LO-YANG THERMAL POWER PLANT LO-YANG, CHINA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP79T00909A000100010098-5
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
7
Document Creation Date:
December 28, 2016
Document Release Date:
August 10, 2001
Sequence Number:
98
Case Number:
Publication Date:
September 1, 1968
Content Type:
BRIEF
File:
Attachment | Size |
---|---|
![]() | 321.47 KB |
Body:
Approved For Release 2001/09/04: CIA-RDP79T00909A0001000lTop-Secret
7
DIRECTORATE OF
INTELLIGENCE
le~
Industrial Facilities
(Non-Military)
Basic Imagery Interpretation Brief
Lo-yang Thermal Power Plant
Lo yang, China
Handle via Talent - Keyhole
Channelr Only
Top Secret
BCS 13/0037/69
DECLASS REVIEW by NIMA/DOD TCS 10281/68
DATE SEPTEMBER 1968
Approved For Release 2001/09/04: CIA-RDP79T00909A00010001009' 'Y
PAGES 3
Approved For Release 2001/09/04: CIA-RDP79T00909A000100010098-5
WARNING
This document contains information affecting the national security of the
United States within the meaning of the espionage laws U. S. Code Title 18,
Sections 793, 794. The law prohibits its transmission or the reve-
lation of its contents in any manner to an unauthorized person, as well as
its use in any manner prejudicial to the safety or interest of the United
States or for the benefit of any foreign government to the detriment of the
United States. It is to be seen only by personnel especially indoctrinated
and authorized to receive information in the designated control channels.
Its security must be maintained in accordance with regulations pertaining
to TALENT-KEYHOLE Control System.
GROUP 1
EXCLUDED FROM AUTOMATIC
DOWNGRADING AND
DECLASSIFICATION
Approved For Release 2001/09/04: CIA-RDP79T00909A000100010098-5
RECORD
COPY
COPY NO.
PUB. DATE
LOCATION
DATE RECEIVED
MASTER
LOCATION
DISPOSIT
I
11
N DATE(S)
or Ralaw;a - 01109104 CIA
STOCK MINIMUM
-RM79 0090
A0001 0001 C~8-5
MAXIMUM 10
CUT TO
COPIES 0
DAT
1-75
CUT TO
COPIES
DATE
9
COPIES DESTROYED
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
MASTER
DATE
DATE
NUMBER OF COPIES
DATE
NUMBER OF COPIES
MO.
DAY
Y R .
RECEIVED OR ISSUED
R E C D
I S S D
BAL
MO.
D A Y
Y R .
RECEIVED OR ISSUED
RECD
ISSo
BAL
9
27
68
ist Unit #103-112
10
10
-IL
49
Approved For Releas
200J
/09/0
4: CI
-RD
79
09
9A000100010098-5
TITLE NPIC
TS/T/K
Handle Via Approved For Release 200OF9/5I(RE4RRFiT00909A000100010098-5
Talent-KEYHOLE TCS - 10281 /68
Control System Only
IMAGERY ANALYSIS SERVICE BCS - 13/0037/69
INSTALLATION OR ACTIVITY NAME COUNTRY
Lo-yang Thermal Power Plant CH 25X1A
UTM COORDINATES GEOGRAPHIC COORDINATES 'UMIKtX NU. WAC-P I C No.
49SFJ272383 34-41-OON 112-22-50E None 0385-17B
MAP REFERENCE
ACIC. US Air Target Chart 200, Sheet 0385-8AL, 1st edition, April 60,
Scale 1:200,000 (SECRET)
Not required
The power plant is located in the northwestern portion of Lo-yang and adjoins
the Lo-yang Tractor Plant No. I This plant is also the major
source of steam and electricity for several other industries located in the
immediate vicinity.
The plant is located within an irregular walled area partially contiguous
with the tractor plant. The spray ponds and pump house are separately secured.
The power plant is coal fired and rail served.
The easternmost boiler section was built to accommodate four double
boilers but only three have been installed. The western boiler section houses two
double boilers. The generator hall contains at least five generators as indicated
by five sets of power leads. There are four main and four auxiliary transformers
within the switching yard. Sediments and waste water are pumped to nearby waste
basins.
Smoke was observed being emitted from both smoke stacks, and at least five
of the six spray ponds were operating along with the forced-draft cooling towers
on all missions referenced.
- I - Handle Via
Approved For Release 20/Sf I~,~RI00909A000100010098- Talent KEYHOLE
gontrol System Only
Handle Via Approved For Release 20 OP919ECR fFFpTOO909A000100010098-5
Talent-KEYHOLE TCS - 1 0281 /68
Control System Only
Key to Annotations
Item No. Description
Waste Basins (2)
Pump House and Dam
Spray Ponds (6)
Precipitators (2)
Coal Processing Building
Water Treatment Facility Irregular
Generator Hall
Forced-draft Cooling Towers (2)
Control House
Switching Yard
Measurements (Ft) Remarks
80 x 55 7 Intake Conduits
210 x 160 (3) 5 Operating
310 x 160 (1)
285 x 160 (2)
125
x
85
3 Double Boilers
I Not Installed
2 Double Boilers
625
x
100
At least 5 generators
280
x
50
22 and 8 Individual Fans
100
x
50
330
x
50
4 Main Transformers
4 Auxiliary Transformers
A roved For Release 0 /0 0 2 CIA-RDP79T00909A000100010098-5 Handle Via
pp f0P S~~CRET RUFF Control System Only
Handle Via Approved For Release 2OTOh/6ECR TRRUffrOO9O9AOOO1OOO1OO98-5
Talent-KEYHOLE
Control System Only TCS - 1028 1 /68
IMAGERY ANALYSIS SERVICE
Maps
ACIC. USAF Operational Navigation Chart, Sheet C-9, 2nd edition, Nov 60,
Scale 1:1,000,000 (UNCLASSIFIED)
CIA/IAD. FIR 65145, Chinese Power Plants, Honan Province, June 1966,
TCS 3320/66 (TOP SECRET RUFF)
Requirement
Handle Via
Approved For Release 20 OW00909AO00100010098-5 Talent-KEYHOLE
, /SH cRRR Control System Only
Top SIIPXI~oted For Release 2001/09/04: CIA-RDP79T00909A000100010098-5
Top Secret
Approved For Release 2001/09/04: CIA-RDP79T00909A000100010098-5