CONSTRUCTION ACTIVITY PENG HSIEN, COMMIUNIST CHINA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05439A000500020039-6
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
4
Document Creation Date:
December 28, 2016
Document Release Date:
November 21, 2000
Sequence Number:
39
Case Number:
Publication Date:
April 15, 1965
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 202.99 KB |
Body:
ILLEGIB
Approved For Release 2001/03/03 : CIA-RDP78TO5439A000500020039-6
Approved For Release 2001/03/03 : CIA-RDP78TO5439A000500020039-6
DECLASS REVIEW by NIMA/DOD
NANDCE, VTA .
TALENT-KEYHOLE
CONTROL SYSTEM ONLY
TCS - 2705/65
IB - 145/65
15 April 1965
Copy #
MENARANDUM FUR: Chief, Marittfacturing and Services Division, ORR
25X1 A ATTENTION
M/MS
SOUGH Chief, Requirements Branch, Reconnaissance Group, CGS
FROM _ Chief, Photographic Intelligence Division, CIA
SUBJECT Construction Activity Peng Bsien, Communist, China
REF' CES- (1) ORR Requirement No. C-RR5-82,343
(2) CIA/PID Project No. 30382-5
.,I. This memorandum 3_s in. response to the referenced requirement which
asks for._s search of the Peng Hsien area to veri_r reports that unidentified
new construction or expansion of existing facilities is in progress.
2. A search wascopducted within a 25 mile radius of the city of Peng_
Hsien, to include all of.the Peng Hsien administrative district. This.search
revealed a new industrial facility located approximately eight miles north-
west of the city of Peng Hsien at coordinates 31 04N - 103 51E.
The function of the plant is unknown, although it appears to be some
type of light. fabrication facility. The complex has two probable machine shops,
a sub-assembly/final assembly building, a possible administrative/engineering
building and other smaller unidentified structures. Construction is underway
on a possible steam plant in the southern part of the complex; all other build-
ings appear to be complete. The plant is not rail-served.
25X1D -
The facility did not exist on At that time,
25X1 D- the land onwhich,~the factory is located was being cultivated and the village
25X1D appeared much,as it does on The present plant facilities were
nearly finished when observed in and with the exception of the
25X1 D possible steam plant, were complete by
3. The photo analyst assigned to this project was
who may be contacted on extension 2547 should you have further questions