GROZNYY PETROLEUM REFINERY GROZNYY, USSR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05439A000500290056-8
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
6
Document Creation Date:
December 28, 2016
Document Release Date:
January 16, 2001
Sequence Number:
56
Case Number:
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 203.09 KB |
Body:
Approved For Release 2001/11/07 : CIA-RDP78TO5439A000500290056-8
Approved For Release 2001/11/07 : CIA-RDP78TO5439A000500290056-8
Handle Via
TALENT-KEYHOLE
C..trel System Daly
GROZNYY PETROLE M REFINERY
GROZNYY, USSR
TCS - 9461/65
PIR - 65017
1. The Groznyy Petroleum Refinery is located one nautical mile south-
west of the center of the city of Groznyy, USSR and two nautical miles north-
east of the Novo-Groznyy Petroum Refinery. (Figures 2 and 6). Approximate
geographic coordinates for the center of the Groznyy Petroleum Refinery
are 43 18N - 45 39E and its orientation is northeast/southwest.
The refinery is irregular in shape with maximum dimensions of three
miles by two-miles and it covers an area of approximately two and a half
square miles. It is served by road, rail, and probably by pipeline.
Photography over the refinery reveals that it is a major refinery
with at least fifteen distillation units, five cracking units, additional
refining and processing facilities, and considerable POL tank storage. A
more detailed discussion of facilities present at the refinery is given in
part 2, section a.
GJCGYll111t11.1Vi1, UI aii avaiiaoie pnoLOgrapnic coverage from -
indicates that the refinery was active during this period.
Smote can be seen coming from a number of refining units as well as steam
from the cooling towers; in addition, a number of units and buildings
producing or using heat can be seen on photography with snow cover.
The photographic coverage also reveals that a major expansion of the
refinery has been underway for the past three'or four years; two large areas
are under construction as well as a buried pipeline linking these new areas
with the main refining area. In addition, minor changes and small additions
to previously existing facilities have occurred. Details concerning this
construction activity and changes are discussed in part 2, section b.
2. The limits of the Groznyy Petroleum Refinery and the various sections
within the refinery are shown on Figure 5 of this report.
a. The annotations on Figure 5 correspond to the following discussion
of facilities present at the refinery.
(1) Intermediate and/or final product storage area, including
a number of warehouse/maintenance type buildings.
_(2) Probable administration area.
(3) Possible natural gas plant with several small, possible
gas fractionating units, POL tanks, blimp tanks, and a
possible flare tower. ,
Declassification Review by NIMA /.DoD
- 1 -
Handle Via
TALENT-KEYHOLE
Control System Only
Handle Via
TALENT?KEVNOLE
clattel System Daly
TCb - 9461/65
PIR - 65017
CIA IMAGERY ANALYSIS DIVISION
I
(4) Distillation area with a two column unit and associated
facilities, several processing buildings, a number of
warehouse/maintenance' type buildings, and POL tanks.
A rail spur serves the east side of this area. ,
(5) Large POL tank storage area with a number of warehouse/
maintenance type buildings. A small pipe furnace, possible
pump house, and associated laydown tanks are situated
near the center of this area. In addition, a tankcar
loading and unloading facility is located in the northern
corner of the area. -
(6) Distillation area with two adjacent, single column units,
atwo column unit, intermediate and/or final product
storage, and a number of warehouse/maintenance type
buildings. A large tankcar loading and unloading facility
consisting of several rail spurs is?located along the south
side-of the area.
(7) Probable processing and packaging area with several heat
processing buildings, a number of warehouse/maintenance
type buildings, and POL tank storage. *The northern
portion of this area is open space except for two small,
single column distillation units.
(8) Distillation area with two adjacent, single column units
and associated facilities, including probable oil treating
facilities. A possible processing building and a number
of warehouse/maintenance type buildings are located in
the northwest corner of the area. A small suspect
..distillation unit with associated intermediate and/or
final product storage, including blimp tanks, is located
in the eastern corner.of the area.
(9) Tank farms.
(10) Distillation area with one double column unit, two single
column units, POL tanks, and a probable boilerhouse.
(11) Heat and power plant with associated facilities.
(12) Warehousing/maintenance area. .
(13) Cokq oven plant with two coke oven batteries, a probable
asphalt still battery, POL tanks, and open materiel
storage.
(14) Probable lube oil area with dewaxing and clay treating.
facilities. The area also contains a number of processing
and.warehouse/maintenance type buildings, as well as
intermediate and/or final product storage.
(15) Cracking and distillation area with two cracking units,
two sirfgle column distillation units, two possible distillation
unit., and POL tank storage.
TOP SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Control System only
TOP SECRET CHESS RUFF
I
Paula Via
TALENT?KEYNOLE
Caatral System Daly
TOP SECRET CHESS RUFF
Tcs - 9461/65
PIR - 65017
(16) Probable pipeline station.
(17) Tankcar loading and unloading area and associated POL
tank storage.
(18) Probable contact coking unit.
(19) Cracking and distillation area with three cracking units,
two distillation units, and associated POL tank storage.
From north to south, the units are aligned as follows:
a several column distillation unit, a cracking unit,?a
several column distillation unit, and two cracking units.
(20) Probable polymerization and vapor recovery area with
associated blimp tanks; a probable vapor recovery unit is
situated between two polymerization units.
(21) Water treating facilities.
(22) Buried pipeline under 6onstruction? a broken line shows the
25X1 D extent of construction 'as of while a dash-
25X1D dotted line shows additional construction up to
(23) Unidentified processing area, possibly for be
o refining
and processing, with a distillation unit-in the western
portion of the area and an unidentified refining unit
located along the southern edge. The area also contains a
number of processing and'warehouse/maintenance type buildings,
several administration buildings, a boilerhouse near the
northern edge of the area, and POL tank storage. Additional
construction in the northern portion of the area appears to
be currently in progress (section b, number-5).
(24) Probable processing area in a middle stage of construction
and consisting of a number of processing buildings, cooling
towers, POL tanks, and blimp tanks.
(25) Suspect refining area in an early stage of construction
and consisting?of cooling towers, POL tank.storage, and
a number of probable processing or pump house/control
buildings, complete or under construction. The foundations
for several suspect refining units are currently under ?
construction.
Facilities adjacent to but not part of the refinery have
been annotated on Figure 5 by the following letters:
a) Clay products plant
b) Petrochemical-plant probably producing phenol,
synthetic alcohol, and possibly polyethylene
(c) Heat and power plant
(d) Possible organic solvents.plant
- 3 -
TOP SECRET CHESS RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
Hauls Via
TALENT-KEYHOLE
Csatrsl System Oily
'25X1D '
TO.P SECRET CHESS RUFF
CIA IMAGERY ANALYSIS DIVISION
TCS - 9461/65
PIR - 65017
b. Construction activity and changes at the refinery from
25X1 D
25X1 D
25X1 D
25X1 D
25X1 D
' 25X1 D
.1
I
TOP SECRET CHESS RUFF
25X1 D
25X1 D
25X1 D
25X1 D
include the following (annotation numbers
Several new POL tanks have been constructed in Annotation
5 since
Construction of a possible processing building in the
northern half of Annotation 7 was begun.prior to
An addition to an existing processing building along the
western side of Annotation 14 was constructed between
(4) Construction of the buriedopipeline (Annotation 22) connecting
Annotation 24 with the main refining area was begun after
A major portion of the pipeline construction
was completed by on the Most recent coverage
the eastern terminus of'the. pipeline is near
the tankcar loading and unloading facility in Annotation 6.
A number of POL tanks have been. constructed in Annotation
23 since in addition,' earth scarring in the
northern section of the-area indicates that additional
construction may take place.
(6) Construction of the facilities in Annotation 24 began
prior to with completion of most of-the POL
tanks an coo ng towers by. and" probable
completion.of several of the process ng buildings by
additional construction is currently
(7) Construction or refining area (Annotation 25)
began after-
3. All measurements have been made by the CIA/IAD/IB.project analyst.
The should be considered as approximate and must not be taken as official
NPIC mensuration data compiled by the Technical Intelligence Division, NPIC.
Handle Via
TALENT-KEYHOLE
Control System Only
Magill Via
TALENT?KETNOLE
Ceetrel System Oily
TOP SECRET CHESS RUFF
I
25X1 D
TCS - 9461/65
PIR - 65017
General Locator Map, USSR - 29656 1-61 (UNCLASSIFIED)
ACIC. US Air Target Chart, Series 200, Sheet 0325-2HL, 2nd Edition,
February 1964 (SECRET)
CIA. C-RR5-82,474
CIA/IAD PROJECT
30556-5
- 5 -