TASHKENT AIRFRAME PLANT CHKALOV NO. 84A AND 84B TASHKENT, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000500360041-6
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
10
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 13, 2001
Sequence Number: 
41
Case Number: 
Publication Date: 
January 1, 1965
Content Type: 
IR
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000500360041-6.pdf211.05 KB
Body: 
ILLEGIB Approved For Release 2001/03/07 : CIA-RDP78TO5439A000500360041-6 Approved For Release 2001/03/07 : CIA-RDP78TO5439A000500360041-6 Handle Via TOP SECRET CHESS RUFF TCS - 98 3/65 TALENT-KEYHOLE CIA/PIR - 65025 Control System Only TASHKENT AIRFRAME PLANT CHKALOV NO. 8'A AND 84B TASHKENT, USSR Tashkent Airframe Plants No. 84+A and 84B were first covered by photography 25X1 D 25X1 D additions to Plant 814B totaling floorspace. The auditions to Plant 84+B include a workshop (Item 13, Table 2, Figure 2), subassembly build- ingl(Item 14), and a storage building (Item 15). These additions, when completed, will bring the total floorspace of Plant 84D to square feet. Construction Data 25X1 D TOP SECRET CHESS RUFF 25X1 D dandle Via TALENT-KEYHOLE Control System Only Handle Via TOP SECRET CHESS RUFF 'mss - 9833/65 TALENT-KEYHOLE CIA/PIR - 65025 Control System Only 25X1D The facilities for Tashkent Airframe Plant 84A and 84B were moKed from 2X1 D Moscow - where they were reconstructed in the two-locations between. then Tables 1 and 2 contain the description and dimensions of all major build- ings comprising Tashkent Airframe Plant Chkalov No. 84A and 84B. All measure- ments have been made by the NPIC Technical Intelligence Division, with the exception of the height of those buildings marked with an asterisk. Those measurements were made by the CIA/IAD project analyst. They should be considered as approximate and must be taken as official NPIC mensuration data.. The NPIC/TID measurements are considered to be accurate within (horizontal)? 5 feet or t 5 per- cent,(vertical) t 10 feet or ? 10 percent, whichever is greater. The two plants 84A and 84B contain approximately 4,600 and 16,500 feet of hard-surfaced roads probably concrete with an average width of 20 feet. The plants are encompassed by a probable masonary fence totaling approximately 5,700 and 21,000 feet, respectively (Figure 1 and 2). A probable wire fence total- ing approximately 30,000 feet encompasses the new flyaway airfield. Plant 84B and the new airfield area are served by approximately 24,000 linear feet of rail -spurs. The new 8,285 x 230 feet concrete runway located 2.5 nm east of plant 84B serves as a test and flyaway aifrield for the plant. This airfield was completed 25X1 [)between The old airfield has been reduced in length, and is now a 3,000 x 210 feet concrete runway. There are approximately 1,894,650 square feet of concrete taxiways.and parking aprons for the pla.nt-ead airfields. 2 - Handle Via TALENT-KEYHOLE TOP SECRET CHESS RUFF Control System Only 25X1 D Approved For Release 2001/03/07 : CIA-RDP78TO5439A000500360041-6 Approved For Release 2001/03/07 : CIA-RDP78TO5439A000500360041-6 Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF TASI LVT AIRFRAME PLANT NO. 84A 41 19 33N - 69 15 54+E ITEM DESCRIPTION 1 Assembly/Machine Shop 2 -Workshop/Machine Shop 3 Workshop/Machine Shop *t Workshop/Machine Shop *5 Workshop/Machine Shop *6 Foundry *7 Warehouse -*-8 Workshop/Machine Shop *9 Workshop *10 Workshop *11 Workshop 12 Workshop 13 Storage/Support Buildings 25X1 D Total floorspace and volume of numbered build- ings Total floorspace and volume of storage/Support * Measurements were made by the CIA/IAD-project analyst. TOP SECRET CHESS RUFF TCS - 9833/65 CIA/PIR - 65025 25X1 D Handlc Via TALENT-KEYHOLE Control System Only 25X1 D 25X1 D Approved For Release 2001/03/07 : CIA-RDP78TO5439A000500360041-6 Approved For Release 2001/03/07 : CIA-RDP78TO5439A000500360041-6 Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF TASHKENT AIRFRAME PLANT NO. 84B 41 18 15N - 69 18 45E 25X1 D ITEM DESCRIPTION 1 Final Assembly Hall 2 Subassembly Section 3 Workshop/Machine Shop *4 Repair Hangar 5 Workshop 6 - Warehouse 7 Workshop/Machine Shop 8 Subassembly/Machine Shop 9 Workshop 10 Hangar 11 Warehouse 12 Warehouse 13 - Workshop 14 Subassembly Bldg. 15 Storage Bldg. 16 Fuel Storage/ e 1 T , yp Blending Control Station 25X1D 25X1 D Total Floorspace and Volume of numbered Build- ings Total Floorspa.ce and Volume of Storage type buildings - TOTAL Floorspace and Volume of Plant B * Measurements were made by the CIA/IAD project analyst. TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control System Only 25X1 D Approved For Release 2001/03/07 : CIA-RDP78TO5439A000500360041-6 Approved For Release 2001/03/07 : CIA-RDP78TO5439A000500360041-6 Tcs - 9833/65 Hahdie Via TOP SECRET CHESS RUFF CIA/PIR - 65025 TALENT-KEYHOLE Control System Only GL 0 25X1 D U.S. Air Target Chart, Series 200, Sheet 0328-17AL, 2nd Ed., May 61, Scale 1:200,000 (SECRET) CUMENTS 1. CIA/PT-R-21/61+, August 64 (TOP SECRET CHESS RUFF) 2. HTA-M 42/57, October 57 (TOP SECRET CHESS) CIA. C-RR5-82,765 cu/ID PROJECT 'TOR SECRET CHESS RUFF Haedlc Via TALENT-KEYHOLE Control System Oniy