ABM LAUNCH COMPLEX E24 MOSKVA, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05929A002600030004-6
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 20, 2006
Sequence Number: 
4
Case Number: 
Publication Date: 
June 16, 1967
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05929A002600030004-6.pdf178.27 KB
Body: 
Approved For Release 2006/11/20 : CIA-RDP78TO5929AOO 4-6 c) TOP SECRET 2X Attachment t 25X 1 June 19b7 PageC 1 Copy) 8 ABM LAUNCH COMPLEX E24 MOSKVA, USSR THE CONFIRMATION OF GALOSH LAUNCHER/ERECTORS AT THE LAUNCH POSITIONS OF TRIAD 1 AND THE CONTINUITIG CONSTRUCTION OF TRIAD 2. 4. COLLATERAL: FIRST IDENTIFICATION: o. NEGATION DATE: 7. SUBSEQUENT COVERAGE: 8. DIMENSIONS/ SPECIFICATIONS: HEIGHT: 30 FT. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re porting period as indicated by the date of issue. For information concerning these notes contact Chief. Collateral Support Division, NPIC. For Release 2003/11/20: CIA-RDP Iop5?ff 1 II Attachment to 25X 1 June 19 7 WI DTH:I 9. MISSION READOUT: AT TRIAD 1, THE PRESENCE OF A GALOSH LAUNCHER ERECTOR AT EACH OF THE 8 LAUNCH POSITIONS IS NOW CONFIRMED. THE LAUNCHERS/ ERECTORS APPEAR TO BE COMPLETE BUT ARE UNOCCUPIED AT THIS TIME. THE MECHANISMS ARE ROTATED IN SEVERAL AZIMUTHAL POSITIONS. WHAT APPEARS TO BE LANDSCAPING OF A SMALL AREA HAS TAKEN PLACE ADJACENT TO BUILDING C. AT TRIAD 2, ASSEMBLY OF THE FIRST SECTIONS OF THE RADOMES ON THE GROUND ADJACENT TO BUILDINGS A, B, AND C APPEARS TO BE COMPLETE. IN ADDITION, THE CAPPING SECTION FOR THE BUILDING B RADOME HAS BEEN BROUGHT IN AND HAS BEEN PLACED WITHIN THE RADOR'E SECTION, PROBABLY FOR STORAGE. AN IRREGULARLY SHAPED STRUCTURE IS PRESENT WITHIN THE CIRCULAR BASES FOR THE RADOMES ON BUILDINGS B AND C. THE STRUCTURE, AS MEASURED ON BUILDING C. IS APPROXIMATELY 30 FT HIGH AND APPROXIMATELY IT WHAT IS POSSIBLY ITS WIDEST POINT. IT 25 APPEARS TO TAPER TO A NARROWER, ALTHOUGH UNDETERMINED, WIDTH AT ITS BASE. WHEN VIEWED FROM A SLIGHTLY DIFFERENT PERSPECTIVE, THE STRUCTURES APPEAR TO HAVE AT LEAST 3 POSSIBLE PROJECTIONS DISCERNIBLE ON THE MAIN STRUCTURE NEAR THE TOP. THE PROJECTIONS HAVE A WIDTH OF APPROXIMATELY 10 FT BUT THE EXACT SHAPE CANNOT BE DETERMINED. IT CANNOT BE ESTABLISHED AT THIS TIME WHETHER These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. Approve' 1i20 : cia RDPTOPSSECRET6 -1 -1 Attachment to 25X 1 June 19 7 THESE STRUCTURES ARE EITHER COMPLETE OR PARTIALLY ASSEMBLED ANTENNAS, OR IF THEY ARE ONLY THE MOUNTS FOR ANTENNAS WHICH HAVE YET TO BE INSTALLED. THE INSIDE DIAMETER OF THE CIRCULAR BASE FOR THE RADOME IS APPROXIMATELY THE MAXIMUM DIAMETER OF THE RADOME SECTION ON THE GROUND ADJACENT TO 25X BUILDING "C" IS APPROXIMATELY THE HEIGHT OF A COMPLETED RADOME, ON 25X BUILDINGS "B" AND "C" IN TRIAD 1, IS APPROXIMATELII CONSTRUCTION OF 25X LAUNCH POSITIONS DOES NOT APPEAR TO HAVE STARTED IN THE TRIAD 2 AREA. A BUILDING, APPROXIMATELY 155 X 115 FT, IS UNDER CONSTRUCTION ADJACENT TO THE T-SHAPED EARTH MOUNDED BUILDING. IT APPEARS THAT THIS BUILDING MAY BE DIVID- ED INTO APPROXIMATELY 20 FT WIDE COMPARTMENTS ALONG ITS MAJOR DIMENSION. SOME ADDITIONAL CONSTRUCTION ACTIVITY IS UNDERWAY IN A WOODED AREA ON THE OPPOSITE SIDE OF THE ENTRANCE ROAD TO THE COMPLEX. IN THE SUPPORT AREA, OUT OF A TOTAL OF 11 MULTISTORY APARTMENT TYPE BUILDINGS, 9 APPEAR TO BE EXTERNALLY COMPLETE AND 2 ARE IN THE MID-STAGE OF CONSTRUCTION. NO MISSILES ARE IDENTI- FIED WITHIN THE COMPLEX. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing hoard(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support For Release 2 00611 1 12 0: CIA-PiffNTF HM9T8iUM4-6 ABM LAUNCH COMPLEX E24 MOSKVA, USSR 55-21N 36-29E HAI