CONTINUED ROAD CONSTRUCTION LAI CHAU/DIEN BIEN PHU NORTH VIETNAM

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79-00849A001200030010-7
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
March 1, 2006
Sequence Number: 
10
Case Number: 
Publication Date: 
March 5, 1968
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79-00849A001200030010-7.pdf252.5 KB
Body: 
Approved For Release 20 efWFjVEN1tII P79-00849A001200030010-7 1 ATTACHMENT TO L-4889 5 MARCH 1968 PAGE 1 CONTINUED ROAD CONSTRUCTION LAI CHAU/DIEN BIEN PHU NORTH VIETNAM 1. SIGNIFICANCE: THIS BRIEFING BOARD DEPICTS CONTINUED CONSTRUCTION OF ROADS CONNECTING LAI CHAU AND DIEN BIEN PHU IN NORTH VIETNAM. 2. MISSION READOUT: INSERT #1, 2153N 103o8E, DEPICTS A NEWLY SURFACED SEGMENT OF ROUTE 191. INSERT #2, 2144N 10305E, DEPICTS A SEGMENT OF THE ROAD PRESENTLY BEING SURFACED. INSERT #3, 21344 10301E, SHOWS ONE OF SEVERAL BRIDGES UNDER CONSTRUCTION AT MAIN RIVER CROSSINGS ON ROUTE 191. A TELECOMMUNICATIONS LINE IS OB- SERVED AT THIS POINT PARALLEL TO ROUTE 191. INSERT #>+, 2123N 10300E, PORTRAYS THE USE OF FORDS FENDING COMPLETION OF THESE BRIDGES, AND THE JUNCTION OF ROUTE 191 AND ROUTE 19. 3. REMARKS: CONSTRUCTION OF THE NEW ROADS CONNECTING LAI CHAU AND DIEN BIEN PHU WILL BE COMPLETE WITH THE SURFACING OF THE FIVE REMAINING SEGMENTS OF ROUTE 191, COMPRISING TWELVE NM, THE COMPLETION OF SEVERAL BRIDGES ALONG THIS ROUTE, AND THE SURFACING OF SEVEN NM OF THE UNNUMBERED ROUTE SOUTH OF LAI CONSTRUCTION ACTIVITY ALONG ROUTE 191 AND AN FROM LAI CHAU TO CONNECT WITH ROUTE 191: These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER NGA review(s) completed. For P I si p 2n&Af&f F&I)FWITI b7a-nnRaannn-I2nn030010-7 25X1 Approved For Release 20 1 fD: P79-00849AO01200030010-7 ATTACPMENT TO L-4889 5 MARCH 1968 PAGE 2 CHAU. COMPLETION OF THESE ROADS WILL PROVIDE A LINK IN A NEW MAJOR LOGISTICAL SUPPLY ROUTE FROM THE CHINESE BORDER INTO LAOS. CHINESE AID TO NORTH VIETNAM'S ROAD CONSTRUCTION PROGRAM HAS BEEN CONCENTRATED IN THE AREA BOUNDED BY HA NOI, MONG CAI IN THE NORTHEAST, AND LAO CAI AND LAI CHAU IN THE NORTHWEST. THE MAJOR EFFORT HAS BEEN TO IMPROVE EXISTING HIGHWAY CONNECTIONGS WITH CHINA. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. Approved For Release E 1 - 030010-7 25X1 Approved For ReleakAp&QQ &IAlkc:lfi } 79rP0849AO012000300 0-7 CONTINUED ROAD CONSTRUCTION LAI CHAU/DIEN BIEN PHU NORTH VIETNAM 21-53N 103-08Ei -4T LAICHAU>, :1 25X1 ----- ROAD SURFACING SURFACING COMPLETE