STATUS REPORT FOR PERIOD 1 AUGUST THROUGH 31 AUGUST 1970 U.S. GOVERNMENT CONTRACT (SANITIZED)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79B00873A001300010011-8
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
17
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 29, 2012
Sequence Number: 
11
Case Number: 
Publication Date: 
August 1, 1970
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79B00873A001300010011-8.pdf340.82 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 110r Co?i Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 STATUS REPORT for period 1 August through 31 August 1970 U. S. GOVERNMENT File No. 11038 ? STAT STAT 00, Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 This document is presented as the Monthly Ctahic Pannrt unrictr CIOntrant to the U. S. The report period represented herein covers the period 1 August through 31 August 1970. STAT STAT STAT f=i Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 INDEX 1 Program Status Summary 1 Task 1: Statements of Work, Specifications, Report Preparation Ti - 1 Task 11: Stage Drives T11 - 1 through 2 t=i Task 16, 17, and 18: Fl Viewing Optics and Viewing Illumination T16, 17, & 18 - 1 Task 22:? Interferometer Assembly T22 - 1 , 7 k=, Task 36: Overall Assembly T36 - 1 Task 40: Installation T40 - 1 Task 43: Computer Programming and Services T43 - 1 through 4 6.4 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 C=I Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 PROGRAM STATUS SUMMARY Scheduled percentage of completion 98.3% Actual percentage this date 93.3% The work of assembling the Stereocomparator has reached the point of integration of the computer program with the mechanical, electrical, and optical subsystems. Certain problems have developed which are mentioned in this report. While these problems have not been solved at this time, work is proceeding, .and no setbacks to the Stereocomparator schedule are presently contemplated. -1- Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 6 Declassified in Part- Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 TASK 1 STATEMENTS of WORK, SPECIFICATIONS, REPORT PREPARATION Scheduled percentage of completion 100% Actual percentage this date 100% As an aid in preparing the acceptance test pro- cedures, the performance specifications for the Stereo- comparator are presently being reviewed with the object of updating them. Ti - 1 1=, Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 1= 9 r- TASK 11 STAGE DRIVES Scheduled percentage ,of completion 100% Actual percentage this date 97% Accelerometer readings taken at various points on the Stereocomparator substructure during the approx- imately 20 Hz. vibration has shown that vibration of the stage on one side of the instrument reflects and shows up as vibration of the stage on the other side of the instrument. Work is continuing to determine if the base of the instrument is vibrating as a whole. The vibration absorbing system STAT has proved to be a problem. It does eliminate vibration from the ground to thA Stereocomparator, but it is not sufficiently damped to prevent excursions 'whenthe Stereo- comparator mechanical system is excited. The addition of viscous damping devices between the Stereocomparator frame and the ground (around the units) is presently under study. has been retained as a consultant to assist in the design of this equipment. T11 - 1 STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 ? Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 ? In the event that a damping device does not com- pletely cure the problem, it may be necessary to stiffen the connection between the stages and the granite base blocks through modifications to the threadless lead screw stage drive units. T11 2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 7 U Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 TASK 16, 17, and 18 VIEWING OPTICS and VIEWING ILLUMINATION Scheduled percentage of completion 100% Actual percentage this date 100% The task of optical alignment and checkout is continuing. The optical assembly and preliminary alignment is complete. The optical systems are in process of fine alignment adjustment to maximize the resolution and generally improve the image quality. T16, 17, & 18 - 1 t; Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 TASK 22 INTERFEROMETER ASSEMBLY Scheduled percentage of completion 100% Actual percentage this date 75% An improved interferometer design was bread- boarded. The new design uses birefringent material, specifically a Rochon prism, and half and quarter wave plates, to eliminate the return beam to the laser. This means that the interferometer light path can be short and direct without the problem of a return beam interfering with the operation of the laser internal servo system. In addition, the short path will reduce the possibility of flicker of the beam due to air refraction. The final design has been laid out and is ready for detailing. It is expected to be ready for installation when the present software 'checkout phase is complete. T22 - 1 fl Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 f:31 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 TASK 36 OVERALL ASSEMBLY Scheduled percentage of completion 100% Actual percentage this date 90% The overall assembly of the Stereocomparator Is essentially complete except for the exterior skin. The equipment is presently in its final adjustment and debugging phase. T36 - 1 ?=1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 TASK 40 INSTALLATION Scheduled percentage of completion 100% Actual percentage this date 20% In the recent inspection of the customer's install- ation site, it was noted that the upper cable tray on the left-hand side of the Stereocomparator interfered with access for service for the left side main illumination system. Drawing No. E8235B has been revised and transmitted to the customer. This drawing shows the suggested relocation of the interfering cable tray as outlined above. There is the possibility that modifications will be required to the vibration absorption system beneath the structural steel main frame of the Stereocomparator. It is assumed that these changes can be made without significant conflict with the installations beneath the computer floor at the installation site. T40 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 TASK 43 COMPUTER PROGRAMMING and SERVICES Scheduled percentage of completion 100% Actual percentage this date 93% report on the status of the computer program effort for the Stereocomparator is in- cluded in the pag&s following. Their work of integration and computer program test is well underway; however, a very substantial effort is required before the pro- gramming system can be considered complete and satisfactory. T43 - 1 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 LI Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 EXCERPTS from MONTHLY PROGRESS REPORT July, 1970 1. Work on this project was suspended while the Stereocomparator hardware assembly was being completed. In the last week of the month, work was started on the software changes for the expansion of core from 16 to 32K words. The attached diagram shows the layout of core that is planned now that the 32K word memory Is available. There are two modes of operating in the 32K environment: extend and non-extend. Extend mode allows access to all 32K of core, while non-extend mode allows a program access only to the half of core it is resident in. Since Fortran-coded routines have no control over their own mode of operation, they have been put into upper core, where they can access Common in the non-extend mode. Since DAP- coded routines can control their mode, they T43 - 2 STAT fl Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 ? can reside in lower core and still access Com- mon (in the extend mode). Certain DAP-coded routines are used by both Fortran and DAP-coded drivers; so these must go in upper core where they will be accessible to Fortran in non-extend mode. Certain library routines are used by both Fortran and DAP routines; so for the same reason must go into a special sector of high core. 2. During August, the accommodation of the soft- ware to the 32K environment will be completed. The final integration of the Stereocomparator program will then begin. 3. At this time there exist no pending unresolved technical problems. The programming for the project is 85% complete at this time. T43 - 3 k=i Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8 9 Common Empty Fortran for stereoscan Certain Library routines Certain DAP routines Pseudo-base sector Empty DAP for , ca 1 ibra tion/ diagnostic DAP for stereoscan Base sector Figure 1. Core Layout for 32K T43 - 4 32K 16K EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010011-8