MENSURAL DATA ON SINGLE SILO CONTROL BUNKERS AND INTERFEROMETERS AT SELECTED ICBM COMPLEXES, USSR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05439A000500020015-2
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
7
Document Creation Date:
December 28, 2016
Document Release Date:
November 21, 2000
Sequence Number:
15
Case Number:
Publication Date:
April 6, 1965
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 265.99 KB |
Body:
ILLEGIB
Approved For Release 2001/06/09 :CIA-RDP78T05439A000500020015-2
Next 1 Page(s) In Document Exempt
Approved For Release 2001/06/09 :CIA-RDP78T05439A000500020015-2
. {
' HANtj'LE' VIA'
TALENT-KEI~HOLE
CONTROL SYSTEM ONLY
acs 2764/65
6 April 195
SPY
MPMORANDiM FOR: Chief, Manufacturing and Services Division, OR$
- - Chief, Ballistic Missiles-,and : Space ~ Division, . OSI
25?C1A Ate:
- - Tffi30~1GH:
.~
. FRCM: ~
StIDJ'E~ I'
.~
-
~b~ C,IA/PTD?~ro~ect 30454-5-
&tiD~ 1
Euladad item aataraatta
. do~gndtng and
declas:iticatloa
ferometers at -Selerrted ICH~I Complexes, USSR
~D-ECLA~~-R-E~ft~1IV by NIMA/DOD ,
1. This memq~~;ndum is in response to your .requirement dated 19 March 1965,
which requests m~n>?'ural data on-control bunkers and interferometers identified
techniques, but it is estimated-to be on the order of 20 feet deep. The 110 by 60
feet building,-upon completion, rises to near surface level, and is then earth .
covered.' It is positioned 300 .to 500 feet Pram the launch silo.
In th'l~ is emplaced one building which measures 110 by 60 feet. Near this build-
ing and within the excavation is the intersection of .the legs~~"th~'{'L"-'shaped
interferometer. Positioned at the apex-of the "L" is a small ,structure pirobgbly-
recte-ngulsr. in shape. 'fie size of the -excavation observed''at the Type III-C sites
is such that more than one building, 110 by 60 feet, could be acca~odated although
-there~has been no evidence~of additional construction identified other than already
mentioned. The-depth of this excavation ct~nnot be determined by photogra~etric
3. At Type III-C sites a single large excavation, about 250 feet long and
at least 130 feet wide, is initially prepared for the probable control bunker.
this .report as Eaclosures 1-8. '
at single -silo YCH~I lalmch sites in the USSR.
. ., a ,
? r - _
2. A number of the specific measurements requested in'your requirement can-
not be derived Pram available photography. However, it has been determined that
?the probable control: bunker at the Type-III-C and Type III-D ICBM launch si't~s are
of two distinctly different designs . TYie "~." interferometers appear identical at
both type sites. Generalized sketches of four of the probable control bunkers,>
together.with line drawings of Tyuratam Le.uach Complex ~I", Imeni Ga$tello haunch
- Site D, Olovyannaya Launch Site D-7, and Drovyannaya Launch Site G-2, accompanry,'.
Construction Branch
Z~echniaal support Branch
Chiefs Requirements Branch,- Recopnaissance Grouper ~
: -