DUAL HEN HOUSE-TYPE ACTIVITY NEAR OLENEGORSK, USSR(Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000500210057-5
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 14, 2001
Sequence Number: 
57
Case Number: 
Publication Date: 
June 1, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000500210057-5.pdf261.43 KB
Body: 
Approved For Release 2001/11/19 : CIA-RDP78TO5439A000500210057-5 Approved For Release 2001/11/19 : CIA-RDP78TO5439A000500210057-5 Ha~di via TALENT -:KEYHOLE control only WARNING TFI. 1?.YIIIMI ~?...aIM .I...111.1 NlwwwI .N.illn? Ill. n.lI I ...wiry .1 IM LlnlN1 fMn..I hin IF. ~..nl. ?1 1h...11.Mf?.1?....U. I. CJ? TI/M II. MaIM. 7p .J 741? TF. I....S.FIFi1. RfTIM..IN.IM M M. I...MIIM .1 II..MNnN'It wry-1M?INI 11 M YMYIFMI.J .w.M. ?. Yr?11 ?. IN uN In My Mrs.. p.IJl.l.l 1. lb. NNry M NMN., ?I IM U.II d IN... w IV /M "III ?I .p 1w.iin ...wn.M1 N M: 1.NI.M/ .1 Nr MIf by U. I.1?I.MMI np.ldlr In1MnlrIrnN1 .J .YMwl.J N n..l.. TALENT-KEYHOLE InIMM11M. It..?.wlry wat M,N?InNInJ I. M...d?.. ylt KIYHOLE . 4 TALENT N ,htIM... ' NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER Hnndla V,a TAL ENT.KEYHOLE Cowol Sy+ioo 0aly 25X1 D 25X1 D 25X1? 82,388 and C-It l(5-82,3.59, with supplement I. It updates a previous report, 1/ primarily on the Olenegorsk dual III:N II011SE-type activity, and contains information on new. developments from TOP SECRET CHESS RUFF 25X1 D DUAL HEN HOUSE-TYPE ACTIVITY' NEAR OLENEGORSK, USSR 25X1 D 25X1 D 25X1 D INTRODUCTION Illis report is In response to CIA requirement C-RitS- Since the photography of= and report of October 196-1, this activity has been covered by 1 small-scale KI I--1 mission 'Ibis dual I IGN IIOUSB-type activity, 10.5 nautical miles (nm)?east of Olenegorsk Airfield at 68-07N 33-5-117 (Figure 2), consists of it secured operations area and an unsecured support area. the operations area consists of a double-fencedarcaof approximately 48.5 acres containing the dual IIEN HOUSE, type structures, with their associated central control build- ing, and 8 operational support buildings. The support area consists of 74 buildings and structures, or buildings under construction, and is approximately 0.5 min generally south of the operations area. building, is approximately 200 by 20 feet and of undetermined height.. 'Iwo probable entrances, each 20 by 15 feet by 10 feet high, are on the southeast side of the central portion of the control building. Also treated as it part ofthe ofthecentral cobuilding are the small structures or connecting galleries which join the control building tathejiteltna buildings._'Ihese connecting structures are on the north and west corners of the central control building and are each canted 15 degrees toward the southeast in relation to it. These connectingstructures are each approximately 85 by 35 feet by- It Is in- teresting to note that the heights of the structures are- above that of the central control building front which they emanate. nr_vA r 25X1D 25X-1D HEN HOUSE-TYPE`'ANTENNA BUILDINGS "line 2 IIEN I10USE-type antenna buildings appeared to be externally complete in The large-scale photography. of = provides the best view of the antenna faces, which are black in tone. Although this photography lends itself quite well to reliable linear measurements It is not possible to measure the overall height of the structure and con- 25X1 D 25X1 D 25X1 D 25X1 q 'I he dimensions of the main structure are approximately 875 _ feet. The antenna face is approximately 83.5 feet long; the width is undetermined. The height of the rear of the linear structure Is approxlinatelyIIIIIIIIIIIIIIIII~ and the hori- zontal distance from the rear of the building to the roof ridgeline is approximately- From the roof ridgeline to the front of the structure the horizontal distance is ap- proximately In addition there is it terminal building approximately 80 by. feet and approximatelyNfeet high, giving an overall length of approximately 955 feet for the linear building. 'Further Information with regard to the dimensions may be obtained front the rectified line drawing (Figure 2). 25X1 D Sixty-six probable crates measuring approximately 30 -feet high are immediately in front of the southwest antenna building. +n additional 9 smaller probable crates are also present in the saute area. Sixty-five of the large probable crates and at least eighty-eight 20-byIIIIIIIIIIIIIIIIIIIIprob- able crates are near the security fence northeast of the northeast linear structure. 25X1 D Of the 8 operational support buildings within tile SeCtired operations area, 3 are new and I is newly observed since Information regarding functions and dimensions may be found in the key to annotations with Figure 2. Additional discernible details arc: 25X1 D __-a__,hallow._dltclt,probably_for_surfacc-drainage, Is situated to the rear'of both linear structures and around the rear of the central control building; a.backfilled trench between it probable pumping station and a Inke to the west; an open trench between the central control building and the water supply facility; an open trench, probably. for power cable, from the rear of the central control building -- through the support area -- to the power substation; an open trench In straight-line segments forminga .semicircle partially around the maintenance building, OPERATIONS AREA ' sequently, it Is not possible to determine the slope of the CENTRAL CONTROL BUILDING antenna faces. ?fie Z-linearbuildings are situated so I endorcacli. tile central control building is Ixiween the 2 linear abuts the ends of the aforementiotfed connecting structures, antenna buildings, and consists of a large central portion and they appear to be mirror Images. and 3 lower, level wings, 1 each on the northeast, northwest, The southwest linear structure is oriented north-north- and southwest sides of the central portion of the control cast/south-southwest, with the face of the antenna oriented building. On photography of early on a boreelght azimuth of- The northeast linear Mall components appeared to be externally complete. structure Is oriented northeast/southwest, with the antenna The large, central portion of the control building is approxl-, face oriented on a boresight azimuth of- Both mately 200 by NO feet- I'he lower-level azimuths are correct to within a plus or minus- wings on the northeast and southwest sides are each approxl- Since the appearance and mensuration Indicate that the mately 140 by 40 feet The third wing, on the . 2 linear structures are probably identical, and mirror northwest side of the large central portion of the control Images, a description of only I will be given in this report. . 25X1 D. 25X1 D 11 25X1 D 25X1 D 25X1 D 25X1 D _I. TOP SECRET CHESS RUFF Handle Via TALENT.KEYHOLE Coot,al Sy... Only Approved For Release 2001/11/19 : CIA-RDP78TO5439A000500210057-5 25X1 D Next 2 Page(s) In Document Exempt Approved For Release 2001/11/19 : CIA-RDP78TO5439A000500210057-5 HondI. Via TAL ENT.K EY HOLE Cont,nl Syn.m Mly 25)(1 D fence; two spoil, piles near the end of the southwest linear structure; an open trench, for it possible buried conununica- tions link, from the entrance of the secured operations area to it point near the road to Olenegorsk. TOP SECRET CHESS RUFF and containing at the northwest port ion a possible buried tank approximatcly two approximately ~nlricd tunksnorth- east of the maintenance building; it probable spoil pile outside thenorthwest security SUPPORT AREA '1 lie Support area consists of,housing and storage bill ld- ings, a water supply facility, a power substation, and a sewage disposal plant. There are 74buildings,or structures; an Increase of 26 since the report of-of which 13 are new and 13 are newly observed on the large-scale photography. Dimensions and descriptions may be'found In Figure 2. the main water supply facility Is in2parts: a probable water treatment plant and a water pumping station. The treatment plant consists of I approximately building, 2 approximately - semiburied probable sedimentation. basins, and an approximately - foot diameter standpipe of undetermined height. Thepuml-- ing station consists of 2 buildings on the shore of the lake cast of the treatment plant. A pipeline scar can be seen between the 2 facilities, as can additional scars from the treatment plant to the operations area and 1uarious parts of the support area. A second probable water supply facility is southeast of the primary pumping station. This smaller facility is evidenced by an approximately diameter intake it the ekeand fhe pipeline scar leading from the intake to the support area. A power substation under construction Is Situatedatthe Southeast extremity of the support area. This facility and the powerlines leading Into It are the subject of a separate report (in preparation under NPIC Project 11125/65), 'I he -1 buildings, however, have been Included in Figure 2. A probable Sewage treatment plant Is being constructed south of the main road. It consists of 2 approximately= foot diameter probable digesters, a sewage treatment and pumping station, and 3 small support buildings. ,11:11'5 Olt CHARTS ACIC. ONC c-4, 4th clnn.nifilil oditinn, SIT 00, --l- (CONFIDENT11m) S;IC. 1'S At, Tnrpot ('hart, /'rw -, 41111, 5hvul (1051 ^IIL, Id od, Sop 0:1, mono 1:200,ttun (SECliET') I. SPIC. It-85504, D-1 BEN 110USE-Type .i 1, itir. Ara, Olrnrynrnk nn1 ,Ingo nk, 1'5,511, and ComywiS with Sit, 13, RS;175'. Ort 01 ('TOP SECRET CHESS RUFF) CIA. ((ttlt,'C-IIIt5-84,350, with nuppI'tt ant 1; Oltli'C-RIt5-h4,ahh 25X1 D 25X1 D 25X1 D -4- 25X1 D TOP SECRET CHESS RUFF Hondl. Via 1 AL ENT-K EYIIOLE Control Syw.,n Only