BUDGET ESTIMATES, FISCAL YEAR 1951
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP79-00265A000300070004-8
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
13
Document Creation Date:
December 20, 2016
Document Release Date:
April 4, 2008
Sequence Number:
4
Case Number:
Publication Date:
June 14, 1949
Content Type:
REGULATION
File:
Attachment | Size |
---|---|
![]() | 675.18 KB |
Body:
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
WIPM
CENTRAL INTELLIGENCE AGENCY
Washington, D. C.
114 June 19149
SUBJECT: Budget Estimates, Fiscal Year 1951
1. Basic information concerning call for estimates
a. General: Budget estimates of funds needed to meet CIA
requirements for the fiscal year 1951 (1 July 1950 - 30 June 1951)
will be submitted by each Assistant Director and Staff Chief to
reach the Budget Officer as soon as possible, but no later than
15 July 19149. As used in this no ce, t'OfMcelv shall mean a major
organza onal segment (such as office or staff section) and .
activity shall refer to a principal part within the office which
because of its character justifies an individual statement of its
functions and requirements within the office estimate.
b. Liaison with Budget Offices Assigned budget analysts will
advise and assist operating o c als and administrative officers
with respect to problems of securing, consolidating, and presenting
requirements throughout the period of estimate preparation,
c. Coverages The following-breakdown shall be observed in
preparing the a timates for both vouchered and unvouchered funds:
(1) Departmental
(3) Foreign field
(14) Each specific major project, in process or proposed,
indicating objectives and fields of work or types of service
(other than 1, 2, and 3 above).
d. Form of presentations Budget estimates shall be submitted
in duplicate in separate o ders. Presentation of the subject
matter shall be lengthwise on letter-size paper with at least a
one-inch margin on the left for binding purposes. Personal services
estimates shall be presented on CIA Form 32-16 and non-personal
services estimates shall be presented on CIA Form 32-17. Supplies
of these forms will be provided by the budget analyst assigned to
the respective offices.
2. Elements of budget estimates
a. Graphic representation exhibits: Some material of this
nature will be required for a purpose of properly depicting
organizational structure and operational activities. However, in
order to prevent unnecessary duplication of existing material, the
Budget Office will discuss requirements with offices on an individ utl
basis.
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
b. Office general state "Lnclude the following:
(1) Statement of Functions and Activities of the office.
(2) Statement of Coordination indicating-operating relation-
ships between the office and other units of CIA and/or between
the office and other governmental agencies.
(3) Statement of Accomplishments indicating method of ac-
complishmen and using, where practical, work load measurement.
(4) Statement of Objectives, actual or proposed, indicating
need for and value of the services or product. The necessity of
the work should be demonstrated fully.
co Summary of budget estimates: CIA Form 32-15 (Appendix I) is
for the purpose of recapitulating a total requirements of the office.
Completion of the form is as follows:
Column "Organization Unit": Insert titles of activities
which compose office or staff section.
Column "Number of Positions": Insert total number of
positions requested for the budget year for each activity.
Indicate column total at bottom of page.
Columns ".AY" (Man Years) and "Amount": Leave blank.
Column 1102-09 Total": Insert sum of columns "02", "03",
etc. Indicate column total at bottom of page.
Column 1102", 1103", etc.: Insert individual object require-
ments for the respective activities. Indicate vertical column
totals at bottom of page,
Column ttUnvouchered": Insert unvouchered requirements for
each activity. Indicate column total at bottom of page.
d. Statcment of personal services requirements
(1) Activity description: On a separate page preceding the
personal services estimates for each activity within the offices,
a statement as to the activity shall be presented covering:
(a) Function
(b) Accomplishments
(c) Objectives for fiscal year 1951
(d) Justification
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
CONFIDLN : _AL
3. Details of budget preparation
a. Preparation of Form 32-16 "Personal Services Estimates":
CIA Form 32-16 "Personal Services Estimates" (Appendix shall
be used in preparing estimates of personnel requirements. Separate
sheets shall be used for each activity within the office. The same
forms shall be utilized for recapitulation of total office require-
ments. Instruction as to preparation of the form followst
(1) Heading: The heading (Office, Branch, Division,
Section) shall be completed so as to identify the organizational
unit for which estimates are submitted,
(2) "T/0 No." and "Operating Title"s Information for these
columns is to be constructed upon a ramework of the current
Table of organization. "T/0 No." refers to the number of
positions authorized in the current Table of Organization for
each operating title listed. "Operating Title" refers to the
position titles listed on the current Table of Organization,
plus new positions applicable to the Budget Year inserted where
appropriate. All new positions shall be asterisked to the left
of the operating title.
(3) Personnel requirements: (Classified personnel)
(a) The columns entitled VIN6.11 are to show the number
of positions for the appropriate year. The columns entitled
"Grade" are to show the appropriate grades of the positions
indicated under column headed "Operating Title". The columns
entitled "Type" are to show the nature of the appointment
(whether vouchered, unvouchered, military, on loan, temporary,
or part-time), "Type" terms may be abbreviated as:
V vouchered
W unvouchered
V-PT vouchered - part time
11 military
Vac vacancy
OnL on loan
(b) Column "Position Occupancy" (enter date prepared):
Show by number, grade and hype the positions on a curren
Table of Organization which are actually occupied as of the
preparation date, When various types apply to an individual
operating title, show as follows:
T/O Pos. Occupy 6/17/49
No. Operating Title No. Grade Type Notationg
9 Intelligence analyst 4 CAF-9 V
it It 2 " Ti
It it 1 it UV
GO*WNTN
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
OONFIOENTIAL
Where lower grade positions are encumbering higher grade
positions, they should be shown at the higher grade with
citation of lower grade encumbrance within "Notation"
column. Positions encumbered by personnel detailed to
other units should be similarly noted in the "Notation's
column (e.g.; E-CkF-3, "Encumbered by CAF-3"; D-Class.Sec.,
"Detailed to Classification Section'),
(c) Column "CY (Current Year) Estimates": Directly
based on the -current Table of organization, show by number,
grade, and type the positions which will be filled at some
time during the current year. (The term "current year"
refers to the fiscal year immediately preceding the "Budget
Year" for which estimates are being submitted.) Consideration
should be given to program plan requirements, pending assign-
ments, personnel actions in process, and a realistic approach
to recruiting possibilities considering the nature of present
vacancies.
(d) Column "BY (Budget Year) Estimates": Show by
number, grade, an type the positions which will be required
for operation during the Budget Year. The entire office
request should be consistent with the general statement of
objectives as detailed in the preliminary statement, and
activity requests should tie-in with the activity objectives
statement. Inasmuch as the BY Estimates column should
reflect actual requirements, obvious variations between the
current position occupancy and current Table of organization
may have important implications to Budget Year requirements.
Specifically, all "details" of personnel other than of
temporary nature from a Table of Organization location to
other locations on the basis of program requirements should
be studied in view of the desirability of adjusting such
situations by request for revision of the Table of Organiza-
tion (e.g., for an extensive period, five people assigned
to Section A of a particular Table of Organization working
in Section B. This would suggest the possible need for
revision of the Table of Organization placing the positions
where they are actually required.)
(14) Personnel requirements: (Unclassified personnel): The
statement of requirements for unclassified positions positions
which do not normally appear on the Table of Organization) shall
follow line totals of the requirements for classified positions
in the following order: W.A.E. (when actually employed);
Consultant (contract); and Native. Each category shall be
separately listed under the column "Operating Title". Specific
instructions are as follows;
,nl-,CI!W
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
CONFIDENM
(a) W.A.E. (when actually employed) and Consultant
(contract employees : Under "Personnel Requirements" use
only the "No." columns pertaining to each year. Under
Position Occupancy,' show number presently on duty; under
CY Estimates column, show reasonable estimate of any
changes anticipated; and under BY Estimates column, insert
best estimate of requirements,
(b) Native employment: Leave "'T/O No." blank. Enter
the title of each existing or anticipated position under
"Operating Title". Under "Position Occupancy" insert present
salary paid in the column headed "Grade". Report "Type"
similarly as for regular personnel. Under columns "CY
Estimates" and "BY Estimates" utilize oolumh "Grade" for
expected salaries to be paid and column "Type" as for
regular personnel.
(5) Justification: The justification column is for ex-
planations of any variations between the present Table of
Organization and the Budget Year estimates. All adjustments,
upward or downward, should be explained. In some cases a
number of positions can be adequately covered by the same
justification. Insofar as it is possible, justifications of
personal service changes should be prepared on the basis of
work measurements.
b. Non-personal Services Estimates, Form 32-17: CIA Forms
32-17 "Non-Personal Services Estimates" ppendix III) are provided
for the office in presenting non-personal services requirements.
Preparation of the form is largely self-evident. Separate series
of the forms shall be utilized for each non-personal service object
classification. The budget analyst assigned to a particular office
will have prepared for.the operating officials and administrative
officers certain background information as to office roquiromonts for
the past year for the various object classifications of expense which
will assist them in evaluating the estimates. In addition the
following detail information will prove helpful in the preparation of
estimates for non-personal services items:
(1) 02 - Travel
(a) Estimates for travel shall include transportation
costs.-per diem or subsistence during authorized travel
status, and other expenses incident to travel which are to
be paid by the Agency, either directly or by reimbursement,
to the traveler. A schedule of travel rates is attached
(Appendix IV) which includes cost elements of transportation,
per diem, etc., between Washington and major foreign and
domestic points.
CONFIDENTIAL
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
a UtW1K
(b) Dollar estimates should be based-upon the number
of trips to be performed to specific areas, and computed
at rates provided by the cost-of-travel schedule. Complete
justification must be furnished in the form of statements
of purpose for the anticipated travel to and within each
area.
(c) Estimates for employees transferring to installa-
tions outside of Washington shall be based upon amounts
shown upon the travel schedule. Cost of transportation and
per diem up to day of arrival for duty at such installation
are included in those rates.
(d) Cost of transportation and per diem for employees
officially stationed at locations outside of 1 7ashington,
and that of employees transferring from such locations to
Washington should be included in the estimates for travel sub-
mitted by or for such installations and shall be computed at
the estimated scheduled rates,
(e) 7ithin-area travel will be based upon an estimated
number of trips to be performed at rates per trip as estimated
by the individual Office or Staff Section and shall be supported
by a statement of purpose for travel within each area.
(f) In preparing estimates for travel in connection
with change of official station, consideration must be given
to possible travel of employee dependents.
(2) 03 - Transportation of Things
(a) Estimates for the transportation of things shall
include those charges which are paid or are to be paid
directly by the Government and-not by the vendor, whether
such transportation bo by land, air or water; as well as
charges for the care of such things while in process of
being transported. Such all-inclusive ostimates for the
transportation of things between Washington and various
foreign areas are scheduled on the attached rate sheet
(Appendix V).
(b) Costs involved in the transfer of stock material,
supplies and equipment issued to ='-.,11.' u~` on.^ in6i.ao or
outside the United States will be in tno estimates
of the Services Office.
(c) It will be the rosponsibility of the individual
Office or Staff Section to supply justification of trans-
portation costs incurred in the shipment of operational
supplies and equipment and household goods and personal
effects of employees.
Ii~FNtN~ W.
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
VIWII'9fl I I IAL
(3) 04 - Communications
(a) Estimates shall include costs of transmission of
messages from place"to place, such as tolls for land tele-
graph, marine cable, radio, wireless telegraph, and telephone
services, and postage. They shall also include switchboard
and service charges and telephone installation costs.
(b) Estimates for all charges in connection with
telephone service in Washington will be prepared by the
Services Office.
(c) Estimates for telephone service in field in-
stallations will be prepared jointly by the Office or Staff
Section concerned and the Services Office, and shall be
reported in the budget estimates submitted by the former.
(d) Estimates for telegram and cable costs and for '
special services such as teletype, facsimile, tolecrypton,
telemeter, direct wire, tie-lino service, etc., shall be
prepared and justified by the Office or Staff Section having
or desiring such service.
(4) 05 - Rents and Utility Services
(a) Estimates shall include charges-for rental of
space; for heat, light, power, water, gas, electricity, and
other utility services exclusive of transportation and
communication services.
(b) Rents and utilities estimates covering all utilities
and office and warehouse space for the Washington Area will
be prepared jointly by the Office or Staff Section concerned
and the Services Office, and shall be reported in the budget
estimates submitted by the former.
(c) Estimates for field offices shall be contained in
the estimates presented by or for those offices.
(d) Estimates for rental on a contract basis of special
equipment and/or business machines vrill be fully justified
and submitted by the Office or Staff Section concerned. The
justification will include a description of the machine or
equipment, the rental cost per period and the total estimated
cost for fiscal year 1951.
(5) 06 - Printing and Reproduction
(a) Estimates shall include printing of forms (including
standard forms) and letterheads, printing and binding of books,
pamphlets, documents, and other publications. Printed forms
and letterheads are included under this group.
IxOnL t1VThAl
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
Wr1rIUt IM
:Js'timatcs for printing; and/c )inding of forms,
stationery, and routine office supply items Will be made
by the Scrviccs Office.
(c) Special or unusual requirements for printing and
binding tirhicli cannot be handled 'c -,,r C.L. reproduction
facilities, such as the need for s ecial tolets'po paper and
multiple-lc-.fed forms, maps, etc., should be sot forth in
detail by each Office or staff Section, .ridicatinr; the typo
of publication or material, the estimates? number of items
or copies, the unit and total cost of each publication, and
the p---o-posed use of distribution.
(6) 07 _ O'tlior Con _ractual cervices
(a) rcquir.. u kits for resoarch and development work
and/or special services on a contract basis shall be
specifically stated and justifiod.
(b) stima;,os for photos rasp A.ng and reproduction services,
for advertising and publication of notices end for the mainten-
ance, alteration and repair of office buildings and ;rarahousc
facilities will be submitted by the Scrviccs Office.
(c) A;s'cim tcs for requirements of funds fr'r special
projects involving; other Government agencies and/or outside
concerns shall be stated by specific project costs, identify-
ing costs by object class in the sumo manner y,rescrib,.d for
the overall budget submission.
(d) estimates for additional .:protection service
furnished by the Public Buildings L .dministration upon a con-
tractual basis will be prepared jointly; by the Chief,
Inspection and Security, and Services Office and shall be
reported in the budget estimates submitted by the former.
(7) 0C - Supplies and Iiatcric.ls
(a) Lstimatcs for normal office supplies and materials
will be prepared by the Services Office in coordination with
the Lud0;ct Branch.
(b) 11'stimates for special supplies and materials py.:culicx
to specific operations will. be reported and justified by the
Office or Staff Section having such special requirements.
(8) 09 - Lauipmcnt
(a) :estimates for office equipment will be prepared by
the Services Office in coordination with the Ludgct Branch.
wwu"TIAI
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
CONFIDENTIAL
(b) 2stinates for operating equipment peculiar to
specific operations will be reported and justified by the
Office or Staff Section having such special requirements.
(c) estimates for purchase of motor vehicles shall be
supported by a full justification. '7 here replacement is
proposed, the explanation shall set forth tihe year., model,
and body type of the vehicles to be replaced, mileaCe, 'hind
of use, and other pertinent information. Inforration must
also be given as to the number of oli-. vehicles still to be
used and the estimated cost of maintenance and operation of
such vehicles.- here additional vehicles are to be acquired,
there shall be a clear statement of purposes for which they
;rill be used.
(9) 00 - Unvouclicred Funds
(a) :estimates for unvouchered (confidential) fun,1s
for the fiscal year 1951 should be submittcd and justified
on a project basis, as nearly as possible in the saue manner
as the Office or Staff Section estimates for vouchered funds.
(b) Justification for each project should include a
brief outline of -thc ,project, number of personnel, and
amounts of material and supplies, and there ;possible the
funds devoted to the operation durinu the past fiscal year,
and should be specific in regard to the forecast of personnel
and further requirements for fiscal year 1951.
c. ;/7rloyce Health Services : estimates for the cost of operating
the agency health program, including the coot of health rooms
operated by the agency for its employes (and employees of other
agencies, if any) v-rill be prepared jointly by the i.:odical ,;orvices
Division, Personnel Office, and the Budget Branch, Budget Office.
A. Budget Assistance in Preparation of the estimates.
Budget Analyst has been assigned to each major agency
organizational scgrient. The Analysts will assist Offices and Staff
Sections throughout the period of intra.-agency estimate preparation.
Operating officials may contact the a.-propria?to analyst in tiie Budget
Branch via extension 721.
FOAL 'ihE IP CTOR OF C i?`l'it?I, INT :LLIG; iICL
L. T. SFL.t; i
sting ~xocutivo
attachments (5)
Appendix I "Summary of Iadget stimates"
Ajppondi:: II "Personal Services Estimates"
Appendix III "i on-personal orvices hstimates"
Appondi_ IV 1102-Travolr'
Appendix V "03-Transportation of Things"
n T,STP.IBUTIf N ? A IXNTML
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
FORM NO. 12.15
JUN 1949
Organizational Unit
No. of
Pos,
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
Budget Year
For completion by
MY Amount
02 - 09
Total
(Office or Staff Section)
Summary of Budget Estimates
Fiscal Year 19
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
Total
Vouoher.d
Appendix I
Grand
Total
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
S A Y, P L E Appendix II
PERSO SR ~
OFFICE Intelligence Office
BRANCH Eastern Europe
DIVISION
SECTION
T
Personnel
Requirements
/
Operating
Pos. Occ
. =4
CY
Estim
ates
BY Estimates
No
Title
No.
Grade
Notations
No.
Grade
Type
W o.
ra a
Justification
1
ie, Intelligence
Specialist
1
P-7
M
It, Col.
Army
1
p-7
M
1
P-7
V
Agreement with Army covers Y
only. Civilian position for BY
1
Intelligence
Specialist
1
P-b
V
Enc-P-b
1
P-6
V
1
P-6
V
Intelligence
Specialist
-
-
-
-
-
-
1
P-5
UV
Position required for "X"Research
Program (new in BY)
1
Contact Specialist
1
P-3
OnL
From State
1
P-3
OnL
1
P-3
OnL
1
Administrative
Assistant
1
CAF-7
V
1
CAF-7
V
1
AF-7
V
2
Clerk-Stenographer
1
CAF-5
V
-"Y" Br.
1
CAF-5
V
1
CAF-5
V
Provision made in Y Branch
for detail
2
Clerk
2
CAF-4
V
CA F 1 CAF. -3
2
CAF-4
V
2
AF-4
V
-
* Clerk-Typist
-
-
-
-
-
-
1
CAF-3
V
Position required for
Research Program (new in BY)
5
Heavy truck driver
4
UG-9
V
5
UG-9
V
5
UG-9
V
12
11
12
14
Recapitulation "Type
)
Military
1
1
-
Vouchered
9
10
12
Unvoucnered
-
-
1
On Loan
1
1
1
Totals
11
12
14
(Unclassified Personni
Consultant (W. A. E.
l)
2
V
The Research program will
6
specialist in the subject an for
this purpose 2 W.A.E. positions
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8
Unit Cost
Motor Vehicles
Crating (includes freight to POE)
Per
V200.00
Vehicle
Shipping (POE to destination) ETO
It
275.00
LIEDTO
350.00
LATO
300.00
FETO
400.00
General Cargo (Delivery to addressee)
(Administrative supplies and equipment,
communications supplies and equipment,
and operational supplies and equipment)
ETO
Per
100.00
L DTO
Ton
100.00
LATO
it
75.00
FETO
100.00
Household Goods and Personal Effects
To POE (Based upon E.O. 9805 maximum weight
reimbursement allowances: Family,
7,000 lbs; single individual, 2,500 lbs)
350 mi.
Per
7.00
1,000 mi.
100 lbs.1
11.00
3,000 mi.
it
16,000
POE to destination ETO
Per Ton
100.00
MEDTO
"
100.00
LATO
75.00
FETO
100.00
Air Shipments ETO
Per lb.
1.50
IIEDTO
"
2.25
LATO
it
1.75
FETO
3.50
Approved For Release 2008/04/04: CIA-RDP79-00265A000300070004-8