PROBABLE SOLID PROPELLANT ROCKET MOTOR TEST FACILITY AND ASSOCIATED PRODUCTION FACILITIES, KEMEROVO, USSR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05439A000500150013-0
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
8
Document Creation Date:
December 28, 2016
Document Release Date:
July 25, 2003
Sequence Number:
13
Case Number:
Publication Date:
June 1, 1965
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 390.61 KB |
Body:
Approved For Release 2003/09/03 : CIA-RDP78TO5439A000500150013-0
Next 1 Page(s) In Document Exempt
Approved For Release 2003/09/03 : CIA-RDP78TO5439A000500150013-0
PROBABLE SOLID PROPELLANT ROCKET
MOTOR TEST FACILITY AND ASSOCIATED
PRODUCTION FACILITIES, KEMEROVO,; USSR
25
25X1A
25X1A
TOP SECRET
PROBABLE SOLID PROPELLANT ROCKET MOTOR-TEST FACILITY
AND ASSOCIATED PRODUCTION FACILITIES, KEMEROVO, USSR
INTRODUCTION Kemerovo Ammunition Loading and Lxplo-
"This report describes a probable solid pro-
pellant rocket motor test facility andassOciated
production and storage facilities identified near
Kemerovo, USSR (Figure 1). The test facility is
located at 55-26N 85-57L, on the north edge of
Kemerovo Ammunition Loading and L-xplosivds
Plant Raketa 3y2
I
photography of
provided the only good-quality coverage in
the site was not observed inII hoto r-
rgphy of the facility was obtained inl
Mien first observed in
the
,;PROBABLE
SOLID
PROPELLANT
ROCKET MOTOR
TEST FACILITY
AMMUNITION LOADING ~
AND EXPLOSIVES PLANT
RAKETA 392
Railroad, single track
Possible railroad
Road
TOP SECRET
25X1 D
25X1 D
25X1 D
25X1 D
25X1 D
25X1 D
TOP SECRET
__~ ~~ \ _ I gyp, ~t ~ ?~
EXPLOSIVES MANUFACTURING AND
MUNITIONS PRODUCTION AREAS
PROBABLE SOLID PROPELLARI
ROCKET MOTOR TEST FFACILITY
I
FIGURE 2. KEMEROVO PROBABLE SOLID PROPELLANT ROCKET MOTOR TEST FACILITY AND AMMUNIT
25X1 D
TOP SECRET
TOP SECRET -
Railroad
----Railroad under construction
Road
---- Track or trail
- F- Fence
w- Wall
Steamline
Revetment
o Possible semiburied tank
1
290 x 205 x 50h
(185 x 60 x 85h
high-bay section)
2
270 x
80 x,65h
3
120 x
60
4
130x
40
5
95 x
65 x 50h
6
215 x
95
7
115x
65
(irregular)
8
155 x
65
9
95x
55
FIGURE 3. PROBABLE SOLID PROPELLANT ROCKET MOTOR TEST FACILITY AND ASSOCIATED
TOP SECRET
25
TOP SECRET
Propellant Rocket Motor Test Facility had not
Propella it Rocket Motor Storage Area and the
Probable Solid Rocket Propellants Manufactur-
ing Section. Construction of the Probable Solid
25X1 D By both the storage area and
the manufacturing section appeared to be com-
plete, and the test facility was in a late stage of
construction
25X1 B
25X1 B
25X1 D
25X1 D
25X1 D
rI-he period of construc-
tion also corresponds to the: yeais~
when other Soviet solid propellant facilities
5 were -under construction.
PROBABLE SOLID PROPELLANT ROCKET MOTOR
0
TEST FACILITY _
The Probable Solid Propellant Rocket Motor
Test Facility (Figures 2, 3, and 4) occupies an
area of approximately 80 acres surrounded by
both a wall and a, fence. I tie most prominent
feature of the facility is an L-shaped revetment
50 feet high, the legs of which,ineasure 3:30 and
240 feet long at the apexes. ,I he revetment is
sited in such a wav that it will protect the stor-
age area to the southeast from shock and vibra-
tion. There are 8 buildings within the .%alled
area, I of which is reverted on 3 sides and may
be the control building. Dimensions of the prin-
cipal structures are presented in the table inset
in Figure 3. Grading patterns within the area in-
dicate that rail spurs will serve at least 3 of the
buildings and the test nand cell. Iwo steamlines
also enter the facility.
Construction of this installation began be-
fore at that time the south leg
of the L-shaped revetment was visible. l1v
to be nearly completed, and most of the buildings
discernible on the most recent photographs were
the I shapedirevetment appeared
TOP SECRET
struction activity has been concentrated in the.
interior angle of the L- shaped revetment where a
possible vertical test stand is under construc-
tion. Figure 4 presents a perspective view of
the revetment and the surrounding area of the
test facility. _
This facility is similar in some ways to solid
propellant rocket motor test facilities at Krasno-
varsk, Perm, Sterlitamak, Biysk, and Kamensk-
Shakhtinskiv. 1-5 It does not, however, include
an H-shaped or a modified H-shaped probable
assembly and checkout structure found at 4 of the
other 5 sites. This facility also differs in that it
has a large 1.-shaped revetment rather than a
horizontal blast deflector. -
POSSIBLE SOLID PROPELLANT ROCKET MOTOR
- STORAGE AREA
1-he Possible Solid Propellant Rocket Motor
Storage :\rea, over 1OO acres in area, is also
secured by both a wall anda fence. It contains 7
or S storage buildings. 4 possible semiburied
tanks, one small structure in a wraparound re
vctment, and a newly built rectangular building
considerably higher than the others item 2.
Figure 3). All of the :structures except Build-
ing 2 were present when the area was first: seen
in
The tallest building (item 2) is 05 feet high
and could he used as a temperature-conditioningg
structure or possibly as ashort-term storage fa -
c_ility for large rocket motors. 1 hi building is
similar to a building in the storage area adjacent
to the Probable solid Propellants \lanufaeturing
Area at Kanten;k-tihakht inskiv. 5 1'ho!ography
re-yea led 1--l-011111i scarring in
of
I
the area no\\ occupied by Building 2: cons: rue: ion
of the building could be observed ill
I it appeared to ha ye beencontplete
25X1 D
25X1 D
25X1 D
25X1 D
25X1 D
25X1 D
25X1 D
TOP SECRET
25X1 D
25X1 D
25X1 D
25X1-D
No other significant changes have
occurred in this area.
PROBABLE SOLID ROCKET PROPELLANTS
MANUFACTURING SECTION
The Probable Solid Rocket Propellants Man-
ufacturing Section is located between the pre-ex-
isting high-explosives and double-base powder
manufacturing sections of the Raketa 3142 plant
(Figure 2). This new section is almost identical
to the Probable Solid Propellants Manufacturing
Area at Kamensk-Shakhtinskiy 5 and i.s similar
to the la~ger of the 2 Probable Solid Propellants
Manufacturing Areas at Perm. 2
The majority of the facilities in thiscci ion
Almost all of the structures in the section, --
except 2 or 3 buildings at the west side appear to
have been complete q by
nd these 25X1 D
exceptions appeared to be essentially com lete
on photography of 25X1 D
revealed smoke or steam rising from 25X1 D
at least one of the structures in the row of build-
ings on the west side.
Kemerovo appeared to have been present in
although most of them were then under
revealed continuing construc-
tion; the high-bay section of .Building I had been
erected by that time, and the entire building was
apparently complete b\' of the same
year. The 85- foot high bad' could e used for as -
sembliug and casting large solid propellant rock
et motors.
FIGURE 4. PERSPECTIVE VIEW OF PROBABLE SOLID PROPELLANT ROCKET MOTOR TEST FACrc'ri
25X1 B
TOP SECRET
TOP SECRET
25
REFE.I?EN
25
25
25
25
25
25
25
25
25
25
25X1 D
'A('. I'S Air Target ('hart. Seri"' Yin. rh~?~?~ 11; 1- I1. _'11 -d .Jul 62 -,,;k I- I
1
DO('I \1ENT-
1 ?:X: l : .(. . :('RET I
U it'
0
0
TOP SECRET
r a;. ..;. (TUP ~E( 1tF:T