BRIEFING BOARD HIGHLIGHTS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05929A001100160002-0
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
1
Document Creation Date:
December 28, 2016
Document Release Date:
October 4, 2006
Sequence Number:
2
Case Number:
Publication Date:
August 30, 1965
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 39.24 KB |
Body:
App
30 A. 19 5
Page
Copy (o
BRIEFING BOARD HIGHLIGHTS
LAUNCH COMPLEX "J", TYURATAM MISSILE TEST CENTER,
CONSTRUCTION CONTINUES AT THE COMPLEX. THE EXCAV_.
AT J2 APPEARS TO BE AT APPROXIMATELY THE SAME.DEP'
THE ONE AT J1. AN AREA OF UNIDENTIFIED CONSTRUCT=- S
LOCATED APPROXIMATEL.`_ 3.2 SSW OF THE ASSEMBLY/
OUT BUILDING.
AIRCRAFT ASSEMBLY PLANT 64, VORONEZH, USSR. FIVE FI DLER,
12 CAT/CUB, 3 POSSIBLE CAB AND ONE POSSIBLE CRATE :R OB-
SERVED AND CONSTRUCTION ACTIVITY CONTINUES WITHIN l
PLANT AREA.
KIPELOVO AIRFIELD, USSR. CONSTRUCTION CONTINUES
AIRFIELD. FIVE PROBABLE BEAR, ONE MEDIUM STRAIGHT-- G
AND ONE LIGHT STRAIGHT-WING AIRCRAFT ARE OBSERVED.
eC 53S
roved For Releamr 't
NM
These notes have been prepared for briefing purpnsec only and should not be used for detailed -
The- use should be restricted to the particular briefing boards; they were prepared for and must be cc
only for the reporting period as indicated by the date of issue.
6ROUr I
Excluded him uutomttlc
dowregreding TOP SECRET
-.-.A ro. 2Q06/10/04.:
work.
-:.i valid