ROAD DEVELOPMENT CHINA/NORTH VIETNAM BORDER AREA 1964 - JULY 1967

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79-00849A001000030005-5
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
March 9, 2006
Sequence Number: 
5
Case Number: 
Publication Date: 
September 13, 1967
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79-00849A001000030005-5.pdf87.86 KB
Body: 
25X1 proved For Release 2006/03/16 : CIA-RDP79-00849AO01000030005-5 006/03/16: CIA-RfeP9 ff 10000 005-5 (c) NATIONAL PHOTOGRAPHIC INTERPR 3791 13 SEPTEMBER 1967 PAGE 1 Cyr ROAD DEVELOPMENT CHINA/NORTH VIETNAM BORDER AREA 1964 - JULY 1967 NGA review(s) completed. THIS BRIEFING BOARD DEPICTS THE CONTINUAL DEVELOPMENT OF THE ROAD NETWORK IN THE CHINA/NORTH VIETNAM BORDER AREA FROM 1964 TO MID-1967. ROADS IN THE CHINA/LAOS BORDER AREA ARE INCLUDED BECAUSE OF THEIR INTERRELATIONSHIP GEOGRAPHICALLY, POLITICALLY, AND ECONOMI- CALLY. ALL ROADS UNDER CONSTRUCTION ARE HIGHLIGHTED. PHOTO INTERPRETATION REPORTS OF 1964 (REFERENCES A, B, AND C) AND OF 1966 (REFERENCE D) WERE USED AS A BASE FOR THE INTELLIGENCE AS DELINEATED ON THE BOARD. AERIAL PHOTOGRAPHY SUBSEQUENT TO AS USED TO 25X1 UPDATE, VERIFY, OR CORRECT THE ALIGNMENT OF THE BASIC ROAD DATA. NEW ROAD CONSTRUCTION OBSERVED IN CHINA APPEARS TO BE CONCENTRATED PRINCIPALLY IN THE PING-HSIANG/NING-MING AREAS. A NEW ROAD HAS RECENTLY BEEN COMPLETED CONNECTING LUNG-SHAN (2225N 10721E) AND CHUNG-SHAN (2225N 10721E). A ROAD IN AN EARLY-TO MID-STAGE OF CONSTRUCTION IS NEWLY OBSERVED EXTENDING FROM PING-HSIANG NORTHWEST TO 2214N 10643E WHERE IT BIFURCATES, AND SUBSEQUENTLY TERMINATES NEAR THE NORTH VIETNAMESE BORDER (ONE BRANCH AT 2215N 10642E AND THE OTHER AT 2216N 10643E). ONLY FIVE NM SEPARATE THESE TERMINAL POINTS FROM THE TERMINUS OF A ROAD CURRENTLY UNDER CONSTRUCTION FROM ROUTE 4 IN NORTH VIETNAM. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. TOP SECRET A 06/03/16: CIA-R O - U 1000030 05-5 TO NATIONAL PHOTOGRAPHIC INTERPRE ATION CENTER ATTACTHvIENT TO L-3791 13 SEPTEMBER 1967 PAGE 2 THIS ROAD RUNS FROM ROUTE 4 AT BAN NAM NU (2213N 10631E) EAST TO PO GIANH (221ON 10636E) AND THEN NORTH TO ITS PRESENT TERMINUS AT 2215N 10637E. WHEN THESE TWO ROAD SEGMENTS ARE CONNECTED THEY WILL PROVIDE A MORE DIRECT ROUTE BETWEEN PING-HSIANG, CHINA AND CAO BANG, NORTH VIETNAM. A NEW ROAD, IN AN EARLY TO MID-STAGE OF CONSTRUCTION, IS INTERMITTENTLY OBSERVED FROM SSU-LO, CHINA (2206N 10726E) SOUTH- SOUTHWEST TO ITS PRESENT TERMINUS AT 2145N 10712E (ONE NM FROM THE CHINA/NORTH VIETNAM BORDER AND ONLY THREE NM FROM THE PRESENT TERMINUS OF A ROAD UNDER CONSTRUCTION EXTENDING FROM THE HAI PRONG - HON GAI AREA). IN THE CHINA/LAOS BORDER AREA A NEW ROAD, IN THE MID-STAGES OF CONSTRUCTION AND GENERALLY PARALLELING THE BORDER, IS TO CONNECT THE MENG-LA/SSU-MAO ROAD (2152N 10122E) TO THE CHIANG-CHENG/SSU-MAO ROAD (2234N 10139E). SEVERAL AREAS OF MAJOR ROAD CONSTRUCTION ARE OBSERVED IN NORTH VIETNAM. CONSTRUCTION IS CONTINUING ON ROUTE 191 BETWEEN LAI CHAD (2204N 10309E) AND DIEN BIEN PHU (2123N 10301E) AND ON ROUTES 4, 132, AND 134. NO SIGNIFICANT ROAD CONSTRUCTION IS OBSERVED IN LAOS NEAR THE CHINA BORDER; HOWEVER, ROUTE 19 IS BEING EXTENDED SOUTHWEST FROM DIEN BIEN PHU, NORTH VIETNAM TOWARD THE NAM OU (RIVER) IN LAOS. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. Approved For Release 2006/03/16 : CIA-RDP79-00849A 01000030005-5 TOP SECRET App 006/03/16: CIA-F9 010000300 5-5 791 13 SEPTEMBER 1967 PAGE 3 B. STUDY OF ROADS CONNECTING LAOS WITH BURMA, CHINA, AND NORTH VIETNAM. 1B 165/64. 31 MARCH 1964 C. YUN-NAM PROVINCE ROAD STUDY IB 399/64. 03 NOVEMBER 1964 D. NORTH VIETNAM-SOUTH CHINA ROAD STUDY CIA/PIR 75057 NOVEMBER 1966. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must he considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. Approved For Release A-RDP79-00849A0~uuuuau??~~ TOP SECRETI