COMPLETION AND CONTRACT(SANITIZED) TO DESIGN AND DEVELOP A PROTOTYPE OPTICAL EQUIPMENT TEST KIT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79B00873A000800010036-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
October 18, 2012
Sequence Number: 
36
Case Number: 
Publication Date: 
July 31, 1972
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP79B00873A000800010036-7.pdf90.92 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/10/18: CIA-RDP79B00873A0008000,010036-L7,- NPIC/TSG/RED/DB-46/72 MEMORANDUM FOR: Chief, Research & Engineering Division, TSG SUBJECT Completion of Contract to 25X1 Design and Develop a Prototype optical Equipment Test Kit 1. This memorandum reports completion of a contract with A fixed price contract was 25X1 initiated on 30 June 1971 with funding of for 25X1 the purpose of designing, developing, and packaging a kit of optical equipment testing devices. The project was completed in January 1972. kit for field use in the testing of image viewing systems. 2. Under the terms of the contract) 25X1 was to design, develop, and package a prototype optical test selected the several items to be included 25X1 for the packaging of the items into a complete kit. 25X1 in the kit, tested the items for accuracy, wrote a manual of testing procedures, and subcontracted with a specialist satisfactorily selected the required items and 25X1 responsive to requests and requirements. The size problem of the completed kit was not entirely the fault of - 25X1 packaging by the specialist subcontractor, the final kit became larger than intended and, although portable by hand, too large to fit under an aircraft seat. 3. Overall performance of was rated 25X1 as above average. They performed well in the selection of equipment, submitted required reports on time, and were produced the packaged kit. The intention of the program was. to produce a kit compact enough to allow being hand- carried aboard an airplane and allow storage beneath the standard aircraft seat. However, because of the large number of items to be included and rather inefficient They submitted the problem to a supposed 25X1 specialist and the result was not entirely satisfactory. Declassified in Part - Sanitized Copy Approved for Release 2012/10/18: CIA-RDP79B00873A000800010036-7 Declassified in Part - Sanitized Copy Approved for Release 2012/10/18: CIA-RDP79B00873A000800010036-7 SUBJECT: Completion of Contract) I to Design and Develop a Prototype Optical Equipment Test Kit 4. The completed prototype test kit was submitted to TEB and several operational units for evaluation. As a result of this testing it was determined that some of the items could be discarded. A second version prototype test kit is being developed that should, by discarding the unnecessary items and with more efficient packaging, produce an optical equipment test kit of a more satisfactory size and capabXle of being transported beneath the standard air- craft seating. Chief Develpoment Branch Distribution: Original - Addressee 2 - NPIC/TSG/RED/DB NPIC/TSG/RED/DB/ NPIC/TSG/RED DB (31 July 1972) 1'1:.Ri'!ING NOTICE SENSl / ,,,SOURCES Pr -UL""ED SEC. iT Declassified in Part - Sanitized Copy Approved for Release 2012/10/18: CIA-RDP79B00873A000800010036-7