ADMINISTRATION AND HOUSING AREA, MAIN SUPPORT BASE, TYURATAM MISSILE TEST CENTER
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05439A000400380007-3
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
13
Document Creation Date:
December 28, 2016
Document Release Date:
June 29, 2000
Sequence Number:
7
Case Number:
Publication Date:
March 17, 1965
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 1.16 MB |
Body:
ILLEGIB
Approved For Release 2001/03/03 : CIA-RDP78TO5439A000400380007-3
Approved For Release 2001/03/03 : CIA-RDP78TO5439A000400380007-3
HANDLE VIA
TALENT-KEYHOLE
CQNTROL SYSTEM ONLY
MEMORANDt 4 FOR: Chief, Ballistic it ss les. and
4MENTION:
r':- Chief, Photographi~ Intelligence,Division, -CIA
iy urrir.:im ru s s i.i.e 1 st Center
(a) Requirement C f;I4 82,007_
i(b) ',CIA/PID Project- 30956-4. ; -25X1 D
25X1D
1964 which requests a print of
Housing Area, TTMTC; a print o
bizi l iii construction suubsequent to
buildings and approximate addition
and location of the cosmcxiaut
25X1 D 2. 'Pmts of the
Gating construction dur g
of the results is as follows:
Type of Building
Personnel Housing
Administrative
Storage and Shop
All measurements have
be construed as being
Division.
No. of New Buildings
25X1A
THROUGH - - Chief, Requirements Branch, Reconnaissance Group, CGS
1~
;3. The remainder of the requirement, dealing with the location-of the cosmo-
nauts cottage and possible SRF training facilities, has-been' separately answered..
I
see C reports HTA/JR-4/58 (Sep 50J and PIC/JR-2/60 (Feb 60).
157
40
123
TCS 2318/65
M/EB 84/65
'17 March 1965
Copy
ce Divvision, OSI
are enclosed. A tabular summary
been made by the,CIA/PID project
mensuration data compiled byhe
Total Floor Space(Sq.Ft.)
3,208,395
686,755
656,lo5
analyst. They should not
NPIC Technical Intelligence
25X1 D
Construction, mainly of personnel-type housing, continued during_
and is still going on. For total floor space constructed prior to this interval,.,
NP
Declass Review by NIMA/DoD
GROJF f
Excluded frrn vti ? I
down -rv'ng nd
dtclts^Irtc.flcn
25)(:11J
se to-your 314quirement dated 9 November
hotography of the Administration and
'photography with overlay, indicating
_ an estimate of the number of new
floor space completed between wand
cottage and possible SRF_training facility.
photography, together with an overlay indi-
HANDLE VIA
TALENT-KEYHOLE
CONTROL SYSTEM ONLY
/ & Z/ Yo
HANDLE VIA -
TALENT-KEYHOLE:
CdNTRPL SYSTEM ONLY
TOP SEC"- T CHESS RUFF
SUBJECT: Adm* 1stration and Housing Area, in Support TCS 2318/65
Base, Tyuratam Missile Test, Center M/EB 64/65
25X1A
!t-. The photo analyst on this roject is who may be contacted
on extension 2078 should you have any further questions concerning this project.
5. This project is considered to be c
Enclosures : 25X1 D
(1,) One print -
one overlay (TCS 98059-CIA PID
(2) One print -
P-116/6
--25X1 D
- with
B-P-11.5/
CIA/PID/rB-
25X1A
/&4Yo
HANDLE V1A
TALENT-KEYHOLE
TOP SECRET CHESS RUFF CONTROL SYSTEM ON
Cb-RUC IoN SuTPO T AREA
AREA OF CONTI7U"" CONSTRUCTION
TOP SECRET RUFF
COMP
LEX SUPPORT FACILITY, TTII
FACILITY, TTA