MISSILE TEST CENTER SHUANG-CHENG-TZU, CHINA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05929A001300130007-6
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
3
Document Creation Date:
December 28, 2016
Document Release Date:
November 27, 2006
Sequence Number:
7
Case Number:
Publication Date:
January 3, 1966
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 250.28 KB |
Body:
Apps
oved For ReIT
2Se4J~
6
anuary 19
.3 1
Page/
1. SIGNIFICANCE:
2. REMARKS:
MISSILE TEST CENTER
SHUANG-CHENG-TZU, CHINA
SEVERAL PIECES OF EQUIPMENT, INCLUDING A PROBABLE
MISSILE TRANSPORTER, ARE ON PAD A-1
II
RAIL LINE TO LAUNCH COMPLEX B; AT THE END OF THE
NORTH S JR IS A PROBABLE LAUT,JH POSITION UNDER CON-
STRUCTION AND A SECOND LALMCh _T TON WILL POSSIBLY
BE CONSTRUCTED AT THE END OF THE Svc ' SPUR.
FACILITIES INCLUDE 3 INSTRUMENTED SSM LAUNCH
COMPLEXES (ORIENTED WEST), ONE OF WHICH HAS NEVER
BEEN COMPLETED; INSTRUME17f F * 6AM LAUNCH FACILITIES
(ORIENTED EAST); A LARGE MAIN SUPPORT BASE; A SUPPORT
AREA IN IMMEDIATE SUPPORT OF THE SAM LAUNCH FACIL-
ITIES; AN ASSEMBLY AND CHECKOUT AREA; AND TWO
REVETTED STORAGE AREAS.. AN SA-2 SAM SITE IS DE-
PLOYED AT THE APPROXIMATE MIDPOINT OF THE MISSILE
TEST CENTER.
3. LOCATION: APPROXIMATELY 50 NM NORTHEAST OF SHUANG-CHENG-TZU
AT 4107N 10020E.
These notes have been prepared for briefing purposes only and should not be __b:. o aetailed analytical work.
Their use should be restricted to the particular briefing :,oord(s) they were prepared +o; one ..st be considered valid
only for the reporting period as indicated by the date of issue.
TOP SECRET
ApprTed For 107
3 January 1966
NO ACTIVITY WAS OBSERVED THER4
I A TURNING WYE
IS UNDER CONSTRUCTION ON THE WEST SIDE OF THE RAIL LINE AT A POINT
SOUTH OF THE ACCESS ROAD TO LAUNCH COMPLEX A.
THE PREVIOUSLY REPORTED RAIL LINE UNDER CONSTRUCTION TO THE SSM
LAUNCH FACILITIES HAS NOT BEEN EXTENDED BEYOND THE POINT REPORTED ON
HOWEVER, 2 RAIL SPURS HAVE BEEN EXTENDED
FROM THE RAIL LINE TO LAUNCH COMPLEX B AND GENERALLY PARALLEL THE ACCESS
ROAD. THE ONE ON THE NORTH SIDE OF THE ACCESS ROAD APPEARS COMP ELE, AND
THE ONE ON THE SOUTH SIDE OF THE ACCESS ROAD IS STILL UNDER CONSTRUCTION.
AT THE END OF THE NORTH SPUR IS A PROBABLE LAUNCH POSITION UNDER
CONSTRUCTION. THE SOUTH SPUR TERMINATES AT THE ABANDONED EXCAVATIONS
WHERE A SECOND LAUNCH POSITION WILL POSSIBLY BE CONSTRUCTED.
1+. COLLATERAL/COMINT: NONE
5. FIRST IDENTIFICATION:
6. NEGATION DATE:
7. SUBSEQUENT COVERAGE: FOUFL___JAND 36 KH MISSIONS.
8. DIMENSIONS
SPECIFICATIONS: NOT APPLICABLE.
9. MISSION READOUT: THIS MISSION REVEALS SEVERAL PIECES OF EQUIPMENT,
INCLUDING A PROBABLE MISSILE TRANSPORTER, ON PAD A-1
These notes have been prepared for briefing purposes only and should not be used for detailed analytical work.
Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered vakc
only for the reporting period as indicated by the date of issu
41-07N 100-20E
F EET(APPROX) r t p}A{
Approved For Release 2006/11/27: CIA-RDP78TO5929AO01300130007r-9
NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
MISSILE TEST CENTER
SHUANG-CHENG-TZU, CHINA
t.
^
1
111 k, 111:4 ^ all" 9
25X1
25X1
25X1