TECHNICAL BACKROUND PROCUREMENT INFORMATION
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP79B00873A001900010088-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
September 6, 2012
Sequence Number:
88
Case Number:
Publication Date:
March 10, 1965
Content Type:
MISC
File:
Attachment | Size |
---|---|
![]() | 154.1 KB |
Body:
_ .~., .e....., .o ! ~
Declassified in Part -Sanitized Copy Approved for Release 2012/09/06 :CIA-RDP79B00873A001900010088-8
~~'~ . .
SECRET
(When Filled In)
r
TECI-iNICA,Id B~I{CxR?LJND PR.OCURE~ENT INFORMATION
I. Contractor
A. Name and address:
B. Evaluation of previous perforrrbance:
II. Brief description of this procurement: S~?~~~
B. Is this procurement. for other than_.,a standard, "off the shelf" or slightly
modified commercial item? ' If "yes", is it anticipated that
any more 'of this unit will be procured? If so, a complete
set of directly reproducible manufacturing- drawings and specifications
would normallybe included in this procurement. Comments:
Will
C
t
t
f
?
th
i
d
90 d
.
con
rac
cover a per
ays
o
o
more
an
If "yes", are progress reports desired? !
quency, content and number of copies desired:
~ ~'~~ ~~ ~
If so, indicate fre-
~~t~~:
D. Is any Government-owned property to be provided to the contractor?
T
If so, list and indicate its availability (where, when,
etc . )
SECRET
(When Filled In)
F \ /
Declassified in Part -Sanitized Copy Approved for Release 2012/09/06 :CIA-RDP79B00873A001900010088-8
~:
Declassified in Part - Sanitized Copy Approved for Release 2012/09/06 :CIA-RDP79B00873A001900010088-8
SECRET
-(When Fi11ed In)
E. Is any special tooling involved?
F. Security:
1. Association with the Sponsor is
2. The specifications and~or drawings are
3. The ,item is
~+, Contractor personnel known to be aware of this proposed procurement:
III. Reasons for selection of this source. If other .sources were considered, indi-
cate results. If no other sources were ,considered, list the reasons why .this
firm is considered to be uniquely qualified to perform this work.
~' ...
~:~ "~
~ ~~ ~.~ ~ 2
IV. If contract-.will cover deliver.abl.e item(s).state room location where equip-
ment will be installed ~ (It is extremely important that the
Engineering Data Sheet including .room location and any other pertinent facts
be submitted to NPIC Engineering Section as far as possible in advance of
delivery.) ~'
In the event additional space is required, use the reverse side(s) of this form,
with a reference to the item number to which the comment applies.
SECRET
(When Filled In)
Declassified in Part - Sanitized Copy Approved for Release 2012/09/06 :CIA-RDP79B00873A001900010088-8