AIRFIELD BIR HASANAH, EGYPT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05929A001300060002-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
September 8, 2006
Sequence Number: 
2
Case Number: 
Publication Date: 
December 28, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05929A001300060002-9.pdf112.92 KB
Body: 
Approved For Release 2006/09/10: CIA-RDP78TO5929AO01300060002-9 Approved For Release 2006/09/10: CIA-RDP78T05929A001300060002-9 Appro~ ed For Release ".r cjl~ AiylI -RDP78T05929A0013 060002-9 AIRFIELD BIR HASANAH, EGYPT 1. SIGNIFICANCE: NEWLY IDENTIFIED AIRFIELD IN EGYPT. 2. REMARKS: THIS IS THE SECOND MAJOR AIRFIELD CONSTRUCTED IN EGYPT DURING THE LAST YEAR. IT IS LOCATED 6o NM WEST OF THE ISRAELI BORDER AND 45 NM EAST OF THE SUEZ CANAL. THE OTHER AIRFIELD AT BANI SUWAYF, NOW NEARING COMPLETION, REPORTEDLY WILL BECOME A MILITARY BASE AT THE BEGINNING OF 1966. 3. LOCATION: ON SINAI PENINSULA, 24 NM SOUTHWEST OF BIR HASANAH. 4. FIRST IDENTIFICATION: 5. NEGATION DATE: 6. DIMENSIONS/SPECIFICATIONS: 10,600 X 140 FT NW/SE BLACKTOP RUNWAY. 7. MISSION READOUT: THIS MISSION REVEALS A 10,600 X 140 FT NW/SE SERVICEABLE BLACK- TOP RUNWAY WITH CONCRETE TOUCHDOWNS. A PARALLEL TAXIWAY WITH 2 END- CONNECTING LINKS, 3 CROSSOVER LINKS, 2 DISPERSAL AREAS EACH CONNECTED These notes hove been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the reporting period as indicated by the date of issue. GROUP 1 Excluded fram automatic In downgrading and declassification - ui k' t1i, ~ A nnrnvarl Fnr RelaacP 2flflAlfl911 fl Apprq 28 DECEMBER 1965 PAGE Z TO THE PARALLEL TAXIWAY BY SEMICIRCULAR TAXIWAYS, AND 2 PARKING APRONS ADJACENT TO THE PARALLEL TAXIWAY. FACILITIES INCLUDE A ROAD SERVED UNIDENTIFIED AREA UNDER CONSTRUCTION JUST OFF THE SOUTHWEST END OF THE RUNWAY. NO AIRCRAFT ARE OBSERVED. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing boar only for the reporting period as indicated by the date of issue. Approved For Release 2006/09/10 .::( 28 DECEMBER 1965 PREPARED BY: NPIC/CSD 7 - RAS/FEr/C; DISTRIBUTION: COPY 1 - 2 - 3,4 5- 6 - 8- 9- 10 - 11 - Director, NPIC Chief, CSD REF BB DIA Chief, IAD RB/CSD/NPIC TCO/ARMY, PAG, (Att~ TCO/NAVY, File s/SBS/I-C$]Z I) _~_nuso not?s have been prepared for briefing purposes only and should not be used for detailed analytical work. n?ir use shou;d be restricted to the particular briefing board(s) they were prepared for one n. st be considered valid .,..,/ or the reporting period as indicated by the dote of issue. TOP SECRETI I AIRFIELD BIR HASANAH, EGYPT 30-12N 33-26E F'