CONTRACT INSPECTION REPORT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79B00873A000800020042-9
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 30, 2012
Sequence Number: 
42
Case Number: 
Publication Date: 
December 16, 1969
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP79B00873A000800020042-9.pdf94.04 KB
Body: 
- LI-SLCET Decl t&CONFIDENTIAI rl 2012/08/30:r Release CIA-RDP79B00873A000800020042-9 Ibbll ICU III rail- ?-mailiu,_,....... .......q.., . .r...,...?___. IIIP TASK NO. CONTRACT INSPE4IP0N REPORT To: Contract Administration and Settlement Branch/PD/OL DATE 16 December 1969 INSPECTION REPORT NO. (If final, so state 2 ESTIMATED COMPLETION DATE 30 June 1970 NAME OF CONTRACTOR TYPE OF COMMODITY OR SERVICE Scientific and Technical Backup for research programs THE CONTRACTOR IS ON SCHEDULE Ea YES NO THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS lavEs 0 NO IF ANSWER IS "NO" ADVISE REC. OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- DITIONAL FUNDS INVOLVED. PER CENT OF WORK COMPLETED - 25% PER CENT OF FUNDS EXPENDED - 25% HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE. DURING THE PERIOD? Lars 0 NO (If yes, give HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO (If yes, indicate items, quantity, and cost on reverse OR OTHER END ITEM BEEN RECEIVED FROM details on reverse side.) CONTRACTOR DURING THIS PERIOD? side.) II THE CONTRACTOR YES la" INCENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES AIN" IF YES, CHECK TYPE 0 COST Ill ;%/ID 0 PERFORMANCE c3 DELIVERY NOTE: USE REVERSE SIDE FOR COMMENTS. FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. OVERALL PERFORMANCE OF CONTRACT-OR 1. 'OUTSTANDING 2. MEXCELLENT 5. 0 VERY GOOD 6. IF OVERALL PERFORMANCE OF CONTRACTOR REASONS ON REVERSE SIDE. ABOVE AVERAGE AVERAGE MINIMUM ACCEPTABLE IS UNSATISFACTORY 7. rj. UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE RECOMMENDED ACTION AND APPLICABLE. At4 CONTINUE AS PROGRAMMED --- CLOSE OUT IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT THE FOLLOWING: WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE 0 OTHER (Specify) IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE HAVE BEEN RECEIVED. THESE INCLUDE. WHERE ITEM RECD DOES NOT APPLY - ITEM RECD .DOES NOT APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER END ITEMS SPECIAL TOOLING OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR 11, 12 December 1969 _ ..._ I DIVISION . TSSG RED ATB EL I s.IGNATURE OF APPROVER Ch/ATB/RED/EL FORM USE 12-67 1897 PREVIOUS EDITION 0 UNCLASSIFIED laCONFIDENTIAL 0 SECRET (12-36) 25X1 25X1 25X1 ? npriaccifipri in Part - Sanitized COPY Approved for Release 2012/08/30 : CIA-RDP79B00873A000800020042-9 Declassified in Part- Sanitized Copy Approved forWelease2012/08/30 : CIA-RDP79B00873A000800020042-9 NARRATIVE REPORT DIHTERiH ['FINAL The draft final report of the dual gamma mensuration study has been received, evaluated and is being put into final form by The contractor was within time limits and was accurate in their cost estimate for this task. They are presently preparing two proposals, one in color film evaluation and the other in color film mensuration. Total Authorized Funds -- UNCLASSIFIED Declassified in Part - Sanitized Copy Approved for Release 2012/08/30: CIA-RDP79B00873A000800020042-9 No changes in scope No overrun 25X1 EICONFIDENTIAL SECRET