INSTALLATION DATA SHEET

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000500090085-8
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 7, 2001
Sequence Number: 
85
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000500090085-8.pdf102.49 KB
Body: 
ILLEGIB Approved For Release 2001/03/03 : CIA-RDP78TO5439A000500090085-8 Approved For Release 2001/03/03 : CIA-RDP78TO5439A000500090085-8 INSTALLATION DATA SHEET 1. TARGET IDENTIFICATION: a. Pu Shan POL Storage, China b. 25X1A c. Geographic Coordinates - 41-57-12N/124-31-50E d. USATC No. 290-11 dated December 1960 2. LOCATION: Fu Shan POL storage is located approximately 28 nautical miles ENE of Fu Shan and is sited in a small valley about 1 nautical mile south of the Hun Ho Rivera Ta-h!uo Fang resevoir is 3 nautical miles to the west of the storage area. This facility is primarily rail served being connected by a spur track to.a main line railroad leading to Shen Yang and Fu Shun. 3. CONSTRUCTION CHRONOLOGY, 25X1D 25X1 D a. This coverage provided pre-construction photography at the Fu Shan Storage facility, to significant activity was observed. 25X1D b. This coverage established the fact that construction had begun. Obliquity derogated the target covers a of this missions however, no other suitable cover of this area was flown during A possible work camp had been established at the mouth of the valley leading o e storage site. Details of POL facility construction were not visible due to obliquity. 25X1 D e. This coverage revealed that twelve (12) POL storage tanks had been built or were nearing completion by 25X1D 125X1D d. Fourteen (14) POL storage tanks were completed or were nearing completion at the time of this mission. Two (2) additional tanks were in the beginning stages of construction. Twelve (12) possible storage buildings were added to the construction facility at the mouth of the valley. 25X1D e. This represents the latest coverage of-this facility. Nineteen (19) F storage tanks are completed or nearing completion e Additionally, 113) thirteen small POL storage tanks have been installed. The total number of possible storage buildings in the construction camp has been increased to twenty- seven (27). Nuu-ZEURM J k PAPER Declass Review by NIMA/DOD .~ f6ii'EILNN DISSEN 5-/ -/'S- aw nn 1W %TPU 7_x WT .L 'i ,r M% 25X1D STORAGE, SHIPPING AND RECEIVING FACILITIES: 1Ul\ A-SM Storage facilities consist of f 15) earth mounded POL tanks, i in diameters 4 unfinished POL tanks in diameter and 13 above ground cylindrical POL tanks 40 feet in diameter. Support facilities include 14 buildings, ? spur track will serve this storage complex when it is completed, although no rails appear to have been laid upon the road grade leading to the storage area. The probable con- struction support camp at the mouth of the valley has no permanent characteristics !andwill probably be dismantled upon completion of the FOL storage facility. 5. -DEFENSES: 6. PHOTOGRAPHIC REFERENCES; 25X1 D 25X1 D NOTES The topography of the target area is generally mountainous,, with elevations up to 4&000 feet MS!., which causes this area to have a high incidence of cloud cover# and greater snow fall, because of this chronological gaps in the photographic coverage has resulted or in some cases the interpretability of the photography derogated to varying degrees. 'TOP E REf r-1 PAPER NO FOREIGN DISSEM 5- -;?-/ S,5-