CHINESE SHIPYARDS AND PORT FACILITIES
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05439A000500090094-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
10
Document Creation Date:
December 28, 2016
Document Release Date:
September 9, 2003
Sequence Number:
94
Case Number:
Publication Date:
June 14, 1965
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 346.08 KB |
Body:
Approved For Release 2003/12/09 : CIA-RDP78TO5439A000500090094-8
Approved For Release 2003/12/09 : CIA-RDP78TO5439A000500090094-8
M ORANDUM FOR:
GMD/PAG/M-91-65
14 June 1965
Pre-release of Detailed Photographic Interpretation
Report, "Wu-han Shipyard, China".
Colonel, USA
Assist for Photographic Ana3ysis, NPIC
THROUGH:
SUBJECT:
REF'ERII~CE?
NSA/TCO
25X1
25X1A
NSA/LO/NPIC
Chinese Shipyards -and Port Facilities
Requirement No NPIC Project
a answer)
Part
No. 12037-64 (
in response to the reference requirement, the attached material is
forwarded herewith:
AttacYment:
As stated above
Distribution:
Qrig & 1 - NSA/TCO w/att
1 - PAG/NPIC
1 - IPO/PAG/NPIC
1 - GMD/PAG/NPIC w/att
Declass Review by NIMA/DOD
25X1A
1 - AFNIE-BA Attn: Lt.'C
1 - OPNAV 922Y3 Attn: Ca
1.,- Army/SPAD Attni, Ma j .
1 - DIAXX-3A w/att
1 DIAXX-3C w/att
, CSD/NPIC w/att
1 - DIAXX-4/LO/NPIC
1 - CIA/PID
1 - Os/NPIC
itaz.a,t.,,t?~ _ A
25X1
.25X1A
Wu-han Shipyard. China
chment to GMD/PAG/M-91-65
ted 14 June 1965
The.Wu-ban Shipyard under construction is located just NE of the out-
skirts of Wu-hang China and on the southern bank of the Ch'ang Chiang
(river) at 30-39N 114-26E.
25X1D The entire shipyard is tinder construction and has been since
Little change has occured during the period of comparative analysis
with only 1 minor building constructed and 1 building removed. Neither the
launching system nor the building/repair ways have been completed although
one river barge was probably constructed here. handling facilities are
limited to one jib crane.
An area of ship repair is located on the river immediately north of
the shipyard and services river vessels. This repair area contains 4 marine
railw ys. Poor photography limits identification of vessels however, no
naval vessels have been observed and only river craft are repaired.
cs, yr
Esc!: t tr:a ntrsA
u-rra; cad
6
14
15
16
IT
19..
20
Facilities (Key to Figure 2)
Transverse Launching System
Under Construction (U/C)
.Building/Repair Ways (U/C)
Dimensions "rt
870x460
25X1 D
Possible Machine Shops
Flat With monitor
Possible Machine Shops
205x95
Complex
Possible Machine Shops
160x130
Complex
Possible Machine Shops
13oxl0
Flat
Possible Machine Shops
90x25
Flat
Possible Fitting-out Shop
275x6o
Building (U/C)
350x80
Building (u/c)
350x80
Building (U/c)
350x80
Outline of ,Vertical Members
for New Building
350x80_
Outline of Vertical Members
for New Building
350x80
Possible Fitting-out Shop
370x240
Support Building (U/C)
90x35
Support Building
105x50
Support Building
105x55
Gable with Monitor
Probable Shop
. Building
230x75
Flat with monitor
Probable Shop Building
180x80
Flat with monitor
Support Building
135x35
Gable
Quarters/Support Buildings
215x30
Gable
22 thru
40
All Quarters/Support Buildings
41
Quarters/Support Buildings
42
Possible Mess Hall
43
Support Building
44
Support Building
45
Support Building
46
Unknown Building
4T
_.
Support Building
48 tbru
51
Quarters Buildings
52
Unknown
53
Mess Hall . ?
54
Mess Hall
55 &
56
Quarters Buildings
57-
59
.60
61
62
63
64
65
66
Quarters/Administration
Building
Quarters Buildings
Quarters Building
Unknown Building
Possible Shop
Possible Shop
Possible Shop
Possible Shop
Dimensions(ft
25X1 D
180x145
100x85
115x60
Roof Type
Gable each
Gable
Complex
Gable
25X1 D
Gable
Gable
25X1 D Complex
Possible Gable
195x40 each
170x70
100x50
150x120
195x40 each
175x30
180x35
190x60
100x40
100x40
80x40
125x50
100x60
105x20
10Ox100
Gable each
Probable Flat
Probable Flat
Gable
Gable each -
Flat
Hipped
Hipped
Hipped
Possible Flat
Flat
Flat
Possible Gable
Possible Gable
Item -Fuinction
6 Posh sible Shop
68 Possible Shop
69 , ' Pd
70 '
Dimension -(ft)
65x30
130x20
asible Shop 8Ox35
tine Railroad Area 200x130
Roof Type
Possible Gable
Possible Gable
Possible Gable
pro= Foi003/12
14 June
Copy , 9
MEMORANDfM FOR: Chairman,, Deployment Working Group, GMAIC-
SUBJECT: Search for Soviet ICBM Sites
REFERENCE: GMAIC Requirement-22-64
(NPIC Project 11047-5)
25X1 D
25X1A
1. In response to the referenced requirement, a search for
newiIC33M complexes and a re-examination of previously reported
suspect areas between Ia3N - 56N latitude was conducted by the ICBM
team on Mission . The following area
of suspect activity was reported:
I New rail spur and unidentified activity.26 nm SE of
Minsk. 53-36N/27-51E.-
Distribution:
1&2-GMAIC
3-Dir/NPIC
4-PAG/NPIC
5-IPO/PAG/NPIC
6-S&!TD/PAG/NPIC
7-CIA/PID/NPIC
B-OS NPIc
9_CSD/NPIC
lis considered
lO-DIAXX-4
ll-NSA/LO/NPIC
12-AFNIE-BA'
13-OPNAV 922513
14-Army/SPAD
l5-DIAXX-3A
16-DIAXX-3c