COMOR STUDY ON LONG-RANGE REQUIREMENTS FOR SATELLITE PHOTOGRAPHIC RECONNAISSANCE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79B01709A002000030045-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
2
Document Creation Date: 
December 15, 2016
Document Release Date: 
September 4, 2003
Sequence Number: 
45
Case Number: 
Publication Date: 
July 24, 1964
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP79B01709A002000030045-9.pdf75.21 KB
Body: 
~ ~lJl Utt) / LLacx; . 19A Approved For Rel4ase 2003/1Q1j49 sq8*pl '79B01709AO02000030 25X1 24 July 1964 MEMORANDUM FOR: Director of Central Intelligence COMOR Study on Long-Range Requirements for Satellite Photographic Reconnaissance 1. Since your injunction that COMOR was to complete the study on the above subject which you assigned after the Board meeting on 22 July, COMOR has met twice on the problem. The parameters of the NPIC study have been agreed upon, and I have requested that it proceed as rapidly as possible. I have requested that it be made available to COMOR by Monday afternoon, although NPIC is doubtful that this deadline can be met if their study is to be well done. 2. The next meeting of COMOR is called for Monday afternoon to consider a draft which I am preparing on the basis of the reports available thus far, which of course would have to be modified by the results of the NPIC study. I preferred not to delay until then in the interests of moving the deliberations on this prob- lem as rapidly as possible. 25X1 25X1 25X1 25X1 25X1 25X1 25X1 3. COMOR earlier was briefed by the NRO but will on Monday have a refresher on this, as we as on LANYARD. of DDS&T briefed the COMOR this morning on It is the consensus that these arc very important contributions to the development of our report. In addition to meetings, the regular NRO representative at COMOR _JNRO was also present this morning and I am sure will provide any information we desire. 5. f DIA has stated that General Carroll did not feel this task c7e adequately completed within the week deadline, since he like other principals on the Board would need to have the report at least by the day before. also advised that General Carroll was planning to call you, requesting an extension of one week. It is the view of COMOR that an extension of one week is essential if the report is to be meaningful. Copy of 10 NRO review(s) completed. Approved For R e 1 : CIA-RDP791~ 25X1 25X1 25X1 25X1 25X1 25X1 6. Recommendation: That you extend the deadline for the completion of the assigned study to Tuesday,' 4 August, the report to be available at least by noon of that day to the members of the Board. 25X1 25X1 Copy 1 DCI 2 DCI 3 DDCI 4 Exec. Sec., USIB 5 DDI 6 DDS&T 7 SA(COMOR)/DDS&T 8 SA(COMOR)/DDS&T 9 SA(COMOR)/DDS&T 10 SA(COMOR)/DDS&T Chairman Overhead Reconnaissance 25X1 25X1 TOP SECRET Approved For Release 2003/10/01 : CIA-RDP79B01709AO02000030045-9 Approved For Release 2003/10/01 : CIA-RDP79B01709AO02000030045-9