SOUTHEAST CHINA SITUATION

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05694A000200490001-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
May 11, 2005
Sequence Number: 
1
Case Number: 
Publication Date: 
September 23, 1955
Content Type: 
IM
File: 
AttachmentSize
PDF icon CIA-RDP78T05694A000200490001-3.pdf455.72 KB
Body: 
Approved For Release 2005/06/b'p 78TO5694A000200490001-3 PiTOTO LLTQJ ICE 11 LIO 1P7DU 4 SOUTHEAST CHINA SITUATION GP/I - 126 (Project 71.174) 23 September 1955 DECLASS REVIEW by NIMA/DOD date ,~d i)EXED CODED C.r_:^KED -1 RELEASED CENTRAL ) TELLIGGCE AGEtNCY Office of Research and Reports 25X1 Approved For Release 2005/06/08 : CIA-RDP78TO5694A000200490001-3 Approved For Release 2005,06JO&CI,A DP78TO5694A000200490001-3 W11-126 23 September 1955 PHOTOI L GTNCT' M iCYr 1NDU SOUTB'r,AST CHINA SITUATION This memorandum is intended to summarize the photo intelligence con- tamed in aerial -photography taken between Items of specific interest include airfields, roads, defenses and railroads, AIRFL LDS Ch: ~7Ca ,(21,91170N LV035 ? LO: All construction equipment and materials have been removed fraan the vicinity of the runway. An additional. hanger has been located in the north aircraft revetment area facing the taxiway. 'A revetted ammunition storage building has been cones. structed in the vicinity of the warehouse area located 1500 feet south of the control tts-rer. Installation of a landing light system was underway on both sides and ends of the runway. The lights will be spaced approxi- mately 150 feet apart. Six pole antennas have been located in the vicinity of the Inner Beacon of the Bean Approach Landing System described and located in C'/I.122. A berried cable connects these antennas with the beacon installations Chi pro '3? N 117032' ~) : *ork was progressing on the runway and taxi strips. Construction work also continued on the barracks and 'buildings in the area south of the west and of the runway. -jjgU_ Nortast3?26? p 1160e:~?? : Construction work was continuing on the support buildings at the airfield. Subsurface ground cam- munication lines are being, installed. The runways showed no change? 1 :1 25X1 D Approved For Release 2005/06/08 : CIA-RDP78TO5694A000200490001-3 Approved For Release 2005/06/0 Little chan ?e noted since issuance of &F/1-1C 3. All sheds have been removed from the rummy- area ;3 probable radio station has been located on the south edge of the runway. This installation consists of two still antennas with buried cables leading to a cluster of buildinCs. 9q ?j J: Surfacing was still being, undertaken on the rum-my. The last coverage revealed snail white rectang..ar objects scattered on a black base,, PF. I.F. of the ru;ney a new barracks area is under construction. This area consists of 14 perrrrinent type bui.ldint s ringed by a new road with good access to the airfield. Construction of a draina:;_e system was in progress. Ch a ? _ 2ryop~ ~Tu '~. ?~o~ R ~,a, The airfield was still inactive. Coverage. of vealcd several trucks near the north bridge and road leadin ; to the airfield. Five tents were also noted on or near the runway. Incomplete coverage of the airfield on 0 field. showed 65 NItzml5's and two propeller driven planes on the There did not appear to be any I-M..17 ?s on the photography. DEF iSES Very little than ?e was noted. The base of the causeway connecting Amoy Island with the mainland was still being built up to prevent the erosion of the road. ,la,: Active construction of defensive installations was rtont uing. newly occupied artillery and anti-aircraft positions Approved For Release 2005/06 25X1 25X1 D 25X1 Approved For Release 2005/06/08 : pIA-RDP74T05694A000200490001-3 were located, A 1arg amount of recently constructed trench works and barrack type buildings was noted. There was no clang e in the road network since the GP/1?127 will give a detailed report of the Pehlirt,, situation, iiOAAS IN[) RIILRUADS a, , Very little change has been noticed in the road situation, with no new road construction located, I -. aagla: Active construction on the Chekiant-Man .si railroad to .Amoy via Isanping was revealed on hoto;Yraphy. This photography covered approximately 175 males of the line .from Doing--t se (27?35'c -- 11 ?14I'L) via Sbaowu and ohun-chang to just south of Hsia.Yar:ng (26?~'i?7'I4 m 117?59'E)a Three tunnels and a telephone line appear to be under construction alon,M the rail line. For details of this railroad construction refer to GP/:1-125 dated 21 September 1955a SHIPPING ? wE }: Ship activity appeared to be active. photography showed a 3.208 cargo ship and 12 m 7.51 patrol, crafts in the area. Three of the patrol crafts were out of the Crater on narino railvrays, on a 250' oil tanker was located off the old P,U,L, stora{;e site opposite 1fa rtes, -3 -I* 25X1 25X1 D 25X1 D 25X1 D 25X1 Approved For Release 2005/06 - P78T05694A000200490001-3