MOSKVA PETROLEUM REFINERY LYUBERTSY LYUBERTSY, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T00909A000300010057-1
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
16
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 2, 2008
Sequence Number: 
57
Case Number: 
Publication Date: 
January 1, 1972
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79T00909A000300010057-1.pdf1.18 MB
Body: 
Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Top Secret Industrial Facilities (Non-Military) DIRECTORATE OF INTELLIGENCE Basic Imagery Interpretation Report Moskva Petroleum Refinery Lyubertsy Lyubertsy, USSR Top Secret u rc 13/0n16 /77 25X11 DAIL JANUARY 2 COPY 1 15 PAGES 14 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 TOP SECRET RUFF CENTRAL INTELLIGENCE AGENCY Directorate of Intelligence Imagery Analysis Service RCS - 13/0016/72 Moskva Petroleum Refinery Lyubertsy 37VDC688242 55-39-OON 037-48-24E MAP REFERENCE 8th RTS. USATC, Mnlr~7-9HI (SECRET COMIREX NO. None 25X1 25X1 NIETB NO.25X1 None 25X1 Moskva Petroleum Refinery Lyubertsy is a small, older Soviet refinery. Its main products are straight-run, cracked, reformed, and blended gasolines, desulfurized diesel and fuel oils, sulfur, asphaltic materials, and various gaseous hydrocarbons. It also contains two probable pilot plants for research and development. The major production facilities include one and probably two crude oil distillation units, a thermal cracking unit, a fractionation unit, a catalytic reforming-hydrotreating unit, two probable catalytic reforming units, a probable hydrotreating unit, four gas processing units, an elemental sulfur recovery unit, blending and treating facilities, and several unidentified processing units. The refinery appeared to be operating in March 1962, the date of the earliest photography used in this report. It was operating in September 1963, when it was first seen on good-quality photography, and on all subsequent coverages except that of June 1964. Construction has been observed on all photography since September 1963. One area was under construction on the latest coverage in June 1971. This report includes a line drawing, a photograph of the refinery, a listing of facilities with measurements of storage tanks, a chart showing construction chronology, and a discussion of the status'of facilities. -1- TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 25X1 TOP SECRET RUFF TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 TOP SECRET RUFF The Moskva Petroleum Refinery Lyubertsy is located in Lyubertsy, a south- eastern suburb of Moscow (see Figure 1). It has reportedly been operating for over 34 years. 1/ 25X1 LDAI The refinery is used for research and development as well as fuels production. Soviet reports indicate that the following research and design institutes have been associated with the refinery: the All-Union Scientific Research Institute for Petrochemical Processing, the Leningrad State Institute for Designing Enterprises for Synthetic Liquid Fuel and Gas, the State Scientific Research and Design Institute for Petroleum Machine-Building, and the Institute of Chemical Physics. Research at the refinery has included studies of atmospheric- vacuum distillation, catalytic reforming, furnace construction, polypropylene production, carbamide deparaffination, and acetic acid production. 1/ Crude oil to charge the refinery comes via pipeline from the Volga-Urals production region. 2/ Electric power and possibly some steam for the refinery are produced at the adjacent Moskva Heat and Thermal Power Plant Lyubertsy TETS 25X1 Physical Features The refinery measures approximately 6,600 by 5,700 feet and occupies about 875 acres (see Figures 2 and 3). It is secured by a wall. Rail service into the refinery is provided by a spur from the main line between Moscow and Voskresensk. ' Operational Functions The major refinery units presently in operation include one and probably two crude oil distillation units, a thermal cracking unit, a fractionation unit, a catalytic reforming-hydrotreating unit, two probable catalytic reforming units, and a probable hydrotreating unit. It also contains a gas fractionation unit, a gas separation unit and two other gas processing units, an elemental sulfur recovery unit, blending and treating facilities, and several unidentified processing units. In addition, the refinery contains two probable pilot plants. This refinery appears to have a smaller crude oil distillation capacity than most other major Soviet refineries, and a larger secondary processing capability than would ordinarily be required to further refine this crude. Some of the secondary processing units may be used for research and develop- ment, based on the fact that no two units are of the same design and on the presence of the two probable pilot plants. It is also possible that some of the secondary units are not utilized to their full capacity, or that they use oil previously processed at other refineries. Construction and Operational Status Construction has been observed on all coverage since September 1963, when the refinery was first seen on good-quality photography. Figure 4 shows the construction chronology of the individual units. Most of the major units in the refinery were complete by late 1964. On the latest coverage in June 1971, one area was still under construction. The refinery appeared to be operating on poor-quality coverage of March 1962. It was operating on photography of September 1963 and on all subsequent coverage except that of June 1964. Facilities and Equipment Table 1 lists the functional areas, facilities, and equipment within the refinery. Measurements are given to the nearest half-meter. -3- TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Q Next 1 Page(s) In Document Denied Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 AREA FUNCTIONAL DESCRIPTION STORAGE AND SUPPORT SHIPPING PROBABLE PILOT PLANT PROBABLE CATALYTIC REFORMING U/I CONSTRUCTION PROBABLE HYDROTREATING GAS PROCESSING PROBABLE CATALYTIC REFORMING CATALYTIC REFORMINGHYDROTREATING U/I SECONDARY PROCESSING STORAGE WATER TREANENT AND PRODUCTS STORAGE U/I SECONDARY PROCESSING GAS FRACTIONATION FRACTIONATION SHIPPING, PACKAGING AND SUPPORT DESALTING DESALTING U/I SECONDARY PROCESSING ELEMENTAL SULFUR RECOVERY U/I SECONDARY PROCESSING' U/I SECONDARY PROCESSING PROBABLE PILOT PLANT PRODUCTS STORAGE U/I SECONDARY PROCESSING PROBABLE STEAM PLANT STORAGE U/I SECONDARY PROCESSING THERMAL CRACKING CRUDE OIL DISTILLATION BLENDING, TREATING, AND ShIPPING PROBABLE CRUDE OIL DISTILLATION WASTE CAS DISPOSAL GAS SEPARATION U/I SECONDARY PROCESSING WATER COOLING AND TREATMENT GAS PROCESSING STEAM PLANT 1963 TOP SECRET RUFF 1964 1965 1966 1967 1968 LEGEND UNDER CONSTRUCTION COMPLETE EXPANSION F!GUfE 4. CONSTRUCTION CHRONOLOGY, MOSKVA PETROLEUM REFINERY LYUBERTSY, USSR. 1969 1910 1971 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 TOP SECRET RUFF Table 1. Equipment and Facilities at Moskva Petroleum Refinery Lyubertsy (Keyed to Figure 3) Area Functional Description Equipment and Facilities Water Cooling and Treatment 12 Pump buildings 3 Water treatment buildings 18 Support buildings 1 Venturi cooling tower 10 Induced-draft cooling towers 1 with 6 cells 1 with 5 cells 7 with 3 cells each 1 with 2 cells 4 Cylindrical storage tanks, 9 meters in diameter 15 Water treatment basins 1 Waste water holding lagoon 2 Water basins under construction Unidentified Secondary 1 Unit with Processing 7 columns 2 processing buildings 5 pump buildings 6 support buildings 4 horizontal storage tanks/ accumulators (not measured) 2 Gasholders 1 16.5-meter-diameter 1 9-meter-diameter Gas Separation 1 Unit with 10 columns 2 banks of processing equipment 1 processing building 1 processing/pump building 4 pump buildings 5 support buildings 15 horizontal storage tanks, 15 meters long 2 gasholders, 9 meters in diameter 4 Waste Gas Disposal 5 Support' buildings 2 Flare towers Probable Crude Oil 1 Unit with Distillation 1 probable atmospheric column 10 other columns 1 bank of heat exchangers/cooling coils/accumulators 2 pipe furnaces 2 pump buildings 4 support buildings 6 Blending, Treating, and 18 Blending/treating tanks Shipping 1 Blending/treating building 2 Pump buildings 2 Shipping buildings 4 Support buildings 1 Cylindrical storage tank, 9 meters in diameter 1 Water basin -7- TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Area TOP SECRET RUFF Functional Description Equipment and Facilities Crude Oil Distillation 1 Unit with 2`atmospheric columns '1 vacuum column 5 other columns 1 bank of processing equipment 2 banks of heat exchangers/ cooling coils/accumulators 3 pipe furnaces 2 pump buildings 1 support building 2,cvlindrical storaae tanks, 3 horizontal storage tanks (not measured) 3 Support buildings Thermal Cracking 1 Unit with 2 reactor columns 1 fractionating column 1 flash column 20 other columns (some probably are used for vapor recovery) 1 bank of processing equipment 3 pipe furnaces 4 processing/pump buildings 6 pump buildings 6 other buildings 4 cylindrical storage tanks, iorizontal storage tanks (not measured) Unidentified Secondary 1 Unit with Processing 2 columns 1 pipe furnace 1 processing building 2 pump buildings 1 support building 3 Support buildings 10 Cylindrical storage tanks 4 15-meter-diameter 4 12-meter-diameter 2 9-meter-diameter 10 Storage 3 Pump buildings 6 Support buildings 17 Cylindrical storage tanks 3 24-meter-diameter 1 18-meter-diameter 3 25X1 25X1 11 Probable Steam Plant 1 Probable steam generating building 4 Support buildings 4 Cylindrical storage tanks, -8- TOP SECRET -RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 TOP SECRET RUFF Area Functional Description Equipment and Facilities Unidentified Secondary 1 Unit with Processing 5 columns 2 banks of processing equipment (one is very tall and probably encloses some columns) 1 pump/processing building 3 pump buildings 2 Support buildings 2 Cooling towers 1 with 5 cells 1 with 3 cells 1 Water treatment basin 13 Products Storage 4 Support buildings 21 Cylindrical storage tanks 5 6-meter-diameter 16 14 Probable Pilot Plant 9 Columns 1 Bank of heat exchangers/cooling coils/accumulators 6 Processing buildings (one circular shaped) 3 Pump buildings 2 Support buildings 4 Cylindrical storage tanks (not measured) 12 Horizontal storage tanks (not measured) 15 Unidentified Secondary 1 Unit with Processing 12 columns 1 bank of processing equipment 1 bank of heat exchangers/ cooling coils/accumulators 5 horizontal reactors/settlers/ accumulators 8 horizontal accumulators/ settling tanks 2 processing buildings 3 pump buildings 1 support building 2 cylindrical storage tanks, 6 meters in diameter 4 horizontal tanks, 9 meters long 4 Pump buildings 2 Support buildings 12 Cylindrical storage tanks 3 15-meter-diameter 9 9-meter-diameter 4 Horizontal storage tanks 2 24-meter-long 2 15-meter-long 1 Water basin Unidentified Secondary Processing and Elemental Sulfur Recovery (a) Unidentified Secondary Processing 1 Unit with 6 columns 3 accumulators/settling tanks 2 pump buildings -9- TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 TOP SECRET RUFF Area Functional Description Equipment and Facilities Unidentified Secondary Processing and Desalting (a) Unidentified Secondary 1 Unit with Processing 10 columns 2 banks of processing equipment 1 bank of heat exchangers/ cooling coils/accumulators 1 pipe furnace 3 processing buildings 4 pump buildings 7 cylindrical storage tanks 2 9-meter-diameter (b) Elemental Sulfur 1 Unit with Recovery 3 columns 2 reaction-type vessels 2 possible retorts 1 bank of processing equipment 1 pump building 1 support building 1 cylindrical storage tank (not measured) 1 open storage area for sulfur 5 5 horizontal storage tanks 4 9-meter-long 1 6-meter-long (b) Desalting 3 Cylindrical storage tanks, 9 meters in diameter 2 3 cylindrical storage tanks 1 6-meter-diameter 1 Unit with 2 desalting spheres 5 settling tanks 1 processing building 1 Unit with 3 desalting spheres 4 settling tanks 3 processing buildings 5 Support buildings Shipping, Packaging, and 2 Support 5 12 Packaging buildings Shipping buildings Support buildings 19 Fractionation 1 Unit with 2 fractionating columns 1 bank of processing equipment 1 pipe furnace 1 processing building 6 Cylindrical storage tanks 2 15-meter-diameter 4 9-meter-diameter 20 Gas Fractionation 1 Unit with 3 gas fractionating columns 3 other columns 2 banks of processing equipment 2 pump buildings 1 support building 4 cylindrical tanks (not measured) -10- TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 25X1 LDAI Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 TOP SECRET RUFF Area Functional Description Equipment and Facilities 2.4 horizontal storage tanks 22 15-meter-lon 2 25X1 1 gasholder, in diameter 25X1 21 Unidentified Secondary 1 Unit with Processing 4 banks of processing equipment 3 processing buildings 1 pump building 4 horizontal tanks (not measured) 2 Pump buildings 3Cvlindrical storage tanks, 16 Horizontal storage tanks 3 15-mater-lnnn 7 2 9-meter-long 4 6-meter-long 6 Water Treatment and 5 Pump buildings Products Storage 14 Support, buildings 20 Cylindrical storage tanks 1 12-meter-diameter 1 9-meter-diameter 3 2 2 Water basins 24 Unidentified Secondary 1 Unidentified secondary Processing processing unit with 4 columns 1 bank of processing equipment 1 pipe furnace 1 processing building 2 pump buildings 26 Horizontal storage tanks 7 8 3 23 Storage 5 Pump buildings 1 Support building 74 Cylindrical storage tanks 4 45-meter-diameter 1 36-meter-diameter 1 30-meter-diameter 46 24-meter-diameter 1 21-meter-diameter 25 15-meter-long 25X1 25X1 25X1 -11- TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 TOP SECRET RUFF Area Functional Description Equipment and Facilities 25 Catalytic Reforming and Hydrotreating (a) Catalytic Reforming- 1 Unit with Hydrotreating 25X1 25X1 4 reactors 8 columns 2 banks of processing equipment 2 banks of heat exchangers/ cooling coils 3 pipe furnaces 3 pump buildings 4 support buildings 1 Pump building (b) Probable Catalytic 1 Probable catalytic reforming Reforming and Gas unit with Processing 9 columns 3 banks of processing equipment 1 bank of heat exchangers/cooling coils/accumulators 1 pipe furnace 2 processing buildings (one with 4 attached accumulators/settling tanks) 3 pump buildings 1 Gas processing unit with 5 columns 1 bank of processing equipment 1 pump building 1 gasholder, 18 meters in diameter (c) Probable Hydrotreating 1 Unit with 1 column 1 bank of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 pump building 1 Support building 1 Area under construction (d) Probable Catalytic 1 Unit with Reforming 8 columns 4 banks of processing equipment (2 banks probably contain two reactors each) 3 banks of heat exchangers/ cooling coils/accumulators 7 horizontal accumulators/ settling tanks 4 pipe furnaces 1 processing building with 4 attached accumulators/ settling tanks 2 pump buildings 1 cylindrical storage tank (not measured) 1 Support building 25X1 -12- TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 TOP SECRET RUFF Area 26 Probable Pilot Plant 1 Unit with 5 columns 3 banks of processing equipment 1 pipe furnace 1 processing building 1 pump building 1 support building Functional Description Equipment and Facilities 8 Support buildings 1 Cooling tower 6 Cylindrical storage tanks 2 7.5-meter-diameter 4 6-meter-diameter .27 Shipping 2 Pump buildings 1 Shipping building 1 Loading rack Storage and Support 4 Pump buildings 6 Support buildings Gas Processing 1 Unit with 2 columns 1 compressor building 1 support building 1 gasholder, 21 meters in diameter 22 Cylindrical storage tanks 1 Steam generator building 3 Cylindrical storage tanks, -13- TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 TOP SECRET RUFF Map 8th RTS. US Air Target Chart, Series 200, Sheet M0167-5HL, 3rd edition, July 1967, Scale 1:200,000 (SECRE 25X1 25X1 1. US Dep rtment of Commerce. JPRS, 44605, Studies in Oil Refining and Petro hemistr , USSR, "Development of Moscow Oil Refinery," D.V. Ivanyukov, pp 4W-46, 7 March 1968 (UNCLASSIFIED) 2. CIA. CRS/IR File No. 7012178, FBIS 63 L467, January 1963 (UNCLASSIFIED) 3. The Petroleum Publishing Co., International Petroleum Encyclopedia, 1969 edition (UNCLASSIFIED) Requirement COMIREX N06 Support Number 422990 -14- TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1 Top Secret Top Secret Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010057-1