REQUEST FOR SUPPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP79B00873A001900010098-7
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
August 30, 2012
Sequence Number:
98
Case Number:
Publication Date:
May 29, 1969
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 112.78 KB |
Body:
Declassified in Part-Sanitized Copy Approved for Release 2012/08/30: CIA-RDP79B00873A001900010098-7
7 7 7v
SECRET
NPIC/TSSG/DEN1634-69
29 May 1969
MEMORANDUM FOR: Chief, Production Services Group
SUBJECT: Request for Support
1. The Corning Glass Works is presently under contract t?produce
anq. 'Improved Rear Projection Screen Material. A number of sample Screens
have been produced and their physical characteristics have been measured.
Although these measurements, in most cases, exceed those of the best
commercially available rear projection screen material, a further aid
In evaluating the samples is _subjective testing by P.1. 'a. A suitablig
subjective test is now being designed by The Boeing Company.
2. Basically, the subjective testing will consist of random
comparison of pairs of the sample screens as well as comparison of each
of the sample screens with a Polacoat Type 1S-75 screen. In addition,
subjective evaluation will be made of the resolution characteristics
of the sample screens and the Polacoat Type LS-75 screen.
3. It is planned to start these tests on 3 June 1969, with comple-
tion scheduled by 27 June 1969. Approximately 138 man-hours of testing,
not necessarily consecutive, will be required. IEG and APSD/TSSG will
furnish the personnel for test subjects. Boeing personnel will conduct
the tests.
4. PSG is requested to furnish the test viewer and space to conduct
these tests. Specifieally, use of the Richards Film Viewer located in
room 2N833 is requested. Removal of the existing viewing screen will
be required. This I-rill be accomplished by qualified personnel from the
Maintenance Branch of ESD/TSSG. Restoration of the equipment to its
original operating condition upon completion of the tests is assured.
Also, at any time during the tests, should operational requirements
dictate, the equipment will be restored to its original operating condi-
tion in a minimum period of time.
5. The DED Project Office for these tests is
1
ii;;C:1?;iirj ;10T IV)^.!,',111:
downgrading 11110
dVdiZzliliCa003 i
...,..-,.........,??oano**,..7.21.!
Declassified in Part - Sanitized Copy Approved for Release 2012/08/30: CIA-RDP79B00873A001900010098-7
25X1
25Xi
Declassified in Part- Sanitized Copy Approved forRelease2012/08/30 : CIA-RDP79B00873A001900010098-7
46- Lai
SUBJECT:
Request for Support
6. For information, preliminary coordination with PSG for use
of this equipment has been effected with
Chiefs
Dist button:
Original Addressee
1 .6 VPICMSG/DED
2 ETTOSSG/DED/R&DBral
NPIC/TSSG/DED/R&DBr
velopmen & snglneering iiv ton, 'SSG
(29 MAY 69) (03019 & 997065)
25X1
25X1
25X1
SEPRET
2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/30: CIA-RDP79B00873A001900010098-7