OAK-PART III MISSION 1018-1 26-29 MARCH 1965

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000500030025-0
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
36
Document Creation Date: 
December 9, 2016
Document Release Date: 
August 22, 2000
Sequence Number: 
25
Case Number: 
Publication Date: 
April 1, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000500030025-0.pdf1.49 MB
Body: 
7 -4fr-t!i'!", o'rr, fr4;4";,.."."" 4Provr?f:frdf:ir -,F, =di; -- 7:1,-,-; "'AV: ' r?III; P P'41: / Copy i' 32 Pogits ! ; P J,d 1111111111111 PHOTOGRAPHIC INTERPRETATION REPORT. OAK-PART III MISSION 1018-1 26-29 MARCH 1965 Declass Review by NIMAIDOD CIA DIA TC5-80486/65 April 1965 /702Y Handle Via TALENT - KEYHOLE Control Only WARNING This document contains classified information affecting the notional security of the United States within the meaning of the ?spionage lows U. S. Code Title 18, Sections 793 and 794. The law prohibits its transmission or the revelation of its contents' in any manner to an unauthorized person, as well as its use in any manner prejudicial to the safety or interest of the United States Or for the benefit of any foreign govelnment to the. detriment of the United States. It is to be seen onlyi by personnel ?specially indoctrinated and authorized to receive TALENT-KEYHOLE information. Its security must b? maintained in accordance with KEYHOLE and TALENT regulations. NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER ior Handle Via- TALENT-KEYHOLE Control SysterriOnly TOP SECRET CHESS RUFF MISSION 1018-1, 26-29 MAR 65 TABLE OF CONTENTS - PREFACE TRACK OF MISSION 'HIGHLIGHTS MISSILES! NUCLEAR-ENERGY COMPLEXES ATTACHMENTS 1 TOP SECRET CHESS' RUFF TCS-80486/65 2 7 22 24 APPENDIX - Handle Via . TALENT-KEYHOLE Control System Only. _ Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF MISSION 1018-1, 26.29 MARCH 1965 TCS-80486/65 CDAK - PAR-r ? BicDN 101 8-1 ? PREFACE THIS IS THE THIRD OF SEVERAL OAK REPORTS ON _MISSION 1018-1 AND PROVIDES INFORMATION ON THOSE -COMMITTEE ON OVERHEAD . RECONNAISSANCE (COMOR) TARGETS OBSERVED ON THE PHOTOGRAPHY. aelk TARGETS ARE ARRANGED----IN THE OAK BY SUBJECTAND WITHIN EACH SUBJECT BY COMOR TARGET NUMBER. :TARGETS OF OPPORTUNITY OBSERVED DURING THE-OAK REPORTING PERIOD'ARE LISTED NUMERICALLY UNDER THE APPROPRIATE SUBJECT AFTER THE LISTING OF COMOR TARGETS. LOCATIONS OF TARGETS IN THIS REPORT ARE INDICATED BY THE COUNTRY CODE PRECEDING THE COORDINATES. SELECTED PHOTOGRAPHIC REFERENCES FOR EACH TARGET OBSERVED AND REPORTED FOLLOW THE DESCRIPTION OF THE TARGET. PASS NUMBERS ARE SUFFIXED WITH EITHER AN A FOR ASCENDING (SOUTH?TO?NORTH) OR D FOR DESCENDING (NORTH?TO?SOUTH). FRAMES ARE.INDICATED BY .THE LETTERS FR. THE LETTER F PRECEDING FRAME.NUMBERS INDICATE-S THE FORWARD CAMERA, AND THE LETTER A INDICATES THE AFT CAMERA. UNIVERSAL REFERENCE GRID (X?Y) COORDINATES ARE GIVEN IN PARENTHESIS AFTER THE FRAME TO WHICH THEY APPLY. THIS GRID IS IDENTIFIED AS UNIVERSAL GRID NO 1, FEB 64. SYMBOLS INDICATING CONDITIONS WHICH AFFECT THE APPEARANCE OF THE TARGET ON THE PHOTOGRAPHY ARE AS FOLLOWS C (CLEAR)/ H (HAZE)/ CS (CLOUD SHADOW)/ HC (HEAVY CLOUD COVER)/ SC (SCATTERED CLOUD COVER), SD (SEMIDARKNESS), 0 (OBLIQUITY)/ S (SNOW), PQ (POOR IMAGE QUALITY). OAK RECIPIENTS ARE CAUTIONED THAT THE INITIAL SCAN-OF THE PHOTOGRAPHY IS BEING ACCOMPLISHED IN A SHORT TIME AND PRIOR TO FINAL REFINEMENT OF EPHEMERAL DATA. CONSEQUENTLY/ FUTURE DETAILED ANALYSIS MAY RESULT IN MINOR ALTERATIONS. 2 TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control System Only 25X1D Approved For Release 2000/09/08 : CIA-RDP78T05439A000500030025-0 Next 1 Page(s) In Document Exempt Approved For Release 2000/09/08 : CIA-RDP78T05439A000500030025-0 25X1D Handle Via TALENT-KEYHOLE Control System Only . TOP SECRET CHESS RUFF MISSION 1018-1, 26-29 MAR 65 HIGHLIGHTS. 1. TYpRATAM MISSILE TEST CENTER 1111111i 25X1A TCS-80486/65 THE CENTER IS COMPLETELY COVERED BY CLOUD?FREE PHOTOGRAPHY,. BUT HAZE LIMITS INTERPRETATION OF THE WEST HALF OF THE RANGE HEAD. AN OBJECT APPROXIMATELY 105 FT HIGH, POSSIBLY A MISSILE, IS ERECTED ON PAD Cl. A POSSIBLE TRANSPORTER IS ALIGNED WITH THE ERECTOR/LAUNCHER ON PAD C3. THEIR OVERALL LENGTH IS 180 FT. THE GANTRIES FOR G4 AND G6 ARE ON THEIR PADS. .HAZE AND DARKNESS OF THE IMAGE PRECLUDE DETERMINATION' OF WHETHER A MISSILE IS IN EITHER GANTRY. A POSSIBLE MISSILE DOLLY APPROXIMATELY 105 FT' LONG IS ON THE RAIL SERVING THE PAD AT 111.. AT COMPLEX J, THE HIGH BAY OF THE LARGE BUILDING IS APPROXIMATELY 75 PERCENT ROOFED. THERE ARE 3 ADDITIONAL SHALLOW RECTANGULAR EXCAVATIONS IN THE AREA OFTHE CONSTRUCTION ACTIVITY LOCATED APPROXIMATELY 400..FT NW OF THE ALARGE EXCAVATION. NEW UNIDENTIFIED CONSTRUCTION ACTIVITY IS OBSERVED 1.5 NM SW OF THE PROPELLANT PRODUCTION PLANT. THIS ACTIVITY IS SIMILAR TO NEW CONSTRUCTION ACTIVITY AT KAPUSTIN YAR ANDAT APPEARS THESE 2 ACTIVITIES WILL BE IDENTICAL WHEN COMPLETED. ' 2. DROVYANAYA ICBM COMPLEX 25X1A A NEWLY IDENTIFIED PROBABLE LAUNCH SITE IN AN UNDETERMINED STAGE OF CONSTRUCTION IS LOCATED AT 51720N 1i3-04E AND IS _DESIGNATED PROBABLE LAUNCH SITE G16. AREA G10 HAS SHOWN NO SIGNS OF ACTIVITY SINCE IT WAS FIRST OBSERVED ON AND IS NO LONGER' CONSIDERED TO BE A SUSPECT LAUNCH SITE.. 3. GLADKAYA ICBM COMPLEX' 25X1A A POSSIBLE NEW GROUP OF LAUNCH SITES HAS BEEN IDENTIFIED APPROXIMATELY 15 NM WNW?OF THE CSF. THIS GROUP, DESIGNATED AS POSSIBLE LAUNCH GROUP Gs CONSISTS OF 3 POSSIBLE LAUNCH-SITES.- 4. KAPUSTIN YAR/VLADIMIROVKA MSL TEST CTR 25X1A THE ENTIRE CENTER WAS COVERED BY-CLEAR FAIR? TO GOOD7Q4ALITY ,PHOTOGRAPHY.- 'AIRCRAFT. PRESENT AT XAPUSTIN _YAR.AIRFIELD INCLUDE 12 CAB, 3 CRATE, 9 LIGHT STRAIGHT?WING AND 8 POSSIBLE LIGHT HELICOPTERS. A RAIL?SERVED PROBABLE ERECTOR/LAUNCHER IS SEEN ON LAUNCH PADS 1C-2 AND IC-3. AN SS4fSS5 MISSILE EXERCISE IS OBSERVED ON THE SOUTHERN .PAD F LAUNCH AREA 2C AND ANOTHER PROBABLE MISSILE EXERCISE IS BSERVED IN 5 TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Coqtrol System Only Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF \MISSION 1018-1, 26-29 MAR 65 TCS-80486/65 LAUNCH AREA 3C. NEW UNIDENTIFIED CONSTRUCTION ACTIVITY SIMILAR TO THAT OBSERVED 1.5 NM SW OF THE-PROPELLANT PRODUCTION PLANT, TYURATAM MISSILE TEST CENTER, IS NOTED APPROXIMATELY 0.5 NM NORTH OF THE FORMER ROCKET LAUNCH COMPLEX. ? ? 5. SARY-SHAGAN ANTIMISSILE TEST CENTER .25X1A ALL FACILITIES AT THE -TEST CENTER EXCEPT SITE 13 AND THE POSSIBLE FIELD LAUNCH POINT ARE COVERED ON 2 PASSES BY STEREO PHOTOGRAPHY LIMITED BY HAZE AND IMAGE QUALITY. 6.. PAO-TOU SAM SITES (MISSILE BONUS #1 AND #3) ONE COMPLETED SA-2 SAM: SITE AND 1 PROBABLE SA-2 SAM SITE ' UNDER-CONSTRUCTION ARE NEWLY IDENTIFIED. THE-COMPLETED SITE IS LOCATED 9.5 NM NNE OF PAO-TOU AT 40-45-20N 110-04-30E AND THE PROBABLE SITE IS LOCATED 41 NM NNW OF PAO-TOU AT 41-14-10N 109-41-00E., 7. DJAKARTA SAM SITE (MISSILE BONUS #2) A COMPLETED SA-2 SAM SITE IS NEWLY IDENTIFIED 11.5 NM WSW OF DJAKARTA AT 06-14-50S 106-39-00E. 8. BERDICHEV REGIONAL MILITARY STOR INSTLN 11111111 25X1A 25X1 D VEHICLE/EQUIPMENT DISPOSITION AND COUNT APPEARS ESSENTIALLY 25X9 UNCHANGED SINCE TE PLIN ARMY BARRACKS VOGELSANG 4023 25X1A HOWEVER, 1 FACILITY NOT PR VIOUSLY REPORTED, 1.2 NM SSE, IS, STRONGLY SUSPECT. STATUS OF COMOR TARGET READOUT TWENTY-FOUR COMOR TARGET$ WERE LJBSERVED IN THE OAK REPORTING PERIOD AND ARE CONTAINED IN THIS OAK., L ? TOP SECRET CHESS. RUFF' 25X9 Handle Via TALENT-KEYHOLE Control System Only HondleVic TALENT-KEYHOLE Control System. Only TOP SECRET CHESS RUFF MISSION 1018-1, 26-29 MAR 65 iMISSILES TCS-80486/65 TYURATAM MISSILE TET CENTER UR 4538N 06317E THE CENTER IS COMPLETELY COVERED BY CLOUD-FREE -PHOTOGRAPHY, BUT HAZE LIMITS INTERPRETATION OF THE WEST HALF OF THE RANGE HEAD. LAUNCH COMPLEX A (SITES 1 AND 15) -- A DOME HAS BEEN. _CONSTRUCTED-ONITHE-TOP OF THE SECOND OF A PAIR OF TRACKING BUILDINGS LOCATED SOUTH OF PAD Al (SITE 1). -AWUNIDENTIFIE6 OBJECT OR OBJECTS 175 FT IN LENGTH IS 04 THE RAIL?SERVING PAD Al. NO SIGNIFICANT CHANGE IN PADS Al AND A2 (SITE 1) OR IN THE SUPPORT FACILITIES 25X1D SINCE- THE SILO IN LAUNCH:AREA A3 (SITE 15) IS BACKFILLED. 25X1D 25X1D 25X1D 25X1D 25X1D 25X1D 25X1D LAUNCH COMPLEX B (SITES 2, 16, AND 17) -.- BUILDINGS ARE UNDER CONSTRUCTIWCAT THE 2 SQUARE AND :1- RECTANGULAR EXCAVATIONS* LOCATED APPROXIMATELY 1,000 FT EAST OF PAD B1 (SITE 2) WH'GH WERE RE ORTED ON .AN OBJECT APPROXIMAT LY 90 FT IN LENGTH IS ON THE RAIL SERVING P 4o B1 (SITE 2). THE SILO AT LAUNCH AREA 82 (SITE 16) IS BACKFILLE AND NOw APPEARS SIMILAR TO THOSE 'OBSERVED AT TYPE IIIA LAUNCH SITES, BUT NO SILO DOOR CAN BE IDENTIFIED. 0 SIGNIFICANT-CHANGE IN LAUNCH AREA B3 (SITE 1?) UR SUPPORT FACILITIES SINCE LAUNCH COMPLEX C (SITE 3) -- AN OBJECT APPROXIMATELY 105 FT HIGH, P SSIBLY A MISSILE,-IS ERECTED ON PAD Cl. A POSSIBLE TRA,SPORTER IS ALIGNED WITH THE ERECTOR/LAUNCHER ON PAD C . THEIR OVERALL LENGTH IS 180 FT.- NO SIGNIFICANT C ANGE IN FACILITIES SINCE LAUNCH COMPLEX D,(SITES 4 AND.9) ---NO SIGNIFICANT. CHANGE AT EITHER LAUNCH SITE SINCE THE 2 ARCHED-ROOF BUILDINGS NEAR-A-HE SUPPORT AREA APPEAR TO BE COMPLETE. THE-CENTER AND RIGHT SILO DOORS AT 02 (SITE 9) ARE OPEN.- THE UNIDENTIFIED CONSTRUCTION IN THE SOUTHERN PART OF THE SECURED AREA AT 02 WHICH WAS REPORTED O1\ SHOWS NO CHANGE. THE ACTIVITY CONSISTS OF SMALL SHALLOW EXCAVATIONS AND DITCHING. LAUNCH COMPLEX E (SITE 6) -- NO SIGNIFICANT CHANGE IN FACILITIES SINCE .NO.CHANGE IN THE RAIL EMBANKMENT SINCE 25X1D TOP SECRET CHESS RUFF, 25X1A 25X1D Handle Via TALENT-KEYHOLE Control System Only 25X1D 25X1D 25X1D 25X1D 25X1D 25X1D 25X9 25X9 25X1D 25X1D Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF MISSION 1018-1, 26=29 MAR 65 TCS-80486/65 LAUNCH COMPLEX F (SITE 5) -- THE LEGS OF THE PLUS-SHAPED ELECTRONIC FACILITY ARE. CLEARLY DELINEATED BY. OPEN DITCHING. NO OTHER SIGNIFICANT CHANGE IN FACILITIES SINCE LAUNCH COMPLEX G'(SITES'7, 11, 121 18 AND 19) -- AN - UNIDENTIFIED OBJECT OR OBJECTS, MEASURING APPROXIMATELY 175 FT IN LENGTH, IS ON THE RAIL AT THE SE END OF THE MISSILE ASSEMBLY/CHECKOUT BUILDING IN THE COMPLEX SUPPORT FACILITY. LAUNCH AREA Gl-GZ (SITE 7) ---NO SIGNIFICANT CHANGE slatE LAUNCH AREA G3-G4 (SITE 11) ---THE GANTRY FOR G4_IS ON THE PAD. HAZE AND DARKNESS OF THE IMAGE PRECLUDE DETERMINATION OF WHETHER A MISSILE IS IN THE GANTRY. NO SIGNIFICANT CHANGE IN FACILITIES SINCE LAUNCH AREA G5-G6 (SITE 12) -= THE GANTRY IS ON THE PAD AT G6. HAZE AND DARKNESS OF THE IMAGE PRECLUDES DETERMINATION OF WHETHER A MISSILE IS IN THE GANTRY. NO SIGNIFICANT CHANGE IN FACILITIES SINCE LAUNCH AREA G7 (SITE 18) --'NO APPARENT CHANGE SINCE ,LAUNCH AREA G8-G9 (SITE 19) -- NO APPARENT CHANGE SINCE . NO SIGNIFICANT CHANGE SINCE AT THE COMPLEX SUPPORTFACILITY, :REVETTED STORAGE AREA, . NO SIGNIFICANT CHANGE IN THE AREA OF UNIDENTIFIED CONSTRUCTION SOUTH OF THE LAUNCH COMPLEX H (SITE 8) -- A POSSIBLE MISSILE DOLLY, APPROXIMATELY 105 FT LONG,. IS ON THE RAIL, SERVING THE PAD AT HI. TWO SMALL EARTH-MOUNUED BUILDINGS WITH A ROAD-SERVED HARDSTAND BETWEEN THEM HAVE BEEN CONSTRUCTED AT A POINT-APPROXIMATELY 300 FT SSW OF PAD' Hl. FIRST EVIDENCE OF THIS CONSTRUCTION WAS OBSERVED LAUNCH COMPLEX I (SITE 14) NO SIGNIFICANT CHANGE 25X1D TOP SECRET CHESS RUFF 25X1D 25X1D 25X9 ? 25X9 25X1D Handle Via TALENT-KEYHOLE Control System Only 25X1D 25X1D 25X1D 25X1D 25X1D 25X1D Handle Via TALENT-KEYHOLE Control System Only TOP SECRET-CHESS RUFF MISSION 1018-1, 26-29 MAR 65 TCS-80486/65 COMPLEX J -- THE HIGH BAY OF THE LARGE BUILDING IS APPROXIMATELY 75 PERCENT ROOFED.. THE RAIL EMBANKMENT PARALLEL TO THE MAIN ROAD HAS BEEN EXTENDED - APPROXIMATELY 0.5 NM AND THE PRESENT TERMINUS CURVES TO THE NNE IN THE GENERAL DIRECTION Of THE LARGE EXCAVATION. THERE ARE 3 ADDITIONAL SHALLOW RECTANGULAR EXCAVATIONS IN THE AREA OF THE CONSTRUCTION ACTIVITY LOCATED APPROXIMATELY 400 FT NW OF THE LARGE EXCAVATION.: THIRTEEN MAJOR BUILDINGS ARE STILL UNDER CONSTRUCTION IN THE HOUSING AREA. THE DITCH FROM THE VICINITY OF THE WATER TREATMENT PLANT IN THE MAIN? SUPPORT BASE, WHICH WAS REPORTED ON NOW TERMINATES IN THE SUPPORT .AREA LEX J. THE ROAD CONNECTING COMPLEXES A AND J IS COMPLETE. 25X1D LAUNCH COMPLEX K (SITES 13 AND 20-) -- LAUNCH AREA -K2 .(SITE 13), NO SIGNIFICANT_CHANGE SINCE 25X1D LAUNCH AREA K3 (SITE 20), A NEW DITCH EXTENDS SOUTH APPROAMATEL 400 FT FROM A POINT APPROXIMATELY 200 FT SW OF THE PROBABLE CONTROL FACILITY. .THE POINT OF ORIGIN IS INSIDE THE SECURITY .FENCE AND THE SOUTH END IS OUTSIDE THE SECURITY FENCE. NO OTHER SIGNIFICANT CHANGE SINCE POSSIBLE LAUNCH GROUP UNDER CONSTRUCTION (SITES 20-1 . THROUGH '20-7) -- THE 7 AREAS OF CONSTRUCTION ACTIVITY IN THE VICINITY OF LAUNCH COMPLEXES F9 G9 AND K SHOW NO 'SIGNIFICANT CHANGE. HAZE PRECLUDES AMPLIFICATION OF THE DETAILS REPORTED ON NEW UNIDENTIFIED CONSTRUCTION ACTIVITY IS OBSERVED 1.5 NM SW OF THE PROPELLANT--PRODUCTION PLANT. THIS -ACTIVITY WAS NOT PRESENT ON BUT WAS ON MMMMI=M. ' THE ACTIVITY IS PARTIALLY FENCED AND A ROAD IS UNDER CONSTRUCTION TO CONNECT WITH THE MAIN ROAD SERVING THE 'RANGE HEAD. AT PRESENT IT CONSISTS OF A GEOMETRIC CONFIGURATION OF DITCHING AND EXCAVATIONS. A 1,700-FT DITCH, CONSIDERED TO BE A BASELINE, IS ORIENTED ON A NW/SE AZIMUTH. A DITCH, APPROXIMATELY 1,550 FT LONG, EXTENDS FROM EITHER SIDE OF THE BASE LINE AT A -POINT 750 FT FROM THE NW END. EACH DITCH IS LAID OUT AT THE SAME ANGLE FROM THE BASE LINE, ABOUT 65 DEGREES. THERE IS PLUS-CONFIGURED DITCHING AT THE NW EXTREMITY OF THE BASE LINE. THE LENGTH OF. ?THESE DITCHES-IS APPROXIMATELY 430 FT. THERE ARE AT LEAST 3 STRUCTURES UNDER CONSTRUCTION ADJACENT TO THE BASE LINE. THIS ACTIVITY IS SIMILAR TO NEW CONSTRUCTION' ACTIVYITY AT;KAPUSTIN, YAR. IIT .APPEARS: THESE 2 'ACTIVITIES WILL BE IDENTItAL.WkIEN:COMPLETtD _ 9 TOP_ SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control System Only 25X9 25X1D 25X1D Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF MISSION 1018-1, 26-29 MAR 65 25X1D TCS-80486/65 NO SIGNIFICANT CHANGE SINCE AT THE PROPELLANT PRODUCTION PLANT, AND THE MAIN SUPPORT BASE. PHOTO REFERENCES FOR SIGNIFICANT ITEMS FOLLO-W LAUNCH COMPLEX ? A --- LAUNCH COMPLEX B -- LAUNCH COMPLEX C -- LAUNCH COMPLEX D -- LAUNCH COMPLEX E -- LAUNCH COMPLEX F 25X1D LAUNCH COMPLEX G -- LAUNCH COMPLEX H LAUNCH COMPLEX I COMPLEX j -- LAUNCH COMPLEX K - (SEE ATTACHMENT) DROVYANAYA ICBM COMPLEX . UR 5131N 11300E ENTIRE COMPLEX COVERED.BY GOO-D-QUALITY STEREO PHOTOGRAPHY. NO SIGNIFICANT CHANGES OBSERVED AT -- COMPLEX SUPPORT FACILITY AND -TO-ROAD TRANSFER POINT SINCE 'LAUNCH AREA A (SITE' r) SINCE B (SITE 2) SINCE C (SITE 4) SINCE D (SITE 3) SINCE (SITE_5) AND F (SITE 6) SINCE 25X1D 25X1D 25X1D 25X1D 25X1D 25X1D 25X1D NO APPARENT CHANGE AT LAUNCH SITES G1-G8 (SITES 7-14) OR G11-G15 (SITES 18-20) SINCE THERE HAS BEEN NO APPARENT. CHANGE AT POSSIBLE SITE G9 SINCE IT WAS FIRST IDENTIFIED ON SUSPECT AREA G10 HAS SHOWN NO SIGNS OF ACTIVITy SINCE IT WAS FIRST OBSERVED'ON AND IS NO LONGER CONSIDERED TO BE A SUSPECT LAUNCH SITE. 'A NEWLY IDENTIFIED PROBABLE LAUNCH SITE IN AN UNDETERMINED STAGE OF CONSTRUCTION IS LOCATED AT 51-20N 113-04E, ABOUT 12 NM SSE OF THE COMPLEX SUPPORT FACILITY. IT CONSISTS-OF A DOUBLE-FENCED AREA - ,CONTAINING AN EXCAVATION AND-A POSSIBLE SILO. THIS AREA IS DESIGNATED PROBABLE LAUNCH SITE GI6. ACTIVITY WAS FIRST OBSERVED ON AND CAN BE NEGATED ON WHEN SUFFICIENT TO 10 SECRET CHESS RUFF 25X1A 25X1D 25X1D 25X1D 25X1D 25X1D Handle Via TALENT-KEYHOLE I Control System Only ; 25X1D 011, Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF MISSION 1018-1, 26-29 MAR 65 TCS-80486/5 EVIDENCE FOR A NEW LAUNCH GROUP HAS DEVELOPED, SEVERAL OF THOSE SITES PRESENTLY ASSIGNED TO LAUNCH GROUP G WILL BE REDESIGNATED., SEVERAL OTHER AREAS OF SUSPICIOUS ACTIVITY ARE PRESENT WITHIN THE COMPLEX. NO ABM' ACTIVITY OBSERVED IN THE EASTERN TWO-THIRDS OF 50-NM-RADIUS SEARCH AREA. WESTERN THIRD NOT COVERED. GLADKAYA ICBM COMPLEX 2-X1D 2 X1D UR 5605N 09211E A POSSIBLE NEW GROUP OF LAUNCH SITES HAS BEEN IDENTIFIED APPROXIMATELY 15 NM WNW OF THE CSF. THIS GROUP, DESIGNATED AS POSSIBLE LAUNCH GROUP G, CONSISTS OF 3 POSSIBLE LAUNCH SITES. POSSIBLE LAUNCH SITES GI, G2* AND G36 EACH CONSIST OF A POSSIBLE EXCAVATION LOCATED WITHIN A SECURED AREA. RECENT TRACK ACTIVITY EXISTS THROUGHOUT THE 3 AREAS. ALL 3 POSSIBLE LAUNCH SITES ARE IN EARLY STAGES OF CONSTRUCTION. POSSIBLE LAUNCH SITE G1 (56-14N 091-44E); LOCATED 18 NM WNW OF THE CSF AND FIRST SEEN ON CAN BE NEGATED ON POSSIBLE LAUNCH SITE G2 '(56-12N091-43E), NM WNW OF THE CSF AND FIRST SEEN ON LOCATED 17.8 25X1A POSSIBLE LAUNCH SITE G3 (56-12N 091-55E),. LOCATED 12 NM WNW OF THE CSF AND FIRST SEEN ON CAN BE NEGATED ON FIVE AREAS OF UNIDENTIFIED ACTIVITY ARE LOCATED IN THE VICINITY. THE COMPLEX SUPPORT FACILITY, RAIL-TO-ROAD TRANSFER POINT, LAUNCH AREAS A (SITE 3), 13 (SITE 2), AND D (SITE 5) SHOW NO APPARENT CHANGE SINCE LAUNCH GROUP Fr SITES 179 (SITES 7-13), IS IDENTIFICATION ONLY. , NO ABM ACTIVITY OBSERVED IN CLOUD-.-FREE PORTIONS OF 50-NM-RADIUS SEARCH AREA. - 11 TOP SECRET' CHESS RUFF 25X1D 25X1D 25X1D 25X1D 25X1D Handle Via TALENT-KEYHOLE Control System Only 25 1D Handle Via TALENT-KEYHOLE Control System Only TOP SECRETis CHESS RUFF MISSION 1018-1/ 26-29 MAR 65 PHOTO REFERENCES FOR SIGNIEICANT ITEMS FOLLOW -- POSSIBLE LAUNCH SITE G1 -- POSSIBLE LAUNCH SITE G2 -- 25X1D POSSTBLE LAUNCH SITE G3 -- COMPLEX SUPPORT FACILITY.- ? TCS-80486/65 25X1A UZHUR ICBM COMPLEX 2 X1D 25X D 2 X1D 25 1D 2 X1D 25 1D 2 1D de 2 X1D UR 5517N 08949E COMPLEX COVERED BY VERY HUY-PHOTOGRAPHY. COMPLEX SUPPORT FACILITY, RAIL-TOVIOAD TRANSFER POINT, AND LAUNCH AREAS A (SITE 1), B (SITE 2), C (SITE 3), Do (SITE 4), E (SITE 5), F (SITE 6), G (SITE 7)/ H (sr-TE 8), J (SITE 10)1 AND K (SITE111) ARE IDENTIFIED ONLY. LAUNCH AREA I (SITE 9) IS CLOUD COVERED. NO.ABM ACTIVITY OBSERVED WITHIN CLOUD-FREE PORTION OF 50-NM-RADIUS SEARCH AREA. OLOVYANNAYA ICBM COMPLEX UR 5049N 11550E THE COMPLEX WAS OVERED BY OBLIQUE PHOTOGRAPHY ON 2 SEPARATE PASSES- COVERED THE COMPLEX SUPPORT FACILITY, RAIL-TI-ROAD TRANSFER POINT, LAUNCH AREAS As 25X1D B, CI LAUNCH SIT S 04-07 AND LAUNCH GROUP E. COVERED LAUNCH SITES 02, D3, AND 07-010. NO SIGNIFICANT CHANGES OBSERVED AT THE COMPLEX SUPPORT POINT SINCE 0 SIGNIFICANT' FACILITY SINCE OR THE TRANSFER ..! : CHANGE-AT LAUNCH Aliimisiiiiiiiimiiii0 TE 2) (SI. 11111111111 T ) SINCE AT LAUNCH GROUP D SITES D1 (SITE 4), 04 (SITE 8), D5 (SITE 9), 06 (SITE 10), D7 (SITE 6) AND 08 (SITE 12) WERE IDENTIFICATION ONLY. NO SIGNIFICANT CHANGE OBSERVED AT SITES 02 (SITE 5), 03 (SITE 7), 09 (SITE 13)i AND 010 (SITE 11) SINCE MISSION THESE SITES REMAIN IN A MID-STAGE OF CONSTRUCTION BUT OBLIQUITY PRECLUDES A MORE DETAILED INTERPRETATION. AT LAUNCH GROUP E, SITES El (SITE 17), E3 (SITE (SITE 16) AND E5 (SITE 19) WERE IDENTIFICATION NO SIGNIFICANT CHANGE 09ERVED AT LAUNCH SITES ? 01.2 TOP SECRET. CHESS RUFF 15), E4 NLY. 2 (SITE 25X1D Handle Via TALENT-KEYHOLE Control System Only 25X1D 25X1D Handle Via TALENT-KEYHOLE' Control System! Only TOP SECRET CHESS RUFF MISSION 1018-1, 26-29 MAR 65 TCS-80486/65 14), E6 (SITE 18), E7 (SITE 20),- EB (SITE 21), E9 (SITE 22) DR "E10 (SITE 23) SINCE BUT OBLIQUITY PRECLUDES A MORE DETAILED INTERPRETATION. 'NO ABM ACTIVITY OBSERVED WITHIN 50-NM-RADIUS SEARCH AREA. TAT ISHCHEVO ICBM COMPLEX UR 5140N 04534E COMPLEX IS PARTIALLY COVERED BY VERY SMALL-SCALE, OBLIQUE-PHOTOGRAPHY. THE COMPLEX SUPPORT FACILITY, RAIL-TO-ROAD TRANSFER POINT, AND LAUNCH.GROUPS A (SITES 1-3, 5-11) AND B (SITES 12-17, 19-21, 30) ARE IDENTIFICATION ONLY. ALL 'SITES, INCLUDING SUSPECT AREAS WHICH ARE WEST OF SITES B7 (SITE 13) AND.B9 (SITE 21):ARE.NOT COVERED. NO ABM ACTIVITY IDENTIFIED IN EASTERN HALF OF 50-NM SEARCH AREA. PHOTO REFERENCES FOR SIGNIFICANT ITEMS FOLLOW -- 25X1D MARINA GORKA MRBM LAUNCH SITE 25X1D UR 5326N 02745E NO APPARENT CHANGE SINCE NO EVIDENCE OF SITE DISMANTLING OR DESTRUCTION OBSERVED. 25X1D SKRUNDA IRBM LAUNCH SITE UR 5635N 02149E COMPLETE TYPE IV IRBM LAUNCH SITE. THE WARHEAD FACILITY ? APPEARS COMPLETE, AND CONSISTS OF 1 LARGE DRIVE-IN BUILDING, 1 LARGE SQUARE BUILDING, AND A LARGE 13 TOP SECRET CHESS RUFF 25X1A Handle Via TALENT-KEYHOLE Control System Only Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF MISSION 1018-1, 26-29 MAR 65 RECTANGULAR BUILDING. THERE IS 1 POSSIBLE LA VEHICLE ON THE ROAD IN FRONT OF THE LARGE SQU BUILDING. A MOUNDED BUNKER IS ALSO PRESENT I FACILITY. TWO LARGE BUILDINGS AND 4 SMALL BU HAVE BEEN CONSTRUCTED ADJACENT TO THE FRONT E 'LAUNCH SITE. A LARGE POSSIBLE VEHICLE IS PAR PERPENDICULAR TO THE RIGHTFORWARD SILO AND A LARGE POSSIBLE VEHICLE IS ON THE ROAD BETWEEN FORWARD AND LEFT REAR SILOS. 25)(1D TCS-80486/65 GE, RE' THE ILDINGS D OF THE ED, OTHER THE LEFT GRANOV IRBM LAUNCH SITE 2 5X UR 48 NO APPARENT CHANGE SINCE 25X1D 25X9 25X1D 9N 02929E POOR-QUALITY, NON-STEREO PHOTOGRAPHY PRECLUDES DETERMINATION 0F CONSTRUCTION PROGRESS ON RIM FACILITY. NO NEW CONSTRUCTION OBSERVED. GURLEVO MRBM LAUNCH SITE NO APPARENT CHANGE SINCE 25X9 25X1D litt 5925N 02852E RUDNYA ZLOTINSKAYA MRBM LAUNCH SITE UR 5104N 02807E: 25X1D 25X1D 25X1D NO APPARENT CHANGE SINCE LIELELEVA MRBM LAUNCH SITE IDENTIFICATIONONLy. 14 UR 5624N 02336E TOP SECRET CHESS RUFF ( 25X1A Handle Via TALENT-KEYHOLE Control System Only Handle Via TALENT-KEYHOLE Control System Only ? TOP SECRET.CHESS RUFF MISSION 1018-1 :26729 MAR 65: VAINODE IRBM LAUNCH SITE 25X9 25X1D 25X1D 25X9 NO APPARENT CHANGE SINCE ZHURAVKA IRBM LAUNCH SITE TCS-80486/65 25X1A 25X1D- ' UR 5624N 02150E 25X1D UR. 5436N 07640E NO APPARENT CHANGE SINCE POOR 'QUALITY, OBLIQUITY, SNOW AND HAZE PRECLUDE POSITIVE DETERMINATION OF THE STATUS OF STRUCTURES IN THE LAUNCH SITE. KALNIK IRBM LAUNCH SITE 25X1D NO APPARENT CHANGE SINCE 25X1D UR 4859N 02922E CONSTRUCTION-CONTINUES ON PROBABLE STEAM LINE. AN UNIDENTIFIED BUILDING IS NOW OBSERVED UNDER CONSTRUCTION IN THE SW CORNER OF THE SUPPORT AREA. KAPUSTIN VAR/VLADIMIROVKA.MSL TEST CTR UR 4835N 04545E 25X1D THE ENTIRE KAPUSTIN YAR/VLADIRIROVKA MISSILE TEST CENTER WAS COVERED BY CLEAR, FAIR, TO GOOD-QUALITY PHOTOGRAPHY. NEW UNIDENTIFIED CONSTRUCTION ACTIVITY OBSERVED APPROXIMATELY 0.5 NM NORTH OF THE FORMER ROCKET LAUNCH COMPLEX AT 48-39N 045-46E. THIS ACTIVITY WAS NOT PRESENT ON IT IS ROAD-SERVED FROM A RAIL TRANSLOADING FACILITY WHICH FORMERLY SERVED THE ROCKET LAUNCH COMPLEX. SIMILAR CONSTRUCTION ACTIVITY IS ALSO OBSERVED AT THE TYURATAM MISSILE TEST CENTER AND APPARENTLY BOTH ACTIVITIES WILL BE IDENTICAL WHEN COMPLETE. THIS ACTIVITY CONSISTS OFA GEOMETRIC CONFIGURATION OF 15 TOP SECRET CHESS RUFF, Handle Via TALENT-KEYHOLE Control System Only Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS. RUFF MISSION 1018-1, 26-9 MAR 65 TCS-110486/65 EXCAVATIONS, DITCHES AND SCARS. THE LONGEST LINE,, CONSIDERED- TO BE A BASE CINE, HAS A E/SW,ORIENTATION. A DITCH/SCAR APPROXIMATELY 1,550 FT ONG EXTENDS FROM EITHER SIDE OF THE BASE LINE FROM A OINT APPROXIMATELY? 750 FT FROM THE NE.END. ,E CH-DITCH/ CAR IS LAID OUT AT THE SAME ANGLE kOM THE BA 5E LINE, APPROXIMATELY 65 ? DEGREES.. AT. THE NE END OF THE BASE LINE THERE IS A SQUARE PATTERN MEASURING APPROXIMATELY 300 FT ON A SIDE WITH CIRCULAR EXCAVATIONS AT EACH CORNER AND IN THE CENTER. CORNER-TO-CORNER DISTANCE IS APPROXIMATELY 430 FT. THERE ARE AT LEAST 4 STRUCTURES UNDER CONSTRUCTION ADJACENT TO THE BASE LIN1E. SAM FACILITIES -- THE DOUBLE SECURITY FENCE AND THE BUILDING PREVIOUSLY REPORTED UNDER CONSTRUCTION'IN THE SECURED AREA SW OF THE PROBABLE LAUNCH AREA NOW APPEAR 25X1D COMPLETE. NO APPARENT CHANGE SINCE OBSERVED- IN THE REMAINDER OF THE 'SAM FACILITIES. ? VEHICLES/EQUIPMENT ARE IN THE SAM RED, SA-1 (HERRINGBONE), SA-2, AND SA-3 LAUNCH AREAS, THE'HOUSING AND SUPPORT AREA AND THE SAM MARSHALLING AREA. 25X1D ELECTRONICS SITE NO APPARENT CHANGE SINCE MISSION TEST AND SUPPORT COMPLEX NO APPARENT CHANGE SINCE. 25X1D AT' LEAST T.PROBABLE TANK CARS ARE IN THE PROPELLANT HANDLING AND STORAGE AREA, AND 4 CRATES/CANISTERS ARE IN THE RAIL-SERVED SECURED SUPPORT' AREA BETWEEN THE PROPELLANT HANDLING AND STORAGE AREA AND THE TEST STAND. 25X1D 25X1D 25X1D KAPUSTIN 'VAR AIRFIELD -- NO APPARENT CHANGE SINCE AIRCRAFT INCLUDE 12 CAB, 3 CRATE; 9 LIGHT STRAIGHT-WING AND 8 POSSIBLE LIGHT' HELICOPTERS. SSM FACILITIES. LAUNCH COMPLEX H -- AN UNIDENTIFIED OBJECT IS OBSERVED AT THE END OF THE SOUTHERN PAD. LAUNCH COMPLEX E (SITE 3) -- NO APPARENT CHANGE SINCE LAUNCH COMPLEX A -- NO APPARENT CHANGE SINCE MISSION LAUNCH COMPLEX B --'NO APPARENT CHANGE SINCE MISSION 16 TOP SECRET CHESS RUFF r, 25X1D Handle Via TALENT-KEYHOLE Control Sy.stem Only 25X1D 25X1D 25X1D 25X1D 25X1D 25X1D 25X1D Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF MISSION 1018-1, 26-29 MAR 65 , TCS-80486/65 . TROOP TRAINING AREA -- NO APPARENT CHANGE SINCE MISSION VEHICLES/EQUIPMENT OBSERVED IN 4 MOTOR POOLS... COMPLEX C HOUSING, ADMINISTRATION AND SERVICE AREAS -- NO APPARENT CHANGE SINCE VEHICLES/EQUIPMENT NOTED IN THE MOTOR POOLS.' .SSM BIVOUAC AREA -- NUMEROUS VEHICLES/PIECES OF EQUIPMENT PARKEDON THE HARDSTANDS IN THE MOTOR POOL. LAUNCH COMPLEX D (SIT q 1) AND D FINAL ASSEMBLY AND CHECKOUT AREA -- NO APPARENT CHANGE SINCE ki) LAUNCH COMPLEX G NO APPARENT CHANGE SINCE MISSION PROBABLE MISSILE ASSEMBLY AND CHECKOUT AREA APPARENT CHANGE SINCE UNIDENTIFIED INSTALLATION NORTH OF COMPLEX C-- NO APPARENT CHANGE SINCE LAUNCH COMPLEX C.(SITES 29 4-9). LAUNCKAREA.1C,(SITE 7) -.- THE 2 RAIL-SERVED LAUNCH PADS 1C-2 AND 1C-3 ARE NOW ALSO ROAD-SERVED. A RAIL-SERVED -PROBABLE ERECTOR/LAUNCHER CAN NOW BE SEEN ON EACH PAD. EQUIPMENT/VEHICLES ARE ALSO PRESENT ON THE OLDER LAUNCH PAD 1C-1. * LAUNCH. AREA 2C (SITE 6) ---.AN-SS4/SS5 MISSILE EXERCISE IS UNDERWAY ON THE SOUTHERN PAD. ' A MISSILE TRANSPORTER AND AN ERECTOR ARE .PPSITIONED ON THE PAD, AS ARE SEVERAL PROBABLE SUPPORT VEHICLES. LAUNCH AREA 3C (SITE 5) PROBABLE MISSILE EXERCISE IS TAKING PLACE WITH SEVERAL VEHICLES/PIECES OF EQUIPMENT -PRESENT ON THE LAUNCH PAD AND ADDITIONAL EQUIPMENT PRESENT ON THE SOUTHWESTERN DUMBELL PAD. LAUNCH AREA 4C (SITE 4) -- MODIFICATION/CONSTRUCTION IS STILL CONTINUING AT LAUNCH SITE 4C7-1. THE SW SILO IS OPEN, THE EXCAVATION TO THE SW HAS NOT BEEN BACKFILLED AND A TALL STRUCTURE IS AGAIN POSITIONED OVER THE NE SILO. THE FORMER 4C .SUPPORT AREA IS NOW COMPLETELY ' RAZED. NO APPARENT CHANGE SINCE IN LAUNCH SITE 4C-2. VEHICLE/EQUIPMENT IS PRESENT AT SE SILO. 17 TOP SECRET CHESS RUFF 25X1D Handle Via TALENT-KEYHOLE Control System Only ? 25X1D - 25X1A 25X1D Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF MISSION 1018-1,.26-29 MAR 65 TCS-80486/65 LAUNCH AREA 5C (SITE 2)--- THESOUTHERN PAD AT LAUNCH - SITE-5C-1 IS EITHER BEING DISMANTLED OR UNDERGOING EXTENSIVE MODIFICATION AS EVIDENCED BY SCARRING ACTIVITY. VEHICLES/EQUIPMENT ARE PRESENT AT THE NORTHERN PAD AND IN THE 2 HARDSTANDS. MISSILE STORAGE AND HANDLING AREA -- NO APPARENT CHANGE SINCE FOR AIRCRAFT COUNT AT AKHTUBINSK FLIGHT TEST CENTER, SEE COMOR TARGET NO OAK PART II. PHOTO REFERENCES FOR SIGNIFICANT ITEMS FOLLOW -- NEW U/I CONST SECURED AREA SE OF SAM PROB LAUNCH AREA - SARY-SIIAGAN .ANTIMISSILE TEST CENTER OR .4602N 07334E 25X1A ALL FACILITIES AT THE TEST CENTER EXCEPT SITE 13 AND THE POSSIBLE FIELD LAUNCH POINT ARE COVERED ON 2 PASSES BY STEREO PHOTOGRAPHY LIMITED BY HAZE AND IMAGE QUALITY. CERTAIN AREAS WITHIN LAUNCH COMPLEXES A (SITE 25X1D SHOW EVIDENCE OF ACTIVITY SINCE AT LAUNCH COMPLEX A, SITES 1 AND 2 ?AND ELECTRONIC SITE A DO NOT APPEAR TO HAVE 25X1D CHANGED APPRECIABLY SINCE EXCEPT FOR THE MOVEMENTOF CERTAIN VEHICLES. T-IE THE SL IG SITE LAUNCH POSITIONS AND THE SINGLE HARDSTAND ALONG UTER SERVICE ROAD AT SItE 1 REMAIN OCCUPIED. A T SHIFTING OF VEHICLES HAS OCCURRED ISfl AT LAUNCH 3 AND 4 AND ELECTRONIC SITE B SINCE AT POSITIONS 5 AND 69 LAUNCH SITE 3, THE OBJECTS/EQUIPMENT REMAIN DEPLOYED AT THE EAST END OF THE POSITION AS OBSERVED ON 18 TOP SECRET, CF;kESS RUFF 25X1D 25X1D 25X1A 25X1D 25X1D Handle Via TALENT-KEYHOLE Control Systern Only Handle Via - TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF MISSION 1018-19 26-29 MAR 65 TCS-80486/65 ONE PROBABLE PIECE OF EQUIPMENT ISI-POSITIONED AT THE WEST END OF POSITION 5, AND 1 AND PROBABLY 2 PIECES OF EQUIPMENT AT THE WEST END OF POSITION 6. 25X1D THE 105-F1-LONG OBJECT/VEHICLE OBSERVED ON_MISSION JUST NORTH OF THE REVETMENT ON THE ROAD PARALLELING THE ACCESS ROAD-TO ELECTRONIC SITE B HAS- . 25X1D DISAPPEARED. NO SIGNIFICANT CHANGE IS APPARENT SINCE AT LAUNCH SITES 5 AND 6, ELECTRONIC SITES C AND 09 THE MISSILE STORAGE AND CHECKOUT AREA, AND THE HEADQUARTERS AND ADMINISTRATION AREA. 25X1D 25X1D 25X1D25X1D 25X1D AT LAUNCH COMPLEX 6, FACILIT A AND THE SUPPORT AREA REMAIN ESSENTIALLY UNCHANGED SINCE AT FACILITY B9 2 PROBABLE'VEHICLgS ARE PARKED ADJACENT TO PAD B-2.AND- AN OBJECT/VEHICLE IS OBSERVED ON. A SLIGHTLY WIDENED SECTION (50 FT WIDE)' OF THE 2 LOOP ROADS. THE ENVIRONMENTAL SHELTERS-REMAIN ON"THE ROOFS OF THE 2 SMALL TRIAD BUILDINGS. THE 'APPROXIMATELY DIAMETER, TOWER-MOUNTED, DISH ANTENNA,. WHICH, ON WAS REMOVED FROM-THE ROOF OF THE LARGE TRIAD -BUILDING REMAINS ON THE GROUND ADJACENT TO THE NW'CORNER.. SINCE THE SAME COVERAGE THE RINGLIKE STRUCTURES ON THE. GROUND ADJACENT TO THE BUILDING HAVE BEEN PLACED ON THE-ROOF OF THE BUILDING ENCLOSING THE. TOWER, THUS FORMING A .CYLINDER APPROXIMATELY 110 FT IN DIAMETER. AND 55 FT ABOVE THE BUILDING. ADJACENT TO THESE -CORNER OF THE BUILDING IS A RINGED LIGHT-TONED CAP APPROXIMATELY 90 FT WIDE. THIS CAP-WILL PRESUMABLY BE MOUNTED ON THE CYLINDER- AFTER THE DISH ANTENNA HAS BEEN REMOUNTED ON THE TOWER. A CRANE IS POSITIONED ?BESIDE THE CAP.. - ! NO CHANGE IS APPARENT SINCE IN -? THE BUILDING TRIAD AREAS AT INSTRUMENTATION-SITES 2 AND 10. ELECTRONIC EQUIPMENT HAS NOT BEEN. IDENTIFIED TO DATE ON THE TRIAD BUILDINGS AT THESE 2 SITES. A SECOND BUILDING TRIAD HAS NOT APPEARED AT ANY OF THE 4'TRIAD SITES AT THE TEST CENTER AS IS THE CASE AT 2.0F THE - 25X1D_ TRIAD SITES AT MOSCOW. THE ,1DOME REMAINS IN POSITION ON THE 135 X'125-FT BUI0iNG AT INSTRUMENTATION SITE 2. THE STATUS OF .THE 1-16-FT DOMES WHICH WERE REMOVED AT INSTRUMENTATION SITES 3 AND 10 IS UNCHANGED. AT INSTRUMENTATION SITE 6 THE. 11A-FT DOME REMAINS STANDING. - THE ANTENNA FACE.... OF THE HEN HOUSE-IN THE SUPPORT BASE REMAINS Dr IN TONE. NO FACILITIES HAVE BEEN 19' TOP-SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control System Only Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF MISSION 1018-1, 26-29 MAR 65 TCS-80486/65 CONSTRUCTED AT THE PRESENT TERMINAL POINT OF THE NEW ROAD EXTENDING GENERALLY SW. FROMINSTRUMENTATION SITE 2. THE SAM TRAINING CENTER REMAINS INACTIVE. NO SIGNIFICANT CHANGE IS APPARENT AT THE MAIN HOUSING AREA, THE PRIMARY AIRFIELD, THE LONG-DIRT STRIP, THE NEW AIRSTRIP, THE HEN ROOST ANTENNAS, AND INSTRUMENTATION SITES 1 AND 11 SINCE 25X1D OR AT INSTRUMENTATION SITES 4, 5, 7, B, 9, AND 12 25X1D SINCE IDENTIFICATION ONLY IS POSSIBLE ON POSSIBLE INSTRUMENTATION-SITES 14 AND 15 AND THE UNIDENTIFIED FACILITY BETWEEN THE 2 SITES. PHOTO REFERENCESFOR-SIGNIFICANT ITEMS ON FOLLOW :? LAUNCH COMPLEX A -- LAUNCH COMPLEX B -- INSTRUMENTATION SIT INSTRUMENTATION SIT INSTRUMENTATION SIT INSTRUMENTATION SIT HEN HOUSE ANTENNA - 25X1D 25X1D 25X1D 25X1D PAO-TOU SAM SITE CH 4045N 11004E BONUS 1 9.5 NM NNE OF PAO-TOU. AT 42-45-20N 110-04-30E. COMPLETED SA-2 SAM SITE.IS NEWLY IDENTIFIED. 25X1D SITE CONSISTS OF 4 FENCED LAUNCH POSITIONS; 3 OF WHICH ARE OCCUPIED. THE CENTRAL GUIDANCE AREA IS ALSO OCCUPIED. APPROXIMATELY 46 PROBABLE TENTS ARE LOCATED IN THE IMMEDIATE VICINITY OF ThE SITE. ? (SEE ATTACHMENT) DJAKARTA SAM SITE "ID 0614S 10639E BONUS 2 11.5 NM WSW OF DJAKARTA AT-0614-750S 106-39-00E. NEWLY IDENTIFIED COMPLETED SA-2 SAM SITE WITH IRREGULAR CONFIGURATION. OCCUPANCY UNDETERMINED. 20 TOP SECRET CHESS RUFF Handle Via - TALENT-KEYHOLE Control System Only 25X1D 25X1D Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF MISSION 1018-1, 26-29 MAR 65 TCS-80486/65 PAD-IOU PROBABLE SAM SITE CH 4114N 10941E 41 NM NNW OF PAO-TOU AT.41-14-10N 109-41-00E. IPROBABLE SA-2 SAM SITE UNDER CONSTRUCTION CONTAINS 3 AND A POSSIBLE 4TH LAUNCH POSITION. .THE LAUNCH POSITIONS ARE PROBABLY FENCED AND-VUNOCCUPIED. A PROBABLE GUIDANCE AREA IS UNDER CONSTRUCTION. 1 21 TOP SECRET CHESS RUFF BONUS 3 ? Handle Via TALENT-KEYHOLE Control System Only ? ? Nuclear Energy 25X2 Approved For Release 2000/09/08 : CIA-RDP78T05439A000500030025-0 Next 1 Page(s) In Document Exempt Approved For Release 2000/09/08 : CIA-RDP78T05439A000500030025-0 ? 4:4 Complexes 25X1D Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF MISSION 1018-1, 26-29 MAR 65 COMPLEXES TCS-80486/65 DJAKARTA COMPLEX ID .0610S 10650E COMPLEX, APPROXIMATELY 30 SQ MILES IN AREA, CONTAINS RAIL YARDS AND SHOPS, LIGHT INDUSTRY, MILITARY. INSTALLATIONS, COMMERCIAL, ADMINISTRATIVE, AND RESIDENTIAL AREAS, 2 AIRFIELDS AND PORT -FACILITIES. THE COMPLEX HAS NEVER BEEN COVERED COMPLETELY OR - ADEQUATELY ON KEYHOLE PHOTOGRAPHY, THEREFORE-NEW MAJOR CONSTRUCTION og IMPORTANT CHANGES CANNOT BE DETERMINED. AIRCRAFT (KEMAJORAN AIRFIELD) 3 PROBABLE BADGER, 16 POSSIBLE SWEPT?WING FIGHTERS, 5 POSSIBLE C-47/CAB, 2 POSSIBLE CRATE, 1 POSSIBLE CAT/CUB, 1 POSSIBLE VISCOUNT AND 3 LIGHT STRAIGHT?WING. AIRCRAFT (HALIM PERDANAKUSUMA AIRFIELD) -- 7 POSSIBLE CRATE, 9 POSSIBLE C-47/CAB, 7 MEDIUM STRAIGHT?WING AND 3 LIGHT STRAIGHT?WING. VESSELS (TANDJUNGPRIOK NAVAL BASE AND 'PORT) -- 6 POSSIBLE PCs APPROXIMATELY 66 OCEAN?GOING MERCHANT SHIPS AND NUMEROUS SMALLER-SURFACE.VESSELSo FOR NEWLY IDENTIFIED SA-2 SAM SITE, SEE MISSILE BONUS 2. - 24_ TOP SECRET CHESS RUFF 25X1A Handle Via TALENT-KEYHOLE Control System Only 25X1B Approved For Release 2000/09/08 : CIA-RDP78T05439A000500030025-0 Next 1 Page(s) In Document Exempt Approved For Release 2000/09/08 : CIA-RDP78T05439A000500030025-0 ? Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF MISSION 1018-1, 26-29 MARCH 1965 TCS-80486/65 ATTACHMENT 3- RAIL-SERVED PROBABLE ERECTORS LAUNCHERS N.PIC j-6931 (4/65) LAUNCH AREA 1C, KAPUSTIN YAR/VLADIMIROVKA MISSILE TEST CENTER, USSR TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control .System Only S S 5- Handle Via TALENT-KEYHOL Control System On TOP SECRET CHESS RUFF MISSION 1018-1, 26-29 MARCH 1965 TCS-80486/65 ATTACHMENT 4 NPIC J-6932 l4/65) LAUNCH AREA 2C, KA PUST1N YA R /VLADIMIROV KA MISSILE TEST CENTER, USSR - TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control System Only S Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF MISSION .1018-1, 26-29 MARCH 1965 TC5-80486/65 - ATTACHMENT 5 ????_? NPIC J-6933 (4/65) LAUNCH AREA 3C, .KAPOSTIN YAR/VLADIMIROVKA MISSILE TEST CENTER, USSR TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control System Only S ? a Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF MISSION 1018-1, 26-.29 MARCH 1965 TCS-80486/65 ATTACHMENT 6 FORMER 4C _ SUPPORT AREA. EXCAVATION VEHICLE EQUIPMENT NPIC J-5934 (4/65) LAUNCH AREA 4C, KA PUSTIN YAR/VLADIMIROVKA MISSILE TEST CENTER, USSR TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control System Only Handle Via TALENT-KEYHOLE Control System Only TOP 'SECRET CHESS RUFF MISSION 1018-1, 26-29 MARCH 1965 TCS-80486/65 ATTACHMENT 7 NPIC J-6935 (4/65) LAUNCH AREA 5C, KAPLISTIN YAR VLA6IIMIROVKA MISSILE TEST CENTER, USSR TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control System Only Hondfe-Vio TALENT-KEYHOLE 'Control System Only TOP SECRET