CONSTRUCTION STATUS OF SUPORT FACILITIES AT COMPLEX J, TYURATAM MISSILE TEST CENTER
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05439A000400370065-0
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
13
Document Creation Date:
December 28, 2016
Document Release Date:
October 3, 2000
Sequence Number:
65
Case Number:
Publication Date:
March 12, 1965
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 707.57 KB |
Body:
ILLEGIB
Approved For Release 2001/03/03 : CIA-RDP78TO5439A000400370065-0
Approved For Release 2001/03/03 : CIA-RDP78TO5439A000400370065-0
25X1 D
H'ANOCD V1W,
TALENT-KEYI-16LE
CONTrOL STETM ONLY
Declass Re -iew by NIMA/DOD
-' FRCNI t
B JBJZCT s
Chief, Satlieti: ,Missiles and Space Division, OSI
TeOhni 1 Sitipport= Branch
Chief,,Re4uirements Branch, Reconnaissance Group, CGS
Chief, Phot.o phis Intelligence Division, CIA
Construction Sta of Support Facilytiee.,at Complex J,
'1'yuratam Missile b'e`st Center
(a Requirement C?515-82,293
(b CIA/PIt 1roect 30308-5
c Memorandum, M/TB 5/67 (TC8 1083/65)'
This''memoranda is in`esponse to your requirement dated 17 Februetr
1.y,
, Tyuratamf
-which requests codsputation of construction footage at Comp ~.
1965 lox
- - - - . f- - - - , f.'' _ These 25X1'.D..
and
S-f '47/
3?
cons
the lar
,extends
r'3 i3 sp
`build
since
of all
lay inc
tot
vhich
one f re an updating of a .previous. project
inn at Complex J from its onset- through
& 'to your Office in the memoraauvn referenced auvvv.
Sindd completion of the earlier project an arithmetic error ' in the
Due has come to light. This involved the square footage of the apart-
ccmputat
.ments be constructed in Area 18 as
c above. This same.error was also re
'
for orret
~rolved fbbnd ~ in the attachnente to. i
")uring the 6Q days between the coverages of
jtion.cpntinued at a steady pace at Complex J. The high bay section of
e aegembly~ and che'ckout bul.ldirig. is being roofed and the rail has been
fronts point near this building towards the large excavation. Another
.has'been constructed in the support facility and:-~74-Foot square
is under construction neatby. ltotal of 14 buildings were steamed
past coverage and 17 .buildings were copleted. A complete u$ tins .
uded,with the initial, memoranda on this subject snow d aga2u. be us ;Y;;
1Fe eu i areas in the complex.
TCS 2195/65
M/EB,78/65
12 March 1965
CopY_,.._....,,,_
yed in the attachments. to Reference
in the total footage figures given
Figtn'ee - for each of .the coverages in,
25X1.
25X1 D`
25X1 D
V1-ANDLr VIA
~fr
TALENT-K .Y_I'40LE
GONTHOI.' al"STET ONLY e3
HANDLE VIA
TALENT-KEYHOLE.
CONTROL STEM ON(,.Y
TOP $ECET RUFF
SUBJ$CT* Construction Status of Bi port Facilities at
CaupleX J, Tyuratem Missile Test Center
TCB 2195/65
M/zB 78/65
25X1 A
vho may be contacted?
rc~ act 1A uu
thi
'
s p
on
, The photo analyst
further questiofi cerning ? project.
~,~e 'an
exteoion- x,623- Phmlld you y
5. This protect Is cot idered to be c oplete.
25X1A
Tables-ot Construction Status -.10 pages
(CIA/P i /WM?p-149/65),
UNL-Y
'~dHRONOLOG CAL DEVELOPMENT OF
COMPLEX. "J"
YUAA TAM . MISSILE 'BEST CE i TER
KEYHOLE- MISSION
TOP SECRET-=RUFF
kJONSTRUC~ION -S{T'ITUS AS OFa
( Im COMPLETED BUILDING
Q BUILDING UNDER CONST.
? ~ ~~aT'oR ~ ~
. no , INFO - 4-4 awl,
Li M U -? U .
M
s~ n
Toot ~ .I ,.
OP SECRET-RUFF
Approved For Release 2001/03/03 : CIA-RDP78TO5439A000400370065-0
.0 H
CIA/PID/I1EB-$-1og/65
Attachment to:
: -
TCS 2195/65:
M/EB 78/65
a"b
CO_ S RUCTION -STATUS AT COIVIPL E~: "J"
T l`(JR : TATIM MISSILE TEST . CENTER
25X1 D
SQUARE FEET OF FIJC01D SPACE STAIaTED SINCE
LE COVERAGE,:
163,925
! i :~In TED SQUARE I~,EET' qf, FLOOR. SPACE COMPLETED
'E =d
S
CE L -
COVEY: ~S USABLE AGE
N
199, 725-
:
6. TOTr L U A`' ,E FEET 02 F_LOO ;. S'?;SCE COMPLETED
1,243,650
7. TOTAL Sti U
TOP ?SERL ,T HUFF
DE
OF T" 7 OORPACE UNDER CONSTRUCTION:
868,900
UNDER CC
Q
I,i12,550`
AND
TS F~ _: E EAKDoW.~, O CCNS 1 _,,J T `T
'6
10n, k,UC+
1
P :'~ u lx \? .U
' OP SEC_: T HUF F
CIA, PID/MEB-P-log/65
Approved For Release 2001/03/03: CIA-RDP78T05439A00G400370065-0
Attachment to:
TCS 2195/65
M/DB 78/65
CO ZS :,RUCTION STATUS AT OMMPLI-4) "3?
'25X1 D
TYURL1, MISSILE TEST CENTER
TOP' ' SECRET RUFF
SQUARE FE T OF FLOOR SPACE STARTED SINCE
E COVERAGE:`
185.,i5o
5. ESTI_viAT D SQUARE TWEET OF FLOO,
SINdLLAST USABLE COVE-1:'-GE:
6. TOTAL SQ1
S ")'CE COMPLETED
7Z-000
FEET; OF FLOOR SPACE CO-NMPLEIED:
TOTAL SQ
8. TOT --'-L S
r ?U D 7;R C;.
1:,820,825
i B L OWN OF CO\STRTJC _: ON
T
0? SEC ,,ET TJFi F
CIA/PID/MEB-P-109/65
Attachment ? to :
TCS 2195/65
M/EB 78/65
920,975
SPACE IJND: R CONSr2R ; CTI01,\T:
Approved For Release 2001/03/03 : CIA-RDP78TO5439A000400370065-0
. .l 1" E i 1,
~ST RUCTION:
.11:_ ESS BY 3UiL: i_,G
?2M5_0
TE AND
h
TOP SECRET RUFF
CON'SFfRUCTIOI~T STATUS Cdx1PLEX "J"
'?,YU ;A TA.,.I 'MISSIL
122,350
FEET OF 'FLOOK SPACE STARTED SINCE
- dATrp SQUARE
T 1 T w,.} A T Y1 /`~ /1 T T"'111 /1 T1 -
5.( ES T I }., =~'~'EL SQU:''_F. F =; T C i FLOOR SPACE COMPLETED
sSiNC ?!._?:_S '' US=ABLE COVE ,AG :.
' _~T..' 1 _
7. WID -L.,~
4
UNDER OONSTRUC*bN:
. 04,700
117,500
FEET O-.'. '.FLOORSPACE COMPLETED:
,1,038,1175
TO
IEST CENTER
ET RUFF'
S-l C. j7/
cIA/PID/NEB-P-1og/65
Attachment to:
TCS' 2195/65
M/EB 78/65
Approved For Release 2001/03/03 : C?lA-RDP78T05439A000400370065-0
v ='. L S' 7 LOOR SID C~ 'C C=,:PLETE ND
1,943,175
r.r , T A 'tJC __01
S__`E_"TS F0__" 3 PE _Ot1'N OF CO\ST ~
G _SS BY BUILDING
2,5X1 D
f
LAST USJ43L;E COVERAGE: I
18,700
5. .ESTID, AT fi D SQUARE FEET OF LOOK SPACE COMPLETED
SINCE LA $T USABLE COVER.' GE:
LL__
TOTAL SQUARE
TOP. SE~; R1 T ?' RUF F
EST 'OF FLOOR SPACE COMPLETED:
8L 8,97 __
TOTAL SC ~LJAR EE T . OF H -DOOR SPACE UNDER CONSTRUCTION:
-786; ?00
TOTAL S
EET OF F :.OOR SPACE COMPLETE AND
:~STRUCTION:
1635, 675
SEE SLIE.:.l1S FC.1 ';R?_AIDOWN OF. CONSTRUCTION
PROGRESS ? BY.-BUILDING . TYPE .
CON
STRUCTION STATUS AT COMPLEX "J"
A TAM .MISSILE: TEST CENTER
ESTIMAT D .SQUAB FEET OF FLOOR SPACE ST_ RTED SINCE
_ OP SL ~ : ! _lUF
. Approved For Release 2001/03/03 : CIA-RDP78TO5439A000400370065-0
CIA/PIDIMLB-P-10965
Attachment to:'
TCS 2195/65
M/EB 78/65
25X1'D
CONSTRUCTION STATUS AT COMPLEX "J"
'I' rUi A TAM MISSILE TEST CENTER
ESTIM-IAT~D SQUARE ! FEET OF FLOOR SPACE S i ARTED SINCE.
848,975
TOTAL SQU:'_RE FEE: OF FLOOR SPA-CE LTN:1E R CONSTRUCTION:
+~'S FO R '_:'L,OVVN OF CONSTRUC -ON
P lV~ 1~`.~~5.\r/JU1LL i\TCx riY2L
ti
E
TOP SECT -tiUFF
Approved For Release 2001103/03.: CIA-RDP78TO5439A0004010370065-0
SINCE 'LAST USABLE COVERAGE:
88,025
6. `TAT:-_L SQUARE FEET OF FLOO R SPACE CO1rPLETED:
168,475
5.- ESTI,'IATED SQUARE .FEET O-~ F BOOR SPACE C&MPLETED
ZOs~~1- FEET OF FLOOR SPAc COMPLETE
U i\L! ~L~ /_\ l it U V 11 V1`ir., 17534,175
2io.125
-'ESTT:~~Ar~ ED SOU 'E EET OE 'FLOOR. SP&CE COI.MMP7 LETED
SA GE LXST USABLE COV R
297,225
1 OT AL -S U. RE FEET OF FLOOR SP .C-E. CO_1 1-1
25X1 D -
760,950
F LCOi1 SPACE UNDER CGT _ ION:
ESTI=`,'i A TED SQUARE FEET OF FLOOR.. SPACE STARTED BSI ' E
7.
59300
C
T IJ a.~
T " r7, S''
L~?_;:r ER
TOP SECRET RUFF
CONSTRUC'T'ION STATU: :AT COMPLEX "J"
114
T 4JR A T X17 MISSIL
L
_R
TEST CENTER
1,354,150
S "-SETS FOR ;, E 'EOVi OF CONSTRUC _,.J\
TO!--, S 7Ty T
.Ct,..t.: .,.L I
n +{
LET' LIND
CIA/PID/MEB-P-log/65
Attachment to:
TCS 2195/65
. M/EB 78/65
Approved For Release 2001/03/03 : CIA-RDP78TO5439A0`00400370065-0
25X1 D
f C% IT i
5
..
?~CRTF l~ I OF I:, 'T
BuIEDII'G
13E,TJ~ r 1:.11
SIiICE L;'.5rt
SABiIE COI '/
L1.G t l'diY.
BIJ COU
l(1'.A.C, ll[J;G
I'C`21).
P ' ?T).
Rectangular, flat roofed, storage or shop
type.-' 75 X 170 Ft.
12,750
25)500
Rectangular, barracks type, single story
3450.
12
41,400
115 x ?30- Ft.
Rectangular, barracks type, single story
5850
93, 600
130 x 45 Ft.
"H" shaped'probable housing type, single
story, 2 1z5ng wings 50 X 140 Ft, 1 con-
necting wing 50 X 60 Ft.
17,000
136,000
"U"..shaped, single story with base 160 X
40 Ft. and. ;2 .rings 75 X 40 Ft.
Rectangular, single story, 130 X 40 Ft.
"T" shaped probable mess hall
"U" shaped building; single story with base
160, X 50 -Ft. and 2 wings _75. X40 Ft ,-_
Rectangular, 'barracks type, single story.
.150 X 50 Ft
single story building 55 X 55 Ft.
single story building 35 X 35 Ft.
V
4::r+ v ..
12,400
5200
11,250
12, 400
7500
3025
.1225
- 49, 600
Attachment to:
TICS 2195/65 M/EB 78/
CIA/PID/MEB-P-109/65
10, 400
33,750
12,400
97,500
12,100
2450- -
25,500
41, 400
16
93,600
136,000
4.
49,6070
2 10,400
3.. 33,750
12,400
97,500
12,100
2450
13-
P S IPTIG ? Ole' n.iIt:DJI1IG -
25X1 D
T" I
B1iT ,lllllG _Iff._, ,i:r.ST S Il'Cls I,~ST U/r;
"'SA.[!) ('OV.i!SAiTAE CO'J.
Rectangular building; .150 x,_50 Ft.
"H" shaped single story; 2 wings 40 X 220
Rectangular, Single story 180 X
Garage, single story. 140;? 180 Ft.
single story building'100 X 30
Garage, single story. 70 X 85 Ft.
25X1 D
Shed. 45.X 145 Ft.
Storage/shop type, single story40 X 120 Ft.
Rectangular Building, Single story
45 X 125 Ft.
-3 batch= plants and 3 -sets of -storage..silos
each set of silos is 220 Ft. long and
60 Ft..high.
Storage sheds., -single story, rail served.,
155 X, 70 Ft.
-155 X 90-Ft,--.
210 X 55 Ft.
155x6oFt.
Cylindrical water tower 65 feet high,
30 feet in diameter.
I
7500
20, 350
9,000
8,4oo
3, 000
5", 950
3,825-' -
6, 525
4,800
5,625
10,850
l3, 950--
11, 550
9,300
TCC.'.T, 1,r,zrt
40,700
18,000
8.400
17,850
3,825
6,525
M/EB2731655
CIA/PID/MEB-P-109/65
Attachment to:
30)000
40,700
18,000
8, 400
- 3,000
19,200
11,250
,.1.71850
3,825
6,525
4 ! '19,200
11,250 A_..
10,850 1 10,850
13,-950 ! _. 1 13,950-
11,550 1 11,550
9300 1 9,300
Storage shed, single story;?55 K 115 Ft.
Building 170. Ft. square, area;-ail served
Multistory apartments; probably 3, floors
240 X 50 Ft.
Rectangular, single story; 170 X 55 Ft.
Multistory apartments,, probably 3 floors;.,
6o X 26o Ft.
Probably 2 floor buildings; 205 X 70 Ft.
Rectangular, probably,2 floor 5Q K-100 Ft.
21. Assembly building; rail served; 3 bays
800 ft. long-,125-ft. wide and 175 ft.high;
2 bays 800 ft-. l6ng.100 ft wide and
100 ft. high.