AIRCRAFT ENGINE PLANT NO 478 ZAPOROZHYE, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000400420054-6
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 29, 2001
Sequence Number: 
54
Case Number: 
Publication Date: 
March 1, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000400420054-6.pdf192.08 KB
Body: 
Approved For Release 2001/09/03 : CIA-RDP78TO5439A000400420054-6 Approved For Release 2001/09/03 : CIA-RDP78TO5439A000400420054-6 F, 4 4 Pages I March 1965 copy TCS-84005/65 CENTRAL INTELLIGENCE AGENCY PHOTOGRAPHIC INTELLIGENCE REPORT AIRCRAFT ENGINE PLANT NO 478 ZAPOROZHYE, USSR DECLASS REVIEW BY NIMA / DoD Handle ViaTALENT - KEYHOLEControl Only PHOTOGRAPHIC INTELLIGENCE DIVISION Handle Via TALENT-KEYHOLE Control System Only AIRCRAFT ENGINE PLANT NO 478 ZAPOROZHYE, USSR ? 25X1A 25X1A is located in the southern section o aporozhve, USSR, at 47-49-30N 3.5-11-40E (Figure 1). The plant is road served and en- closed by a fence. Two rail s urs which were under construction in will serve the plant when completed. Components of the plant are described in Table 1, and item numbers used in the table a ear in Figure 2. In the "!_aporozhve Aircraft Engine Plant No.478 contained approximately 1,287,575 square feet of floorspace. A compari- son of that photography with KEYHOLE pho- square feet plant. By TOP SECRET CHESS RUFF indicated that 465,725 had been added to the feet. Since _6 buildings have been added 25X1D to the plant, and 2 existing structures have been expanded. Buildings erected since that time include 2 workshops, an engineering/adminis- tration building, a probable assembly building and 6 througi??engine test cells, an admini- stration building, and 1 storage building. A total of 30,400 square feet of floorspace has bin added to an existing workshop. . In the subassembly building 25X1 D (item 2'1), the probable assembly building and 6 through engine test cells (each 130 by 40 feet) (item 22), and the administration building (item 23) were under construction; work on the ex- pansion of an existing workshop (item 20) in the northern part of the plant was observed for the first time. By the subassembly TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control System Only building and the expansion of the workshop had under construction. By all, build- been completed, and 2 workshops (items I and ings in the plant had been, completed, and test 9), an engineering/administration building (item cells were probably being removed from an 19), and a storage building (item 24) were old assembly building (item 16). la5(r I. !'on,punrnts r./ t/,; /,a1?rAircraft F. n!/inr Plant %a X78 (It. m nrtrnher.s'appear in Figure- Dim,-n? ion-' Floors pac?o (ft) o (-y ft) O P 25X1 D 1 11ork=l,op 6511 x !411 156,11111) 2 Adrnini-tration bldg, -tare 25 . 50 :1:1,750 :1 Admini-oration bldg, 3-tor., Irregular ""19 5 0 4 St.amp)gnt -(1 -, 35 2,F(10 Honig,, hld1 190 ? 50 !),5011 6 1dn.tini-tration bldg, 1--tor) 175 1.. 31,511() 7 %ork A..p rnachit,r -hop Irregular h6s,20O Storag.? 3d 115 75 ti_' 9 Rork-hop 1tii. ? 75 12,37.. 10 1--onihlc 4 muchin.? -hop 1,31() 3211 119,200 11 Irk-hop 105 \ 15 4,725 12 ~.-emh1~ bldg . 7 engtno to-1 cell. 69 i \ 250 173,75(. 13 Vuchine -hop 320 x 155 I!1,600 14 Forge foundre Irregular 4!1,575 1b Foundre 500 x 110 55,000 16 Old a--ernblc bldg & ...gin.- to-t call- Irregular (15,0110 17 Forgo Irregular 39,450 1h \iachin. -hop 341) 270 91,1.0() 19 Engineering udnunr;tratton bldg 200 65 1:1,000 20 Nork- hop 420 190 79,600 21 Suba:- t-T.hly bldg 550 340 1!+7,000 22 Probnblo n--eml,lc bldg 1 6 through engine t.?-r cell- :110 13(1 40,:100 23 %dn:ini-tration bldg, L--hoped 47,h0O log :1,111 , 11(1 leg 100 ? 60 24 Storage hldl; 130 O 10,400 25 ('onto,( bldg 200 x 7 5 15,000 Total floor-pare of nuritberod bldg- 1,743,101) Total floor-pace of otlx?r bldg- i 1(1,211(1 ' %II dimension- are appro\imate and were calculated I,\ photoaran:metri-t- in \PIC TID. TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control System Only --- Railroad under construction Road -~ - Fence o Structure [IN FIGURE 2. ZAPOROZHYE AIRCRAFT ENGINE PLANT NO 47 TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control System Only Handle Via TALENT-KEYHOLE Control System Only SAC. I'S Air Target Chart. >orio: 200, Shoot 02!19-1IIL. 4th i?d. D. 63. ~Valo I:200,000 (SECRET) TOP SECRET CHESS RUFF TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control System Only