000400100038-5 TOP SECRET TOP SECRET 25X1 LOA"I 25X1 25X1 Approved For Release 2008/01/03: CIA-RDP78T05439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 NEWLY CONSTRUCTED REVETMENT WALLSE TOP SECRET TOP SECRET Approved For Release 2008/01/03 : 25X1 25X1 25X1 ^ 25X1 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Next 3 Page(s) In Document Denied Iq Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5 TOP SECRET 25X1 25X1 PREFACE TRACK OF MISSION 3 HIGHLIGHTS 6 MISSILES 8 AIR FACILITIES 16 NUCLE~R ENERGY 19 NAVAL:ACTIVITY/PORTS 22 BIOLOGICAL/CHEMICAL WARF ARE 23 ELECTRONICS/COMMUNICATIONS OTHER ACTIVITY ATTACHMENTS TOP SECRET Approved For Release 2008/01/03: CIA-RDP78TO5439A000400100038-5