ICBM COMPLEX, PLESETSK, USSR PROBABLE LAUNCH AREAS G AND H

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000500130007-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
7
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 2, 2001
Sequence Number: 
7
Case Number: 
Publication Date: 
May 1, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000500130007-9.pdf219.99 KB
Body: 
Approved For Release 2001/08/07 : CIA-RDP78TO5439A000500130007-9 Approved For Release 2001/08/07 : CIA-RDP78TO5439A000500130007-9 ..-I Approved For Rel4ase 200JL28/07 ;CIA-RDP78T05439A0005b010~~7~9 PHOTOGRAPHIC INTERPRETATION REPORT May 1965' S17677 ICBM.. COMPLEX,? PLESETSK USSR PROBABLE LAUNCH AREAS G AND 'H DECLASS REVIEW by NIMA/DQD .TCS.86617/65 Handle Via TALENT- KEYHOLE Control only- NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER WARNING This document contains classified'Informotion affecting the national security of the United States within the meaning of the espigiage laws U. S. Code Title 18, Sections 793 and 794. The low prohibits its transmission of the"nwletion-of'its contents in any manner to on unauthorized person, as well as its use In any manner prejualcial to IN* safety or interest of .the United States or for the benefit of any foreign government to the detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized to receive TALENT,KEYHOLE Information. Its security must be maintained in accordance with KEYHOLE and TALENT regulations, Approved For-Release 2001108/07: CIA-RDP78TO5439A000500.130007-9 ? TOP SECRET RUFF Handle Via TALENT-KEYHOLE Control System Only TCS-80617/65 ICBM COMPLEX, PLESETSK, 'USSR PROBABLE LAUNCH AREAS, G AND H NATIONAL PHOTOGRAPHIC-INTERPRETATION CENTER TOP SECRET RUFF - Handle Via TALENT-KEYHOLE Control System Only Approved For Release 2?9 '?7E fr P-qUp439A000500130007-9 Handle Via TALENT-KEYHOLE - Control System Only Launch Points 1 and 11 (TDI Site 1) 62-55N 62-55N Launcb Point I11 (TDI Site 2) 62-56N Launch Point LV (TDI Site 3) 62-57N Launch Site A (TDI Site 4) 62-58N Launch Site B (TDI Site 5) 63-03N Launch Site C (TDI Site 6) 63-OIN Launch Site D (TDI' Site 8) 62-53N Launch Site E (TDI Site 7) 62-50N Launch Site F (None) 62-52N Probable Launch Site G (TDI Site 9) 62-53N Probable Launch Site H (TDI Site 10) 62-53N / ? A32-3 LAUNCH POINTS Timmel I II III ADMINISTRATION AND HOUSING FACILITY , RAIL-TO-ROAD TRANSFER POINT _ .-PROB~ii3 LAUNCH A FIGURE 1. LOCATIOt l5F COMPLEX. TOP` SECRET RUFF 40-27E 40-28L 40-32E 40--I1L 40-47E 40-58E 40-52U 40- SUE 40-36E 40-44E 40-51E 40-52E Railroad Road ? SAM site NAUTICAL MILES NP(C K-1457 15/55) Handle Via TALENT-KEYHOLE Control System Only Approved For Release 2001/08/07 CIA-RDP78TO5439A000500130007-9 Handle Via TALENT-KEYHOLE Control System Only TOP SECRET RUFF TCS-80617/65 25X1 D 25X1D 25X1 D 25X1 D This report, based on KEYHOLE photog- raphy through supplements NPIC-/'R-272 !64, dated May 1964. 1 / Probablel, Launch Areas G and I I are located approximately 5.9 nautical miles (nm) and 6.3 nm, respectively, east-southeast of the complex support facility (Figure 1). They represent the Type IB mode ' of. Soviet ICBM deployment'. Each area was see for the first time in _ when initial clearing and probable security fencing were apparent: each area can be negated 2b days earlier in the same month on A 'common support facility serves both launch sites, anti=-con~ists of an administration and housing section, a logistical support section, and a motor pool/vehicle park (Figures 2 and 3). The administration and housing section, located approximately 5,000 feet south of! Launch Site G; consists of 11 barracks-type buildings, 3 L-shaped buildings, and approximately-23 other buildings of various sizes, 1 of I which has a bilevel roof. The logistical support section is centrally located between. the 2 launch sites and he administration and housing , section._ It consists of 20 buildings, includin a' probable batch plant, 3 probable building, at least 2 storage tanks, a mast/stack, and everal areas of open storage. A dead-end rails ding contain- ing` 4 tracks with a combined len- h of approx- imately 2,200 feet is located on the western edge of the logistical support section. T motor pool/ vehicle park is located southwest the logistical support section, about midway `bet een it and the administration and housing section. It contains 4 buildings and a vehicle parking rea. Probable Launch Site G conains a- rail- served launch site, apparently in a midstage of construction. The rail right-of-way approaches the site from the south, bypasses it on the east and terminates north of the site. Approximately 340 feet south of the terminus, it branches to the south to form a "wishbone" pattern which, when complete, will provide rail service to the 2 probable launch positions and the area between them. The launch site consists of a fenced area containing 6 unidentified structures under con- struction and interconnected by ditching. Four of these structures are aligned on an approximately north-south axis and the other 2, approximately 585 feet apart, lie on opposite sides of this line in previously existing notched excavations. Ditch- ing, c6fitatning-cot` uit- approximately _ 10 feet across, connects the 2 outer structures with those on the north-south line. A shallow, rectangular excavation is located just north of the northernmost structure, and several shallow, circular excavations can be seen at various points in the launch site. Probable Launch Site H, also.in a midstage ,of construction, is located approximately 3,850 feet east-southeast of Probable Launch Site G. It is also fenced, and will be rail served by a ."wishbone" pattern of tracks serving the launch site from the north. As at Probable Launch Site G, there are 6 unidentified structures intercon- nected by ditching at Probable Launch Site H. Conduit is visible in some of the ditching between the structures, but photographic quality will not permit verification of its presence throughout the site. Narrow ditching, connecting Probable Launch Areas G and H, extends from a point near the eastern edge of the northernmost building at Probable Launch Site G to a point just northwest of the northernmost building at Probable Launch Site H. TOP SECRET RUFF I Handle Via TALENT-KEYHOLE Control System Only Approved For Release 2001/08/07 : CIA-RDP78TO5439A000500130007-9 Next 1 Page(s) In Document Exempt Approved For Release 2001/08/07 : CIA-RDP78TO5439A000500130007-9 Approved For Release 2001/08/07 : CIA-RDP78TO5439A000500130007-9 TOP SECRET RUFF Handle Via TALENT-KEYHOLE Control System Only MAPS OR CHARTS - US Air Target Chart, Series 200, Sheet O102-9AL, '?d ed, Dec 61, scale 1:200,000 (SECRET) DOCUMENT 1. NPIC. R-273,'64, ICBI! Complex, P1r..et.Yk. USSR, May 64 (TOP SECRET RUFF) REQUIREMENT GMAIC. _?-65 TOP SECRET RUFF Handle Via TALENT-KEYHOLE Control System Only-