FINAL ASSEMBLY AND CHECKOUT AREA, LAUNCH COMPLEX C KAPUSTIN YAR/VLADIMIROVKA MISSILE TEST CENTER USSR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05929A002500050021-6
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
4
Document Creation Date:
December 28, 2016
Document Release Date:
November 20, 2006
Sequence Number:
21
Case Number:
Publication Date:
June 5, 1967
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 220.66 KB |
Body:
Approved For Release 2006/11/20 : - DP78TO5929AO02500050021-6
TOP SECRET
(c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
Attachment t
5 June 1967
Page 1
Copy 58
REFERENCE:
1. SIGNIFICANCE:
2, LOCATION:
3. REMARKS:
4, COLLATERAL:
5. FIRST IDENTIFICATION:
6. NEGATION DATE:
FINAL ASSEMBLY AND CHECKOUT AREA, LAUNCH COMPLEX C
VLADIMIROVKA MISSILE TEST CENTER
A PROBABLE MISSILE IS OBSERVED ON THE PAD BETWEEN
THE LARGE CHECKOUT BUILDINGS.
LAUNCH COMPLEX "C" IS LOCATED 21 NM EAST OF KAPUSTIN
YAR, THE FINAL ASSEMBLY AND CHECKOUT AREA IS
LOCATED 1,5 NM WEST OF THE COMPLEX "C" OPERATIONS
7. SUBSEQUENT COVERAGE: 1 TALENT, 27 KH-4 AND 9 KH-7 MISSIONS.
8. DIMENSIONS/
SPECIFICATIONS: A. PROBABLE MISSILE:
These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use
should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re-
porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support
Division, NPIC.
GROUP 1
E.:1.4.1 ,...
L din0 e.d d~.l... il:ca -
TOP SECRET
25X1
25X1
Approved For Release 2006/11/20: CIA-RDP78TO5929AO02500050021-6
pproved For Release 2006/11/20: CIA-RDP78TO5929AO02500050021-6
TOP SECRET
(c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
Attachment to
5 June 1967
Page 2
Copy
9. MISSION READOUT: A PROBABLE MISSILE MEASURING
BEING HANDLED BY A CRANE ON THE PAD BETWEEN THE LARGE CHECKOUT BUILD-
INGS. THE NEW BUILDING IN THE NE CORNER OF THE AREA IS NEARING
COMPLETION AND MEASUREMENTS ON THIS BUILDING GIVE A LENGTH OF
0
ALSO PARKED ON THE HARDSTAND IN THE AREA ARE AN EMPTY SS-4
TRANSPORTER, THE CHASSIS OF A PROBABLE SS-2 TRANSPORTER-ERECTOR, 2
TRUCKS, AND AT LEAST 2 UNIDENTIFIED VEHICLES/PIECES OF EQUIPMENT.
25X1
25X1
These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use
should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re-
porting period as indicated by the date of issue. For information rnncernino these nntac rnntart Chief cnnarorai cj??nrr
Division, NPIC. --~
TOP SECRE
Approved For Release 2006/11/20: CIA-RDP78TO5929AO02500050021-6
WA roved For Release 200T%i 5',ERr05929A002500050021-6
FI AL ASSEMBLY AND CHECKOUT AREA, LAUNCH COMPLEX C
KAPUSTIN YAR/VLADIMIROVKA MISSILE TEST CENTER, USSR
48-36N 46-13E
Approved For Release 2006/11/20: CIA-RDP78T05929A002500050021-6
Approved For Release 2006/11/20: CIA-RDP78TO5929AO02500050021-6
Approved For Release 2006/11/20: CIA-RDP78TO5929AO02500050021-6