CONTRACT INSPECTION REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP79B00873A000100010155-2
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
November 1, 2012
Sequence Number:
155
Case Number:
Publication Date:
December 13, 1969
Content Type:
FORM
File:
Attachment | Size |
---|---|
![]() | 114.9 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2012/11/01: CIA-RDP79B00873A000100010155-2
......._
CON
TR
.,
TASK NO.
..
C OtdTRACT IPISPECT
I UI REPORT
TO:
DATE
31 December 1969
INSPECTION REPORT NO. (If final, so state)
5
ESTIMATED COMPLETION DATE
31 December 1969
NAME OF CONTRACTOR
TYPE OF COMMODITY OR SERVICE
Imagery Interpretation Research Program
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
E
o
?
D
FUNDS ? YES O NO IF ANSWER IS "NO" ADVISE REC-
Y
N
S
OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON
?/
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD.
-
PER CENT OF WORK COMPLETED 6 O0/~o
DITIONAL FUNDS INVOLVED.
PER CENT OF FUNDS EXPENDED - 60%
.HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? ? YES ? No (If yes, give details on reverse side.)
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? C] YES NO
(If yes, indicate items, quantity, and cost on reverse side,)
INCENTIVES
IS THIS AN INCENTIVE CONTRACT IU YES 0 NO
NOTE:
IF YES. CHECK
TTYPE .
USE REVERSE SIDE FOR COMMENTS.
???s~
AWARD L] PERFORMANCE 0 DELIVERY
0 COST n
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
.
LJ FEE ...
( ~'-- 'OVERALL PERFORMANCE OF CONTRACTOR
1 ? OUTSTANDING 4-"- ? ABOVE AVERAGE 7. ? UNSATISFACTORY
2. a EXCELLENT :`--:-. S. AVERAGE_.. __ ...
: ...
-
.
.-
.
..,. -
;:.J
3. 1:1 VERY GOOD 6. ^ MINIMUM ACCEPTABLE
IF OVERALL PERFORMANCE OF CONTRACTOR ISM UNSATPSFACTORY OR MINIMUM ACCEPTABLE INDICATE?
REASONS ON REVERSE SIDE.
RECOMMENDED ACTION'
- - ,~ ,WITHHOLD PAYMENT PENDING.....
? CONTINUE.AS PROGRAMMED, - ?
-
'SATISFACTORY PERFORMANCE-
E OUT ? OTHER (S
ecif
)
p
y
CLOS
IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARR?ATIVEI.FORM ON CONTRACTOR'S PERFORMANCE
AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE
APPLICABLE. THE FOLLOWING:
ITEM
RECD
DOES NOT
-ITEM -
RECD
DOES NOT
APPLY
APPLY
PROTOTYPES' --
_'
MANUALS. -. ,
DRAWINGS AND SPECIFICATIONS
FINAL REPORT -~ -
-
PRODUCTION AND/OR OTHER
'
SPECIAL TOOLING
END ITEMS .
-
`~ -
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACTWITH CONTRACTOR' - .. - - - . '
30 December 1969,telephone conversation
SIGNATURE OF INSPECTOR
DIVISION
TSSG/RED/ATB
INSPEC
SIGNATURE OF APPROVER
FORM USE
,1.e, IRQ7 PREVIOUS I!M!`! ASSl~}6:n
(t21'r1'RG9T!A1 F 1 SF("r?FT (12.36!
Declassified in Part - Sanitized Copy Approved for Release 2012/11/01: CIA-RDP79B00873A000100010155-2
"ic~r ~r rlrni ~ntWTIt f~Imn.IA SSIFIED
Declassified in Part - Sanitized Copy Approved for Release 2012/11/01: CIA-RDP79B00873A000100010155-2
IdARR IVE REPORT INTERIM ^ FINAL
1 Phase'IT of this contract began on 24 November.1969.:,The current period
of performance extends through 23 August 1970.
'Technical redirection of some Phase IT tasks has been negotiated, and
a revised Technical Task Operating Plans document is to be issued shortly by
Boeing for our approval.
On 2 December 1969, Executive Director NPIC and Chief, TSSG along with
the technical representative visited facility. The results 25X1
of Phase I were reviewed as were plans for Phase II efforts.
Reports received during November and December included the following:
1. Mid-1970's Photointerpretation System Final Report (TS)
2. Equipment Design Support Summary Report (S)
3. Assessment of Photointerpreter Target Knowledge Final Report (S)
4_ State State of the Art Summary for Real Time Interpretation (U)
5. State of the Art Summary for Line-Scan Interpretation M.
6. Microscope Design Criteria (Convergence Angle) - Final Report (U)
TOTAL AUTHORIZED FUNDS - Original Contract 25X1
^ UNCLASSIFIED
COMFIDENT IAL
^ SECRET
I Declassified in Part -Sanitized Copy Approved for Release 2012/11/01 : CIA-RDP79B00873A000100010155-2