SIMILAR CONSTRUCTION ACTIVITY MISSILE TEST CENTERS, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05929A000900010004-7
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
October 6, 2006
Sequence Number: 
4
Case Number: 
Publication Date: 
April 4, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05929A000900010004-7.pdf214.08 KB
Body: 
Approved For ReleaT 7 26 25 April 19-65 Page - SIMILAR CONSTRUCTION ACTIVITY MISSILE TEST CENTERS, USSR 1. KAPUSTIN YAR/VLADIMIROVKA MISSILE TEST CENTER. THIS MISSION REVEALS NEW UNIDENTIFIED CONSTRUCTION ACTIVITY LOCATED APPROXIMATELY 0.5 NM NORTH OF THE FORMER ROCKET LAUNCH COMPLEX. THIS ACTIVITY WAS NOT PRESENT ON II RAIL TRANSLOADING FACILITY WHICH FORMERLY SERVED THE ROCKET LAUNCH COMPLEX. THE CONSTRUCTION ACTIVITY CONSISTS OF A GEOMETRIC CON- FIGURATION OF EXCAVATIONS, DITCHES, AND SCARS. THE LONGEST LINE, CONSIDERED TO BE THE BASE LINE, HAS A NE/SW ORIENTATION. A DITCH SCAR APPROXIMATELY 1,550 FT LONG EXTENDS FROM EITHER SIDE OF THE BASE LINE FROM A POINT APPROXIMATELY 750 FT FROM THE NE END. EACH DITCH/SCAR IS LAID OUT AT THE SAME ANGLE, APPROXIMATELY 65?, FROM THE BASE LINE. AT THE NE END OF THE BASE LINE THERE IS A SQUARE PATTERN MEASURING APPROXIMATELY 300 FT ON A SIDE WITH CIRCULAR EX- CAVATIONS AT EACH CORNER AND IN THE CENTER. THE CORNER-TO-CORNER DISTANCE IS APPROXIMATELY 430 FT. THERE ARE AT LEAST FOUR STRUCTURES UNDER CONSTRUCTION ADJACENT TO THE BASE LINE. )e':_I a ss P evi _:a N1i; ] These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the reporting period as indicated by the date of issue. Approved For Release 209th/10fU JI-R DP78T05929A000900010004-7 Approv TOP SECRET April 19&5- Page 2. TYURATAM MISSILE TEST CENTER, USSR. THIS MISSION REVEALS NEW UNIDENTIFIED CONSTRUCTION ACTIVITY IS OBSERVED 1.5 NM SW OF THE PROPELLANT PRODUCTION PLANT. THIS THE ACTIVITY IS PARTIALLY FENCED AND A ROAD IS UNDER CONSTRUCTION TO CONNECT WITH THE MAIN ROAD SERVING THE RANGE- HEAD. AT PRESENT, THE ACTIVITY CONSISTS OF A GEOMETRIC CONFIGURA- TION OF DITCHING AND EXCAVATIONS. A 1,700 FT DITCH, CONSIDERED TO BE A BASELINE, IS ORIENTED ON A NW/SE AZIMUTH. A DITCH, APPROXIMATELY 1,500 FT LONG EXTENDS FROM EITHER SIDE OF THE BASE LINE AT A POINT 750 FT FROM THE NW END. EACH DITCH IS LAID OUT AT THE SAME ANGLE, APPROXIMATELY 65 DEGREES., FROM THE BASE LINE. THERE IS PLUS CON- FIGURED DITCHING AT THE NW EXTREMITY OF THE BASE LINE. THE LENGTH OF THESE DITCHES IS APPROXIMATELY 430 FT. THERE ARE AT LEAST 3 STRUCTURES UNDER CONSTRUCTION ADJACENT TO THE BASE LINE. (THIS INFORMATION IS BASED ON INTERPRETATION LTHOUGH GRAPHIC DEPICTED IS These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the reporting period as indicated by the date of issue. TOP SECRET Approved For Release 2006/10/06: CIA- I - For Release 2006/10/06: C - 05929AO00900010004-7 For 25 25 25 25 MISSILE TEST CENTERS, USSR KAPUSTIN YAR/VLADIMIROVKA MISSILE TEST CENTER TYURATAM MISSILE TEST CENTER SIMILAR CONSTRUCTION ACTIVITY 25X 25X W COMPLEX J TYURATAM MISSILE TEST CENTER, USSR 45-54N 63-16E a_ ~_ POAO TO LAUNCH COMPLES A R " ~ (COMPIETE~~ 25% ENLARGEMENT Appf For Release 2006/10/06: CIA-R?P78T05929A000900010004-7 Approved For Release 2006/10/06: CIA-RDP78TO5929AO00900010004-7 Approved For Release 2006/10/06: CIA-RDP78TO5929AO00900010004-7