OAK-PART III MISSION 1018-1 26-29 MARCH 1965
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05439A000500030025-0
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
36
Document Creation Date:
December 9, 2016
Document Release Date:
August 22, 2000
Sequence Number:
25
Case Number:
Publication Date:
April 1, 1965
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP78T05439A000500030025-0.pdf | 1.49 MB |
Body:
7 -4fr-t!i'!", o'rr, fr4;4";,.."."" 4Provr?f:frdf:ir -,F, =di; -- 7:1,-,-; "'AV: ' r?III; P P'41:
/
Copy i'
32 Pogits
!
;
P J,d
1111111111111
PHOTOGRAPHIC INTERPRETATION REPORT.
OAK-PART III
MISSION 1018-1
26-29 MARCH 1965
Declass Review by NIMAIDOD
CIA
DIA
TC5-80486/65
April 1965
/702Y
Handle Via TALENT - KEYHOLE Control Only
WARNING
This document contains classified information affecting the notional security of the United States within the
meaning of the ?spionage lows U. S. Code Title 18, Sections 793 and 794. The law prohibits its transmission
or the revelation of its contents' in any manner to an unauthorized person, as well as its use in any manner
prejudicial to the safety or interest of the United States Or for the benefit of any foreign govelnment to the.
detriment of the United States. It is to be seen onlyi by personnel ?specially indoctrinated and authorized to
receive TALENT-KEYHOLE information. Its security must b? maintained in accordance with KEYHOLE and
TALENT regulations.
NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
ior
Handle Via-
TALENT-KEYHOLE
Control SysterriOnly
TOP SECRET CHESS RUFF
MISSION 1018-1, 26-29 MAR 65
TABLE OF CONTENTS
- PREFACE
TRACK OF MISSION
'HIGHLIGHTS
MISSILES!
NUCLEAR-ENERGY
COMPLEXES
ATTACHMENTS
1
TOP SECRET CHESS' RUFF
TCS-80486/65
2
7
22
24
APPENDIX -
Handle Via
. TALENT-KEYHOLE
Control System Only.
_ Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
MISSION 1018-1, 26.29 MARCH 1965
TCS-80486/65
CDAK - PAR-r
? BicDN 101 8-1
? PREFACE
THIS IS THE THIRD OF SEVERAL OAK REPORTS ON _MISSION 1018-1
AND PROVIDES INFORMATION ON THOSE -COMMITTEE ON OVERHEAD .
RECONNAISSANCE (COMOR) TARGETS OBSERVED ON THE PHOTOGRAPHY.
aelk
TARGETS ARE ARRANGED----IN THE OAK BY SUBJECTAND WITHIN EACH SUBJECT
BY COMOR TARGET NUMBER. :TARGETS OF OPPORTUNITY OBSERVED DURING
THE-OAK REPORTING PERIOD'ARE LISTED NUMERICALLY UNDER THE
APPROPRIATE SUBJECT AFTER THE LISTING OF COMOR TARGETS.
LOCATIONS OF TARGETS IN THIS REPORT ARE INDICATED BY THE COUNTRY
CODE PRECEDING THE COORDINATES.
SELECTED PHOTOGRAPHIC REFERENCES FOR EACH TARGET OBSERVED AND
REPORTED FOLLOW THE DESCRIPTION OF THE TARGET. PASS NUMBERS ARE
SUFFIXED WITH EITHER AN A FOR ASCENDING (SOUTH?TO?NORTH) OR
D FOR DESCENDING (NORTH?TO?SOUTH). FRAMES ARE.INDICATED BY .THE
LETTERS FR. THE LETTER F PRECEDING FRAME.NUMBERS INDICATE-S THE
FORWARD CAMERA, AND THE LETTER A INDICATES THE AFT CAMERA.
UNIVERSAL REFERENCE GRID (X?Y) COORDINATES ARE GIVEN IN PARENTHESIS
AFTER THE FRAME TO WHICH THEY APPLY. THIS GRID IS IDENTIFIED AS
UNIVERSAL GRID NO 1, FEB 64. SYMBOLS INDICATING CONDITIONS WHICH
AFFECT THE APPEARANCE OF THE TARGET ON THE PHOTOGRAPHY ARE AS
FOLLOWS C (CLEAR)/ H (HAZE)/ CS (CLOUD SHADOW)/
HC (HEAVY CLOUD COVER)/ SC (SCATTERED CLOUD COVER), SD
(SEMIDARKNESS), 0 (OBLIQUITY)/ S (SNOW), PQ (POOR IMAGE QUALITY).
OAK RECIPIENTS ARE CAUTIONED THAT THE INITIAL SCAN-OF THE
PHOTOGRAPHY IS BEING ACCOMPLISHED IN A SHORT TIME AND PRIOR TO
FINAL REFINEMENT OF EPHEMERAL DATA. CONSEQUENTLY/ FUTURE DETAILED
ANALYSIS MAY RESULT IN MINOR ALTERATIONS.
2
TOP SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
25X1D
Approved For Release 2000/09/08 : CIA-RDP78T05439A000500030025-0
Next 1 Page(s) In Document Exempt
Approved For Release 2000/09/08 : CIA-RDP78T05439A000500030025-0
25X1D
Handle Via
TALENT-KEYHOLE
Control System Only
. TOP SECRET CHESS RUFF
MISSION 1018-1, 26-29 MAR 65
HIGHLIGHTS.
1. TYpRATAM MISSILE TEST CENTER 1111111i
25X1A
TCS-80486/65
THE CENTER IS COMPLETELY COVERED BY CLOUD?FREE PHOTOGRAPHY,.
BUT HAZE LIMITS INTERPRETATION OF THE WEST HALF OF THE RANGE HEAD.
AN OBJECT APPROXIMATELY 105 FT HIGH, POSSIBLY A MISSILE, IS
ERECTED ON PAD Cl. A POSSIBLE TRANSPORTER IS ALIGNED WITH THE
ERECTOR/LAUNCHER ON PAD C3. THEIR OVERALL LENGTH IS 180 FT.
THE GANTRIES FOR G4 AND G6 ARE ON THEIR PADS. .HAZE AND DARKNESS
OF THE IMAGE PRECLUDE DETERMINATION' OF WHETHER A MISSILE IS IN
EITHER GANTRY. A POSSIBLE MISSILE DOLLY APPROXIMATELY 105 FT'
LONG IS ON THE RAIL SERVING THE PAD AT 111..
AT COMPLEX J, THE HIGH BAY OF THE LARGE BUILDING IS
APPROXIMATELY 75 PERCENT ROOFED. THERE ARE 3 ADDITIONAL
SHALLOW RECTANGULAR EXCAVATIONS IN THE AREA OFTHE CONSTRUCTION
ACTIVITY LOCATED APPROXIMATELY 400..FT NW OF THE ALARGE EXCAVATION.
NEW UNIDENTIFIED CONSTRUCTION ACTIVITY IS OBSERVED 1.5 NM SW
OF THE PROPELLANT PRODUCTION PLANT. THIS ACTIVITY IS SIMILAR
TO NEW CONSTRUCTION ACTIVITY AT KAPUSTIN YAR ANDAT APPEARS
THESE 2 ACTIVITIES WILL BE IDENTICAL WHEN COMPLETED. '
2. DROVYANAYA ICBM COMPLEX
25X1A
A NEWLY IDENTIFIED PROBABLE LAUNCH SITE IN AN UNDETERMINED STAGE
OF CONSTRUCTION IS LOCATED AT 51720N 1i3-04E AND IS _DESIGNATED
PROBABLE LAUNCH SITE G16.
AREA G10 HAS SHOWN NO SIGNS OF ACTIVITY SINCE IT WAS FIRST
OBSERVED ON AND IS NO LONGER' CONSIDERED
TO BE A SUSPECT LAUNCH SITE..
3. GLADKAYA ICBM COMPLEX'
25X1A
A POSSIBLE NEW GROUP OF LAUNCH SITES HAS BEEN IDENTIFIED
APPROXIMATELY 15 NM WNW?OF THE CSF. THIS GROUP, DESIGNATED AS
POSSIBLE LAUNCH GROUP Gs CONSISTS OF 3 POSSIBLE LAUNCH-SITES.-
4. KAPUSTIN YAR/VLADIMIROVKA MSL TEST CTR
25X1A
THE ENTIRE CENTER WAS COVERED BY-CLEAR FAIR? TO GOOD7Q4ALITY
,PHOTOGRAPHY.- 'AIRCRAFT. PRESENT AT XAPUSTIN _YAR.AIRFIELD
INCLUDE 12 CAB, 3 CRATE, 9 LIGHT STRAIGHT?WING AND 8 POSSIBLE
LIGHT HELICOPTERS. A RAIL?SERVED PROBABLE ERECTOR/LAUNCHER
IS SEEN ON LAUNCH PADS 1C-2 AND IC-3. AN SS4fSS5 MISSILE
EXERCISE IS OBSERVED ON THE SOUTHERN .PAD F LAUNCH AREA 2C
AND ANOTHER PROBABLE MISSILE EXERCISE IS BSERVED IN
5
TOP SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Coqtrol System Only
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
\MISSION 1018-1, 26-29 MAR 65
TCS-80486/65
LAUNCH AREA 3C. NEW UNIDENTIFIED CONSTRUCTION ACTIVITY
SIMILAR TO THAT OBSERVED 1.5 NM SW OF THE-PROPELLANT
PRODUCTION PLANT, TYURATAM MISSILE TEST CENTER, IS NOTED
APPROXIMATELY 0.5 NM NORTH OF THE FORMER ROCKET LAUNCH COMPLEX.
? ?
5. SARY-SHAGAN ANTIMISSILE TEST CENTER .25X1A
ALL FACILITIES AT THE -TEST CENTER EXCEPT SITE 13 AND THE POSSIBLE
FIELD LAUNCH POINT ARE COVERED ON 2 PASSES BY STEREO PHOTOGRAPHY
LIMITED BY HAZE AND IMAGE QUALITY.
6.. PAO-TOU SAM SITES (MISSILE BONUS #1 AND #3)
ONE COMPLETED SA-2 SAM: SITE AND 1 PROBABLE SA-2 SAM SITE '
UNDER-CONSTRUCTION ARE NEWLY IDENTIFIED. THE-COMPLETED SITE
IS LOCATED 9.5 NM NNE OF PAO-TOU AT 40-45-20N 110-04-30E AND THE
PROBABLE SITE IS LOCATED 41 NM NNW OF PAO-TOU AT 41-14-10N
109-41-00E.,
7. DJAKARTA SAM SITE (MISSILE BONUS #2)
A COMPLETED SA-2 SAM SITE IS NEWLY IDENTIFIED 11.5 NM WSW OF
DJAKARTA AT 06-14-50S 106-39-00E.
8. BERDICHEV REGIONAL MILITARY STOR INSTLN 11111111 25X1A
25X1 D VEHICLE/EQUIPMENT DISPOSITION AND COUNT APPEARS ESSENTIALLY
25X9
UNCHANGED SINCE
TE PLIN ARMY BARRACKS VOGELSANG 4023
25X1A
HOWEVER, 1 FACILITY
NOT PR VIOUSLY REPORTED, 1.2 NM SSE, IS, STRONGLY SUSPECT.
STATUS OF COMOR TARGET READOUT
TWENTY-FOUR COMOR TARGET$ WERE LJBSERVED IN THE OAK REPORTING
PERIOD AND ARE CONTAINED IN THIS OAK.,
L ?
TOP SECRET CHESS. RUFF'
25X9
Handle Via
TALENT-KEYHOLE
Control System Only
HondleVic
TALENT-KEYHOLE
Control System. Only
TOP SECRET CHESS RUFF
MISSION 1018-1, 26-29 MAR 65
iMISSILES
TCS-80486/65
TYURATAM MISSILE TET CENTER UR 4538N 06317E
THE CENTER IS COMPLETELY COVERED BY CLOUD-FREE
-PHOTOGRAPHY, BUT HAZE LIMITS INTERPRETATION OF THE WEST
HALF OF THE RANGE HEAD.
LAUNCH COMPLEX A (SITES 1 AND 15) -- A DOME HAS BEEN.
_CONSTRUCTED-ONITHE-TOP OF THE SECOND OF A PAIR OF
TRACKING BUILDINGS LOCATED SOUTH OF PAD Al (SITE 1).
-AWUNIDENTIFIE6 OBJECT OR OBJECTS 175 FT IN LENGTH IS
04 THE RAIL?SERVING PAD Al. NO SIGNIFICANT CHANGE IN
PADS Al AND A2 (SITE 1) OR IN THE SUPPORT FACILITIES
25X1D SINCE- THE SILO IN LAUNCH:AREA A3
(SITE 15) IS BACKFILLED.
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
LAUNCH COMPLEX B (SITES 2, 16, AND 17) -.- BUILDINGS ARE
UNDER CONSTRUCTIWCAT THE 2 SQUARE AND :1- RECTANGULAR
EXCAVATIONS* LOCATED APPROXIMATELY 1,000 FT EAST OF PAD
B1 (SITE 2) WH'GH WERE RE ORTED ON
.AN OBJECT APPROXIMAT LY 90 FT IN LENGTH IS ON THE
RAIL SERVING P 4o B1 (SITE 2). THE SILO AT LAUNCH AREA
82 (SITE 16) IS BACKFILLE AND NOw APPEARS SIMILAR TO
THOSE 'OBSERVED AT TYPE IIIA LAUNCH SITES, BUT NO SILO
DOOR CAN BE IDENTIFIED. 0 SIGNIFICANT-CHANGE IN
LAUNCH AREA B3 (SITE 1?) UR SUPPORT FACILITIES SINCE
LAUNCH COMPLEX C (SITE 3) -- AN OBJECT APPROXIMATELY
105 FT HIGH, P SSIBLY A MISSILE,-IS ERECTED ON PAD Cl.
A POSSIBLE TRA,SPORTER IS ALIGNED WITH THE
ERECTOR/LAUNCHER ON PAD C . THEIR OVERALL LENGTH IS
180 FT.- NO SIGNIFICANT C ANGE IN FACILITIES SINCE
LAUNCH COMPLEX D,(SITES 4 AND.9) ---NO SIGNIFICANT.
CHANGE AT EITHER LAUNCH SITE SINCE
THE 2 ARCHED-ROOF BUILDINGS NEAR-A-HE SUPPORT AREA
APPEAR TO BE COMPLETE. THE-CENTER AND RIGHT SILO DOORS
AT 02 (SITE 9) ARE OPEN.- THE UNIDENTIFIED CONSTRUCTION
IN THE SOUTHERN PART OF THE SECURED AREA AT 02 WHICH
WAS REPORTED O1\ SHOWS NO CHANGE.
THE ACTIVITY CONSISTS OF SMALL SHALLOW EXCAVATIONS AND
DITCHING.
LAUNCH COMPLEX E (SITE 6) -- NO SIGNIFICANT CHANGE IN
FACILITIES SINCE .NO.CHANGE IN
THE RAIL EMBANKMENT SINCE
25X1D
TOP SECRET CHESS RUFF,
25X1A
25X1D
Handle Via
TALENT-KEYHOLE
Control System Only
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
25X9
25X9
25X1D
25X1D
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
MISSION 1018-1, 26=29 MAR 65
TCS-80486/65
LAUNCH COMPLEX F (SITE 5) -- THE LEGS OF THE
PLUS-SHAPED ELECTRONIC FACILITY ARE. CLEARLY DELINEATED
BY. OPEN DITCHING. NO OTHER SIGNIFICANT CHANGE IN
FACILITIES SINCE
LAUNCH COMPLEX G'(SITES'7, 11, 121 18 AND 19) -- AN -
UNIDENTIFIED OBJECT OR OBJECTS, MEASURING APPROXIMATELY
175 FT IN LENGTH, IS ON THE RAIL AT THE SE END OF THE
MISSILE ASSEMBLY/CHECKOUT BUILDING IN THE COMPLEX
SUPPORT FACILITY.
LAUNCH AREA Gl-GZ (SITE 7) ---NO SIGNIFICANT CHANGE
slatE
LAUNCH AREA G3-G4 (SITE 11) ---THE GANTRY FOR G4_IS ON
THE PAD. HAZE AND DARKNESS OF THE IMAGE PRECLUDE
DETERMINATION OF WHETHER A MISSILE IS IN THE GANTRY.
NO SIGNIFICANT CHANGE IN FACILITIES SINCE
LAUNCH AREA G5-G6 (SITE 12) -= THE GANTRY IS ON THE PAD
AT G6. HAZE AND DARKNESS OF THE IMAGE PRECLUDES
DETERMINATION OF WHETHER A MISSILE IS IN THE GANTRY.
NO SIGNIFICANT CHANGE IN FACILITIES SINCE
LAUNCH AREA G7 (SITE 18) --'NO APPARENT CHANGE SINCE
,LAUNCH AREA G8-G9 (SITE 19) -- NO APPARENT CHANGE SINCE
. NO SIGNIFICANT CHANGE SINCE
AT THE COMPLEX SUPPORTFACILITY,
:REVETTED STORAGE AREA,
. NO SIGNIFICANT CHANGE IN THE AREA
OF UNIDENTIFIED CONSTRUCTION SOUTH OF THE
LAUNCH COMPLEX H (SITE 8) -- A POSSIBLE MISSILE DOLLY,
APPROXIMATELY 105 FT LONG,. IS ON THE RAIL, SERVING THE
PAD AT HI. TWO SMALL EARTH-MOUNUED BUILDINGS WITH A
ROAD-SERVED HARDSTAND BETWEEN THEM HAVE BEEN
CONSTRUCTED AT A POINT-APPROXIMATELY 300 FT SSW OF PAD'
Hl. FIRST EVIDENCE OF THIS CONSTRUCTION WAS OBSERVED
LAUNCH COMPLEX I (SITE 14) NO SIGNIFICANT CHANGE
25X1D
TOP SECRET CHESS RUFF
25X1D
25X1D
25X9
? 25X9
25X1D
Handle Via
TALENT-KEYHOLE
Control System Only
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET-CHESS RUFF
MISSION 1018-1, 26-29 MAR 65
TCS-80486/65
COMPLEX J -- THE HIGH BAY OF THE LARGE BUILDING IS
APPROXIMATELY 75 PERCENT ROOFED.. THE RAIL EMBANKMENT
PARALLEL TO THE MAIN ROAD HAS BEEN EXTENDED -
APPROXIMATELY 0.5 NM AND THE PRESENT TERMINUS CURVES TO
THE NNE IN THE GENERAL DIRECTION Of THE LARGE
EXCAVATION. THERE ARE 3 ADDITIONAL SHALLOW RECTANGULAR
EXCAVATIONS IN THE AREA OF THE CONSTRUCTION ACTIVITY
LOCATED APPROXIMATELY 400 FT NW OF THE LARGE
EXCAVATION.: THIRTEEN MAJOR BUILDINGS ARE STILL UNDER
CONSTRUCTION IN THE HOUSING AREA. THE DITCH FROM THE
VICINITY OF THE WATER TREATMENT PLANT IN THE MAIN?
SUPPORT BASE, WHICH WAS REPORTED ON
NOW TERMINATES IN THE SUPPORT .AREA LEX J.
THE ROAD CONNECTING COMPLEXES A AND J IS COMPLETE.
25X1D
LAUNCH COMPLEX K (SITES 13 AND 20-) -- LAUNCH AREA -K2
.(SITE 13), NO SIGNIFICANT_CHANGE SINCE 25X1D
LAUNCH AREA K3 (SITE 20), A NEW DITCH EXTENDS
SOUTH APPROAMATEL 400 FT FROM A POINT APPROXIMATELY
200 FT SW OF THE PROBABLE CONTROL FACILITY. .THE POINT
OF ORIGIN IS INSIDE THE SECURITY .FENCE AND THE SOUTH
END IS OUTSIDE THE SECURITY FENCE. NO OTHER
SIGNIFICANT CHANGE SINCE
POSSIBLE LAUNCH GROUP UNDER CONSTRUCTION (SITES 20-1 .
THROUGH '20-7) -- THE 7 AREAS OF CONSTRUCTION ACTIVITY
IN THE VICINITY OF LAUNCH COMPLEXES F9 G9 AND K SHOW NO
'SIGNIFICANT CHANGE. HAZE PRECLUDES AMPLIFICATION OF
THE DETAILS REPORTED ON
NEW UNIDENTIFIED CONSTRUCTION ACTIVITY IS OBSERVED 1.5
NM SW OF THE PROPELLANT--PRODUCTION PLANT. THIS
-ACTIVITY WAS NOT PRESENT ON BUT
WAS ON MMMMI=M. ' THE ACTIVITY IS PARTIALLY
FENCED AND A ROAD IS UNDER CONSTRUCTION TO CONNECT WITH
THE MAIN ROAD SERVING THE 'RANGE HEAD. AT PRESENT IT
CONSISTS OF A GEOMETRIC CONFIGURATION OF DITCHING AND
EXCAVATIONS. A 1,700-FT DITCH, CONSIDERED TO BE A
BASELINE, IS ORIENTED ON A NW/SE AZIMUTH. A DITCH,
APPROXIMATELY 1,550 FT LONG, EXTENDS FROM EITHER SIDE
OF THE BASE LINE AT A -POINT 750 FT FROM THE NW END.
EACH DITCH IS LAID OUT AT THE SAME ANGLE FROM THE BASE
LINE, ABOUT 65 DEGREES. THERE IS PLUS-CONFIGURED
DITCHING AT THE NW EXTREMITY OF THE BASE LINE. THE
LENGTH OF. ?THESE DITCHES-IS APPROXIMATELY 430 FT. THERE
ARE AT LEAST 3 STRUCTURES UNDER CONSTRUCTION ADJACENT
TO THE BASE LINE. THIS ACTIVITY IS SIMILAR TO NEW
CONSTRUCTION' ACTIVYITY AT;KAPUSTIN, YAR. IIT .APPEARS:
THESE 2 'ACTIVITIES WILL BE IDENTItAL.WkIEN:COMPLETtD
_
9
TOP_ SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
25X9
25X1D
25X1D
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
MISSION 1018-1, 26-29 MAR 65
25X1D
TCS-80486/65
NO SIGNIFICANT CHANGE SINCE AT
THE PROPELLANT PRODUCTION
PLANT, AND THE MAIN SUPPORT BASE.
PHOTO REFERENCES FOR SIGNIFICANT ITEMS FOLLO-W
LAUNCH COMPLEX ? A ---
LAUNCH COMPLEX B --
LAUNCH COMPLEX C --
LAUNCH COMPLEX D --
LAUNCH COMPLEX E --
LAUNCH COMPLEX F 25X1D
LAUNCH COMPLEX G --
LAUNCH COMPLEX H
LAUNCH COMPLEX I
COMPLEX j --
LAUNCH COMPLEX K -
(SEE ATTACHMENT)
DROVYANAYA ICBM COMPLEX . UR 5131N 11300E
ENTIRE COMPLEX COVERED.BY GOO-D-QUALITY STEREO
PHOTOGRAPHY. NO SIGNIFICANT CHANGES OBSERVED AT --
COMPLEX SUPPORT FACILITY AND -TO-ROAD TRANSFER
POINT SINCE 'LAUNCH AREA A (SITE'
r) SINCE B (SITE 2) SINCE
C (SITE 4) SINCE
D (SITE 3) SINCE
(SITE_5) AND F (SITE 6) SINCE
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
NO APPARENT CHANGE AT LAUNCH SITES G1-G8 (SITES 7-14)
OR G11-G15 (SITES 18-20) SINCE
THERE HAS BEEN NO APPARENT. CHANGE AT POSSIBLE SITE G9
SINCE IT WAS FIRST IDENTIFIED ON
SUSPECT AREA G10 HAS SHOWN NO SIGNS OF ACTIVITy SINCE
IT WAS FIRST OBSERVED'ON AND IS
NO LONGER CONSIDERED TO BE A SUSPECT LAUNCH SITE.
'A NEWLY IDENTIFIED PROBABLE LAUNCH SITE IN AN
UNDETERMINED STAGE OF CONSTRUCTION IS LOCATED AT 51-20N
113-04E, ABOUT 12 NM SSE OF THE COMPLEX SUPPORT
FACILITY. IT CONSISTS-OF A DOUBLE-FENCED AREA -
,CONTAINING AN EXCAVATION AND-A POSSIBLE SILO. THIS
AREA IS DESIGNATED PROBABLE LAUNCH SITE GI6. ACTIVITY
WAS FIRST OBSERVED ON AND CAN BE
NEGATED ON WHEN SUFFICIENT
TO
10
SECRET CHESS RUFF
25X1A
25X1D
25X1D
25X1D
25X1D
25X1D
Handle Via
TALENT-KEYHOLE I
Control System Only ;
25X1D
011,
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
MISSION 1018-1, 26-29 MAR 65
TCS-80486/5
EVIDENCE FOR A NEW LAUNCH GROUP HAS DEVELOPED, SEVERAL
OF THOSE SITES PRESENTLY ASSIGNED TO LAUNCH GROUP G
WILL BE REDESIGNATED., SEVERAL OTHER AREAS OF
SUSPICIOUS ACTIVITY ARE PRESENT WITHIN THE COMPLEX.
NO ABM' ACTIVITY OBSERVED IN THE EASTERN TWO-THIRDS OF
50-NM-RADIUS SEARCH AREA. WESTERN THIRD NOT COVERED.
GLADKAYA ICBM COMPLEX
2-X1D
2
X1D
UR 5605N 09211E
A POSSIBLE NEW GROUP OF LAUNCH SITES HAS BEEN
IDENTIFIED APPROXIMATELY 15 NM WNW OF THE CSF. THIS
GROUP, DESIGNATED AS POSSIBLE LAUNCH GROUP G, CONSISTS
OF 3 POSSIBLE LAUNCH SITES.
POSSIBLE LAUNCH SITES GI, G2* AND G36 EACH CONSIST OF A
POSSIBLE EXCAVATION LOCATED WITHIN A SECURED AREA.
RECENT TRACK ACTIVITY EXISTS THROUGHOUT THE 3 AREAS.
ALL 3 POSSIBLE LAUNCH SITES ARE IN EARLY STAGES OF
CONSTRUCTION.
POSSIBLE LAUNCH SITE G1 (56-14N 091-44E); LOCATED 18 NM
WNW OF THE CSF AND FIRST SEEN ON
CAN BE NEGATED ON
POSSIBLE LAUNCH SITE G2 '(56-12N091-43E),
NM WNW OF THE CSF AND FIRST SEEN ON
LOCATED
17.8
25X1A
POSSIBLE LAUNCH SITE G3 (56-12N 091-55E),. LOCATED 12 NM
WNW OF THE CSF AND FIRST SEEN ON
CAN BE NEGATED ON
FIVE AREAS OF UNIDENTIFIED ACTIVITY ARE LOCATED IN THE
VICINITY.
THE COMPLEX SUPPORT FACILITY, RAIL-TO-ROAD TRANSFER
POINT, LAUNCH AREAS A (SITE 3), 13 (SITE 2), AND D (SITE
5) SHOW NO APPARENT CHANGE SINCE
LAUNCH GROUP Fr SITES 179 (SITES 7-13), IS
IDENTIFICATION ONLY. ,
NO ABM ACTIVITY OBSERVED IN CLOUD-.-FREE PORTIONS OF
50-NM-RADIUS SEARCH AREA. -
11
TOP SECRET' CHESS RUFF
25X1D
25X1D
25X1D
25X1D
25X1D
Handle Via
TALENT-KEYHOLE
Control System Only
25 1D
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRETis CHESS RUFF
MISSION 1018-1/ 26-29 MAR 65
PHOTO REFERENCES FOR SIGNIEICANT ITEMS FOLLOW --
POSSIBLE LAUNCH SITE G1 --
POSSIBLE LAUNCH SITE G2 -- 25X1D
POSSTBLE LAUNCH SITE G3 --
COMPLEX SUPPORT FACILITY.-
?
TCS-80486/65
25X1A
UZHUR ICBM COMPLEX
2 X1D
25X D
2 X1D
25 1D
2 X1D
25 1D
2 1D
de
2 X1D
UR 5517N 08949E
COMPLEX COVERED BY VERY HUY-PHOTOGRAPHY. COMPLEX
SUPPORT FACILITY, RAIL-TOVIOAD TRANSFER POINT, AND
LAUNCH AREAS A (SITE 1), B (SITE 2), C (SITE 3), Do
(SITE 4), E (SITE 5), F (SITE 6), G (SITE 7)/ H (sr-TE
8), J (SITE 10)1 AND K (SITE111) ARE IDENTIFIED ONLY.
LAUNCH AREA I (SITE 9) IS CLOUD COVERED.
NO.ABM ACTIVITY OBSERVED WITHIN CLOUD-FREE PORTION OF
50-NM-RADIUS SEARCH AREA.
OLOVYANNAYA ICBM COMPLEX UR 5049N 11550E
THE COMPLEX WAS OVERED BY OBLIQUE PHOTOGRAPHY ON 2
SEPARATE PASSES- COVERED THE COMPLEX SUPPORT
FACILITY, RAIL-TI-ROAD TRANSFER POINT, LAUNCH AREAS As 25X1D
B, CI LAUNCH SIT S 04-07 AND LAUNCH GROUP E.
COVERED LAUNCH SITES 02, D3, AND 07-010.
NO SIGNIFICANT CHANGES OBSERVED AT THE COMPLEX SUPPORT
POINT SINCE 0 SIGNIFICANT'
FACILITY SINCE OR THE TRANSFER
..! :
CHANGE-AT LAUNCH Aliimisiiiiiiiimiiii0 TE 2) (SI.
11111111111
T )
SINCE AT LAUNCH GROUP D SITES D1
(SITE 4), 04 (SITE 8), D5 (SITE 9), 06 (SITE 10), D7
(SITE 6) AND 08 (SITE 12) WERE IDENTIFICATION ONLY. NO
SIGNIFICANT CHANGE OBSERVED AT SITES 02 (SITE 5), 03
(SITE 7), 09 (SITE 13)i AND 010 (SITE 11) SINCE MISSION
THESE SITES REMAIN IN A MID-STAGE OF
CONSTRUCTION BUT OBLIQUITY PRECLUDES A MORE DETAILED
INTERPRETATION.
AT LAUNCH GROUP E, SITES El (SITE 17), E3 (SITE
(SITE 16) AND E5 (SITE 19) WERE IDENTIFICATION
NO SIGNIFICANT CHANGE 09ERVED AT LAUNCH SITES
?
01.2
TOP SECRET. CHESS RUFF
15), E4
NLY.
2 (SITE
25X1D
Handle Via
TALENT-KEYHOLE
Control System Only
25X1D
25X1D
Handle Via
TALENT-KEYHOLE'
Control System! Only
TOP SECRET CHESS RUFF
MISSION 1018-1, 26-29 MAR 65
TCS-80486/65
14), E6 (SITE 18), E7 (SITE 20),- EB (SITE 21), E9 (SITE
22) DR "E10 (SITE 23) SINCE BUT
OBLIQUITY PRECLUDES A MORE DETAILED INTERPRETATION.
'NO ABM ACTIVITY OBSERVED WITHIN 50-NM-RADIUS SEARCH
AREA.
TAT ISHCHEVO ICBM COMPLEX UR 5140N 04534E
COMPLEX IS PARTIALLY COVERED BY VERY SMALL-SCALE,
OBLIQUE-PHOTOGRAPHY. THE COMPLEX SUPPORT FACILITY,
RAIL-TO-ROAD TRANSFER POINT, AND LAUNCH.GROUPS A (SITES
1-3, 5-11) AND B (SITES 12-17, 19-21, 30) ARE
IDENTIFICATION ONLY. ALL 'SITES, INCLUDING SUSPECT
AREAS WHICH ARE WEST OF SITES B7 (SITE 13) AND.B9 (SITE
21):ARE.NOT COVERED.
NO ABM ACTIVITY IDENTIFIED IN EASTERN HALF OF 50-NM
SEARCH AREA.
PHOTO REFERENCES FOR SIGNIFICANT ITEMS FOLLOW --
25X1D
MARINA GORKA MRBM LAUNCH SITE 25X1D UR 5326N 02745E
NO APPARENT CHANGE SINCE
NO EVIDENCE OF SITE DISMANTLING OR DESTRUCTION
OBSERVED.
25X1D
SKRUNDA IRBM LAUNCH SITE UR 5635N 02149E
COMPLETE TYPE IV IRBM LAUNCH SITE. THE WARHEAD
FACILITY ? APPEARS COMPLETE, AND CONSISTS OF 1 LARGE
DRIVE-IN BUILDING, 1 LARGE SQUARE BUILDING, AND A LARGE
13
TOP SECRET CHESS RUFF
25X1A
Handle Via
TALENT-KEYHOLE
Control System Only
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
MISSION 1018-1, 26-29 MAR 65
RECTANGULAR BUILDING. THERE IS 1 POSSIBLE LA
VEHICLE ON THE ROAD IN FRONT OF THE LARGE SQU
BUILDING. A MOUNDED BUNKER IS ALSO PRESENT I
FACILITY. TWO LARGE BUILDINGS AND 4 SMALL BU
HAVE BEEN CONSTRUCTED ADJACENT TO THE FRONT E
'LAUNCH SITE. A LARGE POSSIBLE VEHICLE IS PAR
PERPENDICULAR TO THE RIGHTFORWARD SILO AND A
LARGE POSSIBLE VEHICLE IS ON THE ROAD BETWEEN
FORWARD AND LEFT REAR SILOS.
25)(1D
TCS-80486/65
GE,
RE'
THE
ILDINGS
D OF THE
ED,
OTHER
THE LEFT
GRANOV IRBM LAUNCH SITE 2 5X UR 48
NO APPARENT CHANGE SINCE
25X1D
25X9
25X1D
9N 02929E
POOR-QUALITY, NON-STEREO PHOTOGRAPHY PRECLUDES
DETERMINATION 0F CONSTRUCTION PROGRESS ON RIM FACILITY.
NO NEW CONSTRUCTION OBSERVED.
GURLEVO MRBM LAUNCH SITE
NO APPARENT CHANGE SINCE
25X9
25X1D litt 5925N 02852E
RUDNYA ZLOTINSKAYA MRBM LAUNCH SITE UR 5104N 02807E:
25X1D
25X1D
25X1D
NO APPARENT CHANGE SINCE
LIELELEVA MRBM LAUNCH SITE
IDENTIFICATIONONLy.
14
UR 5624N 02336E
TOP SECRET CHESS RUFF
(
25X1A
Handle Via
TALENT-KEYHOLE
Control System Only
Handle Via
TALENT-KEYHOLE
Control System Only
? TOP SECRET.CHESS RUFF
MISSION 1018-1 :26729 MAR 65:
VAINODE IRBM LAUNCH SITE
25X9
25X1D
25X1D
25X9
NO APPARENT CHANGE SINCE
ZHURAVKA IRBM LAUNCH SITE
TCS-80486/65
25X1A
25X1D- ' UR 5624N 02150E
25X1D
UR. 5436N 07640E
NO APPARENT CHANGE SINCE
POOR 'QUALITY, OBLIQUITY, SNOW AND HAZE PRECLUDE
POSITIVE DETERMINATION OF THE STATUS OF STRUCTURES IN
THE LAUNCH SITE.
KALNIK IRBM LAUNCH SITE
25X1D
NO APPARENT CHANGE SINCE
25X1D UR 4859N 02922E
CONSTRUCTION-CONTINUES ON
PROBABLE STEAM LINE. AN UNIDENTIFIED BUILDING IS NOW
OBSERVED UNDER CONSTRUCTION IN THE SW CORNER OF THE
SUPPORT AREA.
KAPUSTIN VAR/VLADIMIROVKA.MSL TEST CTR UR 4835N 04545E
25X1D
THE ENTIRE KAPUSTIN YAR/VLADIRIROVKA MISSILE TEST
CENTER WAS COVERED BY CLEAR, FAIR, TO GOOD-QUALITY
PHOTOGRAPHY.
NEW UNIDENTIFIED CONSTRUCTION ACTIVITY OBSERVED
APPROXIMATELY 0.5 NM NORTH OF THE FORMER ROCKET LAUNCH
COMPLEX AT 48-39N 045-46E. THIS ACTIVITY WAS NOT
PRESENT ON IT IS
ROAD-SERVED FROM A RAIL TRANSLOADING FACILITY WHICH
FORMERLY SERVED THE ROCKET LAUNCH COMPLEX. SIMILAR
CONSTRUCTION ACTIVITY IS ALSO OBSERVED AT THE TYURATAM
MISSILE TEST CENTER AND APPARENTLY BOTH ACTIVITIES WILL
BE IDENTICAL WHEN COMPLETE.
THIS ACTIVITY CONSISTS OFA GEOMETRIC CONFIGURATION OF
15
TOP SECRET CHESS RUFF,
Handle Via
TALENT-KEYHOLE
Control System Only
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS. RUFF
MISSION 1018-1, 26-9 MAR 65
TCS-110486/65
EXCAVATIONS, DITCHES AND SCARS. THE LONGEST LINE,,
CONSIDERED- TO BE A BASE CINE, HAS A E/SW,ORIENTATION.
A DITCH/SCAR APPROXIMATELY 1,550 FT ONG EXTENDS FROM
EITHER SIDE OF THE BASE LINE FROM A OINT APPROXIMATELY?
750 FT FROM THE NE.END. ,E CH-DITCH/ CAR IS LAID OUT AT
THE SAME ANGLE kOM THE BA 5E LINE, APPROXIMATELY 65
? DEGREES.. AT. THE NE END OF THE BASE LINE THERE IS A
SQUARE PATTERN MEASURING APPROXIMATELY 300 FT ON A SIDE
WITH CIRCULAR EXCAVATIONS AT EACH CORNER AND IN THE
CENTER. CORNER-TO-CORNER DISTANCE IS APPROXIMATELY 430
FT. THERE ARE AT LEAST 4 STRUCTURES UNDER CONSTRUCTION
ADJACENT TO THE BASE LIN1E.
SAM FACILITIES -- THE DOUBLE SECURITY FENCE AND THE
BUILDING PREVIOUSLY REPORTED UNDER CONSTRUCTION'IN THE
SECURED AREA SW OF THE PROBABLE LAUNCH AREA NOW APPEAR
25X1D COMPLETE. NO APPARENT CHANGE SINCE
OBSERVED- IN THE REMAINDER OF THE 'SAM FACILITIES.
? VEHICLES/EQUIPMENT ARE IN THE SAM RED, SA-1
(HERRINGBONE), SA-2, AND SA-3 LAUNCH AREAS, THE'HOUSING
AND SUPPORT AREA AND THE SAM MARSHALLING AREA.
25X1D ELECTRONICS SITE NO APPARENT CHANGE SINCE MISSION
TEST AND SUPPORT COMPLEX NO APPARENT CHANGE SINCE.
25X1D AT' LEAST T.PROBABLE TANK CARS
ARE IN THE PROPELLANT HANDLING AND STORAGE AREA, AND 4
CRATES/CANISTERS ARE IN THE RAIL-SERVED SECURED SUPPORT'
AREA BETWEEN THE PROPELLANT HANDLING AND STORAGE AREA
AND THE TEST STAND.
25X1D
25X1D
25X1D
KAPUSTIN 'VAR AIRFIELD -- NO APPARENT CHANGE SINCE
AIRCRAFT INCLUDE 12 CAB, 3
CRATE; 9 LIGHT STRAIGHT-WING AND 8 POSSIBLE LIGHT'
HELICOPTERS.
SSM FACILITIES.
LAUNCH COMPLEX H -- AN UNIDENTIFIED OBJECT IS OBSERVED
AT THE END OF THE SOUTHERN PAD.
LAUNCH COMPLEX E (SITE 3) -- NO APPARENT CHANGE SINCE
LAUNCH COMPLEX A -- NO APPARENT CHANGE SINCE MISSION
LAUNCH COMPLEX B --'NO APPARENT CHANGE SINCE MISSION
16
TOP SECRET CHESS RUFF
r,
25X1D
Handle Via
TALENT-KEYHOLE
Control Sy.stem Only
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
MISSION 1018-1, 26-29 MAR 65 ,
TCS-80486/65
. TROOP TRAINING AREA -- NO APPARENT CHANGE SINCE MISSION
VEHICLES/EQUIPMENT OBSERVED IN 4 MOTOR POOLS...
COMPLEX C HOUSING, ADMINISTRATION AND SERVICE AREAS --
NO APPARENT CHANGE SINCE
VEHICLES/EQUIPMENT NOTED IN THE MOTOR POOLS.'
.SSM BIVOUAC AREA -- NUMEROUS VEHICLES/PIECES OF
EQUIPMENT PARKEDON THE HARDSTANDS IN THE MOTOR POOL.
LAUNCH COMPLEX D (SIT q 1) AND D FINAL ASSEMBLY AND
CHECKOUT AREA -- NO APPARENT CHANGE SINCE
ki)
LAUNCH COMPLEX G NO APPARENT CHANGE SINCE MISSION
PROBABLE MISSILE ASSEMBLY AND CHECKOUT AREA
APPARENT CHANGE SINCE
UNIDENTIFIED INSTALLATION NORTH OF COMPLEX C-- NO
APPARENT CHANGE SINCE
LAUNCH COMPLEX C.(SITES 29 4-9).
LAUNCKAREA.1C,(SITE 7) -.- THE 2 RAIL-SERVED LAUNCH
PADS 1C-2 AND 1C-3 ARE NOW ALSO ROAD-SERVED. A
RAIL-SERVED -PROBABLE ERECTOR/LAUNCHER CAN NOW BE SEEN
ON EACH PAD. EQUIPMENT/VEHICLES ARE ALSO PRESENT ON
THE OLDER LAUNCH PAD 1C-1. *
LAUNCH. AREA 2C (SITE 6) ---.AN-SS4/SS5 MISSILE EXERCISE
IS UNDERWAY ON THE SOUTHERN PAD. ' A MISSILE TRANSPORTER
AND AN ERECTOR ARE .PPSITIONED ON THE PAD, AS ARE
SEVERAL PROBABLE SUPPORT VEHICLES.
LAUNCH AREA 3C (SITE 5) PROBABLE MISSILE EXERCISE
IS TAKING PLACE WITH SEVERAL VEHICLES/PIECES OF
EQUIPMENT -PRESENT ON THE LAUNCH PAD AND ADDITIONAL
EQUIPMENT PRESENT ON THE SOUTHWESTERN DUMBELL PAD.
LAUNCH AREA 4C (SITE 4) -- MODIFICATION/CONSTRUCTION IS
STILL CONTINUING AT LAUNCH SITE 4C7-1. THE SW SILO IS
OPEN, THE EXCAVATION TO THE SW HAS NOT BEEN BACKFILLED
AND A TALL STRUCTURE IS AGAIN POSITIONED OVER THE NE
SILO. THE FORMER 4C .SUPPORT AREA IS NOW COMPLETELY '
RAZED. NO APPARENT CHANGE SINCE IN LAUNCH
SITE 4C-2. VEHICLE/EQUIPMENT IS PRESENT AT SE SILO.
17
TOP SECRET CHESS RUFF
25X1D
Handle Via
TALENT-KEYHOLE
Control System Only
?
25X1D
- 25X1A
25X1D
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
MISSION 1018-1,.26-29 MAR 65
TCS-80486/65
LAUNCH AREA 5C (SITE 2)--- THESOUTHERN PAD AT LAUNCH -
SITE-5C-1 IS EITHER BEING DISMANTLED OR UNDERGOING
EXTENSIVE MODIFICATION AS EVIDENCED BY SCARRING
ACTIVITY. VEHICLES/EQUIPMENT ARE PRESENT AT THE
NORTHERN PAD AND IN THE 2 HARDSTANDS.
MISSILE STORAGE AND HANDLING AREA -- NO APPARENT CHANGE
SINCE
FOR AIRCRAFT COUNT AT AKHTUBINSK FLIGHT TEST CENTER,
SEE COMOR TARGET NO OAK PART II.
PHOTO REFERENCES FOR SIGNIFICANT ITEMS FOLLOW --
NEW U/I CONST
SECURED AREA SE OF SAM PROB LAUNCH AREA -
SARY-SIIAGAN .ANTIMISSILE TEST CENTER OR .4602N 07334E
25X1A ALL FACILITIES AT THE TEST CENTER EXCEPT SITE 13 AND
THE POSSIBLE FIELD LAUNCH POINT ARE COVERED ON 2 PASSES
BY STEREO PHOTOGRAPHY LIMITED BY HAZE AND IMAGE
QUALITY. CERTAIN AREAS WITHIN LAUNCH COMPLEXES A (SITE
25X1D SHOW EVIDENCE OF ACTIVITY SINCE
AT LAUNCH COMPLEX A, SITES 1
AND 2 ?AND ELECTRONIC SITE A DO NOT APPEAR TO HAVE
25X1D CHANGED APPRECIABLY SINCE EXCEPT
FOR THE MOVEMENTOF CERTAIN VEHICLES.
T-IE
THE
SL IG
SITE
LAUNCH POSITIONS AND THE SINGLE HARDSTAND ALONG
UTER SERVICE ROAD AT SItE 1 REMAIN OCCUPIED. A
T SHIFTING OF VEHICLES HAS OCCURRED ISfl AT LAUNCH
3 AND 4 AND ELECTRONIC SITE B SINCE
AT POSITIONS 5 AND 69 LAUNCH SITE 3, THE
OBJECTS/EQUIPMENT REMAIN DEPLOYED AT THE EAST END OF
THE POSITION AS OBSERVED ON
18
TOP SECRET, CF;kESS RUFF
25X1D
25X1D
25X1A
25X1D
25X1D
Handle Via
TALENT-KEYHOLE
Control Systern Only
Handle Via
- TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
MISSION 1018-19 26-29 MAR 65
TCS-80486/65
ONE PROBABLE PIECE OF EQUIPMENT ISI-POSITIONED AT THE
WEST END OF POSITION 5, AND 1 AND PROBABLY 2 PIECES OF
EQUIPMENT AT THE WEST END OF POSITION 6.
25X1D THE 105-F1-LONG OBJECT/VEHICLE OBSERVED ON_MISSION
JUST NORTH OF THE REVETMENT ON THE ROAD
PARALLELING THE ACCESS ROAD-TO ELECTRONIC SITE B HAS-
.
25X1D DISAPPEARED. NO SIGNIFICANT CHANGE IS APPARENT SINCE
AT LAUNCH SITES 5 AND 6,
ELECTRONIC SITES C AND 09 THE MISSILE STORAGE AND
CHECKOUT AREA, AND THE HEADQUARTERS AND ADMINISTRATION
AREA.
25X1D
25X1D
25X1D25X1D
25X1D
AT LAUNCH COMPLEX 6, FACILIT A AND THE SUPPORT AREA
REMAIN ESSENTIALLY UNCHANGED SINCE
AT FACILITY B9 2 PROBABLE'VEHICLgS ARE PARKED
ADJACENT TO PAD B-2.AND- AN OBJECT/VEHICLE IS OBSERVED
ON. A SLIGHTLY WIDENED SECTION (50 FT WIDE)' OF THE 2
LOOP ROADS. THE ENVIRONMENTAL SHELTERS-REMAIN ON"THE
ROOFS OF THE 2 SMALL TRIAD BUILDINGS. THE
'APPROXIMATELY DIAMETER, TOWER-MOUNTED, DISH
ANTENNA,. WHICH, ON WAS REMOVED
FROM-THE ROOF OF THE LARGE TRIAD -BUILDING REMAINS ON
THE GROUND ADJACENT TO THE NW'CORNER.. SINCE THE SAME
COVERAGE THE RINGLIKE STRUCTURES ON THE. GROUND ADJACENT
TO THE BUILDING HAVE BEEN PLACED ON THE-ROOF OF THE
BUILDING ENCLOSING THE. TOWER, THUS FORMING A .CYLINDER
APPROXIMATELY 110 FT IN DIAMETER. AND 55 FT ABOVE THE
BUILDING. ADJACENT TO THESE -CORNER OF THE BUILDING IS
A RINGED LIGHT-TONED CAP APPROXIMATELY 90 FT WIDE.
THIS CAP-WILL PRESUMABLY BE MOUNTED ON THE CYLINDER-
AFTER THE DISH ANTENNA HAS BEEN REMOUNTED ON THE TOWER.
A CRANE IS POSITIONED ?BESIDE THE CAP.. -
!
NO CHANGE IS APPARENT SINCE IN -?
THE BUILDING TRIAD AREAS AT INSTRUMENTATION-SITES 2 AND
10. ELECTRONIC EQUIPMENT HAS NOT BEEN. IDENTIFIED TO
DATE ON THE TRIAD BUILDINGS AT THESE 2 SITES. A SECOND
BUILDING TRIAD HAS NOT APPEARED AT ANY OF THE 4'TRIAD
SITES AT THE TEST CENTER AS IS THE CASE AT 2.0F THE
- 25X1D_ TRIAD SITES AT MOSCOW. THE ,1DOME
REMAINS IN POSITION ON THE 135 X'125-FT BUI0iNG AT
INSTRUMENTATION SITE 2. THE STATUS OF .THE 1-16-FT DOMES
WHICH WERE REMOVED AT INSTRUMENTATION SITES 3 AND 10 IS
UNCHANGED. AT INSTRUMENTATION SITE 6 THE. 11A-FT DOME
REMAINS STANDING. -
THE ANTENNA FACE.... OF THE HEN HOUSE-IN THE SUPPORT BASE
REMAINS Dr IN TONE. NO FACILITIES HAVE BEEN
19'
TOP-SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
MISSION 1018-1, 26-29 MAR 65
TCS-80486/65
CONSTRUCTED AT THE PRESENT TERMINAL POINT OF THE NEW
ROAD EXTENDING GENERALLY SW. FROMINSTRUMENTATION SITE
2. THE SAM TRAINING CENTER REMAINS INACTIVE. NO
SIGNIFICANT CHANGE IS APPARENT AT THE MAIN HOUSING
AREA, THE PRIMARY AIRFIELD, THE LONG-DIRT STRIP, THE
NEW AIRSTRIP, THE HEN ROOST ANTENNAS, AND
INSTRUMENTATION SITES 1 AND 11 SINCE
25X1D OR AT INSTRUMENTATION SITES 4, 5, 7, B, 9, AND 12
25X1D SINCE IDENTIFICATION ONLY IS
POSSIBLE ON POSSIBLE INSTRUMENTATION-SITES 14 AND 15
AND THE UNIDENTIFIED FACILITY BETWEEN THE 2 SITES.
PHOTO REFERENCESFOR-SIGNIFICANT ITEMS ON
FOLLOW :?
LAUNCH COMPLEX A --
LAUNCH COMPLEX B --
INSTRUMENTATION SIT
INSTRUMENTATION SIT
INSTRUMENTATION SIT
INSTRUMENTATION SIT
HEN HOUSE ANTENNA -
25X1D
25X1D
25X1D
25X1D
PAO-TOU SAM SITE CH 4045N 11004E BONUS 1
9.5 NM NNE OF PAO-TOU. AT 42-45-20N 110-04-30E.
COMPLETED SA-2 SAM SITE.IS NEWLY IDENTIFIED.
25X1D
SITE CONSISTS OF 4 FENCED LAUNCH POSITIONS; 3 OF WHICH
ARE OCCUPIED. THE CENTRAL GUIDANCE AREA IS ALSO
OCCUPIED. APPROXIMATELY 46 PROBABLE TENTS ARE LOCATED
IN THE IMMEDIATE VICINITY OF ThE SITE.
?
(SEE ATTACHMENT)
DJAKARTA SAM SITE "ID 0614S 10639E BONUS 2
11.5 NM WSW OF DJAKARTA AT-0614-750S 106-39-00E.
NEWLY IDENTIFIED COMPLETED SA-2 SAM SITE WITH IRREGULAR
CONFIGURATION. OCCUPANCY UNDETERMINED.
20
TOP SECRET CHESS RUFF
Handle Via
- TALENT-KEYHOLE
Control System Only
25X1D
25X1D
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
MISSION 1018-1, 26-29 MAR 65
TCS-80486/65
PAD-IOU PROBABLE SAM SITE CH 4114N 10941E
41 NM NNW OF PAO-TOU AT.41-14-10N 109-41-00E.
IPROBABLE SA-2 SAM SITE UNDER CONSTRUCTION CONTAINS 3
AND A POSSIBLE 4TH LAUNCH POSITION. .THE LAUNCH
POSITIONS ARE PROBABLY FENCED AND-VUNOCCUPIED. A
PROBABLE GUIDANCE AREA IS UNDER CONSTRUCTION.
1
21
TOP SECRET CHESS RUFF
BONUS 3 ?
Handle Via
TALENT-KEYHOLE
Control System Only
?
?
Nuclear
Energy
25X2
Approved For Release 2000/09/08 : CIA-RDP78T05439A000500030025-0
Next 1 Page(s) In Document Exempt
Approved For Release 2000/09/08 : CIA-RDP78T05439A000500030025-0
?
4:4
Complexes
25X1D
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
MISSION 1018-1, 26-29 MAR 65
COMPLEXES
TCS-80486/65
DJAKARTA COMPLEX ID .0610S 10650E
COMPLEX, APPROXIMATELY 30 SQ MILES IN AREA, CONTAINS
RAIL YARDS AND SHOPS, LIGHT INDUSTRY, MILITARY.
INSTALLATIONS, COMMERCIAL, ADMINISTRATIVE, AND
RESIDENTIAL AREAS, 2 AIRFIELDS AND PORT -FACILITIES.
THE COMPLEX HAS NEVER BEEN COVERED COMPLETELY OR -
ADEQUATELY ON KEYHOLE PHOTOGRAPHY, THEREFORE-NEW MAJOR
CONSTRUCTION og IMPORTANT CHANGES CANNOT BE DETERMINED.
AIRCRAFT (KEMAJORAN AIRFIELD) 3 PROBABLE BADGER, 16
POSSIBLE SWEPT?WING FIGHTERS, 5 POSSIBLE C-47/CAB, 2
POSSIBLE CRATE, 1 POSSIBLE CAT/CUB, 1 POSSIBLE VISCOUNT
AND 3 LIGHT STRAIGHT?WING.
AIRCRAFT (HALIM PERDANAKUSUMA AIRFIELD) -- 7 POSSIBLE
CRATE, 9 POSSIBLE C-47/CAB, 7 MEDIUM STRAIGHT?WING AND
3 LIGHT STRAIGHT?WING.
VESSELS (TANDJUNGPRIOK NAVAL BASE AND 'PORT) -- 6
POSSIBLE PCs APPROXIMATELY 66 OCEAN?GOING MERCHANT
SHIPS AND NUMEROUS SMALLER-SURFACE.VESSELSo
FOR NEWLY IDENTIFIED SA-2 SAM SITE, SEE MISSILE BONUS
2. -
24_
TOP SECRET CHESS RUFF
25X1A
Handle Via
TALENT-KEYHOLE
Control System Only
25X1B
Approved For Release 2000/09/08 : CIA-RDP78T05439A000500030025-0
Next 1 Page(s) In Document Exempt
Approved For Release 2000/09/08 : CIA-RDP78T05439A000500030025-0
?
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
MISSION 1018-1, 26-29 MARCH 1965
TCS-80486/65
ATTACHMENT 3-
RAIL-SERVED PROBABLE
ERECTORS LAUNCHERS
N.PIC j-6931 (4/65)
LAUNCH AREA 1C, KAPUSTIN YAR/VLADIMIROVKA MISSILE TEST CENTER, USSR
TOP SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Control .System Only
S
S
5-
Handle Via
TALENT-KEYHOL
Control System On
TOP SECRET CHESS RUFF
MISSION 1018-1, 26-29 MARCH 1965
TCS-80486/65
ATTACHMENT 4
NPIC J-6932 l4/65)
LAUNCH AREA 2C, KA PUST1N YA R /VLADIMIROV KA MISSILE TEST CENTER, USSR
- TOP SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
S
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
MISSION .1018-1, 26-29 MARCH 1965
TC5-80486/65
- ATTACHMENT 5
????_?
NPIC J-6933 (4/65)
LAUNCH AREA 3C, .KAPOSTIN YAR/VLADIMIROVKA MISSILE TEST CENTER, USSR
TOP SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
S
?
a
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET CHESS RUFF
MISSION 1018-1, 26-.29 MARCH 1965
TCS-80486/65
ATTACHMENT 6
FORMER 4C _
SUPPORT AREA.
EXCAVATION
VEHICLE EQUIPMENT
NPIC J-5934 (4/65)
LAUNCH AREA 4C, KA PUSTIN YAR/VLADIMIROVKA MISSILE TEST CENTER, USSR
TOP SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
Handle Via
TALENT-KEYHOLE
Control System Only
TOP 'SECRET CHESS RUFF
MISSION 1018-1, 26-29 MARCH 1965
TCS-80486/65
ATTACHMENT 7
NPIC J-6935 (4/65)
LAUNCH AREA 5C, KAPLISTIN YAR VLA6IIMIROVKA MISSILE TEST CENTER, USSR
TOP SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
Hondfe-Vio
TALENT-KEYHOLE
'Control System Only
TOP SECRET