AIRCRAFT ENGINE PLANT NO 478 ZAPOROZHYE, USSR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05439A000400420054-6
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
6
Document Creation Date:
December 28, 2016
Document Release Date:
August 29, 2001
Sequence Number:
54
Case Number:
Publication Date:
March 1, 1965
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 192.08 KB |
Body:
Approved For Release 2001/09/03 : CIA-RDP78TO5439A000400420054-6
Approved For Release 2001/09/03 : CIA-RDP78TO5439A000400420054-6
F, 4
4 Pages I March 1965
copy TCS-84005/65
CENTRAL INTELLIGENCE AGENCY
PHOTOGRAPHIC INTELLIGENCE REPORT
AIRCRAFT ENGINE PLANT NO 478
ZAPOROZHYE, USSR
DECLASS REVIEW BY NIMA / DoD
Handle ViaTALENT - KEYHOLEControl Only
PHOTOGRAPHIC INTELLIGENCE DIVISION
Handle Via
TALENT-KEYHOLE
Control System Only
AIRCRAFT ENGINE PLANT NO 478
ZAPOROZHYE, USSR
? 25X1A
25X1A
is located in the southern section o
aporozhve, USSR, at 47-49-30N 3.5-11-40E
(Figure 1). The plant is road served and en-
closed by a fence. Two rail s urs which were
under construction in will serve
the plant when completed. Components of the
plant are described in Table 1, and item numbers
used in the table a ear in Figure 2.
In the "!_aporozhve Aircraft
Engine Plant No.478 contained approximately
1,287,575 square feet of floorspace. A compari-
son of that photography with KEYHOLE pho-
square feet
plant. By
TOP SECRET CHESS RUFF
indicated that 465,725
had been added to the
feet. Since _6 buildings have been added 25X1D
to the plant, and 2 existing structures have been
expanded. Buildings erected since that time
include 2 workshops, an engineering/adminis-
tration building, a probable assembly building
and 6 througi??engine test cells, an admini-
stration building, and 1 storage building. A
total of 30,400 square feet of floorspace has
bin added to an existing workshop.
. In the subassembly building 25X1 D
(item 2'1), the probable assembly building and
6 through engine test cells (each 130 by 40 feet)
(item 22), and the administration building (item
23) were under construction; work on the ex-
pansion of an existing workshop (item 20) in
the northern part of the plant was observed for
the first time. By the subassembly
TOP SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
building and the expansion of the workshop had under construction. By all, build-
been completed, and 2 workshops (items I and ings in the plant had been, completed, and test
9), an engineering/administration building (item cells were probably being removed from an
19), and a storage building (item 24) were old assembly building (item 16).
la5(r I. !'on,punrnts r./ t/,; /,a1?rAircraft F. n!/inr Plant %a X78 (It. m nrtrnher.s'appear in Figure-
Dim,-n? ion-' Floors pac?o
(ft) o (-y ft)
O
P
25X1 D
1
11ork=l,op
6511 x
!411
156,11111)
2
Adrnini-tration bldg, -tare
25 .
50
:1:1,750
:1
Admini-oration bldg, 3-tor.,
Irregular
""19 5 0
4
St.amp)gnt
-(1 -,
35
2,F(10
Honig,, hld1
190 ?
50
!),5011
6
1dn.tini-tration bldg, 1--tor)
175
1..
31,511()
7
%ork A..p rnachit,r -hop
Irregular
h6s,20O
Storag.? 3d
115
75
ti_'
9
Rork-hop
1tii. ?
75
12,37..
10
1--onihlc 4 muchin.? -hop
1,31()
3211
119,200
11
Irk-hop
105 \
15
4,725
12
~.-emh1~ bldg . 7 engtno to-1 cell.
69 i \
250
173,75(.
13
Vuchine -hop
320 x
155
I!1,600
14
Forge foundre
Irregular
4!1,575
1b
Foundre
500 x 110
55,000
16
Old a--ernblc bldg & ...gin.- to-t call-
Irregular
(15,0110
17
Forgo
Irregular
39,450
1h
\iachin. -hop
341) 270
91,1.0()
19
Engineering udnunr;tratton bldg
200 65
1:1,000
20
Nork- hop
420 190
79,600
21
Suba:- t-T.hly bldg
550 340
1!+7,000
22
Probnblo n--eml,lc bldg 1 6 through
engine t.?-r cell-
:110 13(1
40,:100
23
%dn:ini-tration bldg, L--hoped
47,h0O
log
:1,111 , 11(1
leg
100 ? 60
24
Storage hldl;
130 O
10,400
25
('onto,( bldg
200 x 7 5
15,000
Total floor-pare of nuritberod bldg-
1,743,101)
Total floor-pace of otlx?r bldg-
i
1(1,211(1
' %II dimension- are appro\imate and were calculated I,\ photoaran:metri-t- in \PIC TID.
TOP SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
--- Railroad under construction
Road
-~ - Fence
o Structure
[IN
FIGURE 2. ZAPOROZHYE AIRCRAFT ENGINE PLANT NO 47
TOP SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
Handle Via
TALENT-KEYHOLE
Control System Only
SAC. I'S Air Target Chart. >orio: 200, Shoot 02!19-1IIL. 4th i?d. D. 63. ~Valo I:200,000 (SECRET)
TOP SECRET CHESS RUFF
TOP SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Control System Only