TASH-ARIK REFINERY AND OILFIELD A-TA-AO-TI-AO-HSI-L0, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T00909A000500010008-3
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
10
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 18, 2008
Sequence Number: 
8
Case Number: 
Publication Date: 
May 1, 1972
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79T00909A000500010008-3.pdf317.73 KB
Body: 
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 Top Secret DIRECTORATE OF INTELLIGENCE Industrial Facilities (Non-Military) Basic Imagery Interpretation Report Tash-arik Refinery and Oilfield A-ta-ao-ti-ao-hsi-lo, China Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 DATE MAY 1972 COPY 11-17 PAGES 8 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 MAP REFERENCE AMS. Series 1505, Sheet NK 44-6, 1st ed, Jul 68, Scale 1:250,000 (SECRET) cracking unit. processing units are a crude oil distillation unit and a probable thermal run and probably cracked gasoline, kerosene, and diesel and fuel oils. The scale, probably for local use. The products of the refinery include straight- Tash-arik Refinery and Oilfield produces and refines crude oil on a small In February 1966, when the refinery was first seen on photography, both processing units appeared complete and support facilities were still under construction. The refinery was first seen in operation on November 1968 photography and it has been operating on all subsequent coverages through June 1971. of storage tanks, and a discussion of the status of facilities. location map, a detailed listing of equipment and facilities with dimensions This report includes a photograph and line drawing of the refinery, a -1- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 TOP SECRET RUFF CENTRAL INTELLIGENCE AGENCY Directorate of Intelligence Imagery Analysis Service 25X1 L~.)A I Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 TOP SECRET RUFF 1 ~n4,b :Pd v9 roe ~ C ~ Y ? ? V r Q ~'. Jar O? p 70 c ~ a' o"a~ q / i'a~ - Z~O_i ~ Q ... L m v , ~~ I L 0 y t4 ,~ c lane" ; ~, ? 1. ~aP, sU/tX `?. .~` /Y ~ u.. r # m6ii-,y0 ~.. ? ?~ ~:.. z ~_U ~ L {/ / ..Q ~~ ~ CaT a?x~ ~. ~ Ud .~ q m ~' NI. ~~ ?~? L ~~ 3 m U O U 18 ;.1? I~ ~ ?.n U m ?~ t 2 1 m o 0 ? m I~Q ~o _ i v ~ S? $ 1 4= A . .f E ..L..' d alt ~` : MO o ~., a S m = Z E l 1 v1 Q J \ ~ '"'` C] W LLJ c ??`.. ' c~ 'N, sa F- S U N ~-~~ q c] \ ~/` ~ 1~.1 t ~ s ~ r ~ 1 ~m ~ t ~q ~ j~? ? Q f~mc :a 7 -2- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 TOP SECRET RUFF INTRODUCTION Tash-arik Refinery and Oilfield is located about 50 nautical miles (nm) northeast of Kucha, Sinkiang Uighur Autonomous Region (see Figure 1). A-ta-ao-ti-ao-hsi-lo, a housing, storage, and support settlement for the refinery and oilfield, is adjacent to the refinery. Steam is provided by a collocated steam plant. A small heat and thermal power plant is being added. The refinery is road served. The only security for the refinery is provided by its remote location. Oil to charge the refinery comes from two small oilfields located just north and northwest of the refinery. A pipeline connects the oilfield to the northwest with the refinery. BASIC DESCRIPTION The refinery and its support facilities (not including the large housing, support, and storage area) occupy about 45 acres in an area measuring 1,550 by 1,350 feet. The oil storage and processing area occupies about 15 acres (see Figures 2 and 3). Operational Functions This is a small refinery in size and charge capacity. The only processing units present are a crude oil distillation unit and a probable thermal cracking unit. The products of the refinery, which are probably for local use, include straight-run and probably cracked gasoline, kerosene, and diesel and fuel oils. Construction and Operational Status In February 1966, when.the refinery was first seen on photography, both processing units appeared complete but the refinery was not in operation. The steam plant was under construction and 70 percent of the storage tanks were in place. Construction had not been started on the pipeline to the oilfield or on the loading rack. In the housing, support and storage area adjacent to the refinery, about 30 percent of the present buildings were in place. The refinery was first seen operating on photography of November 1968. The steam plant, the pipeline to the oilfield, the loading rack, most of the storage tanks, housing, support, and storage facilities were present. No changes were observed on photography of December 1969. On the next available photography, in June 1971, a heat and thermal power plant was nearing completion. It was probably constructed to serve the housing, support, and storage area since no processing units had been added to the refinery. -3- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 Next 1 Page(s) In Document Denied Iq Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 TOP SECRET RUFF The refinery was operating on all coverages from November 1968 through June 1971. 1 20-foot-diameter 5 45-foot-diameter 3 35-foot-diameter 9 Cylindrical storage tanks B Storage 5 Support buildings 1 Large water storage basin A Water Storage 2 Support buildings Area Functional Description Equipment and Facilities (Keyed to Figure 3) Table 1. Equipment and Facilities at Tash-arik Refinery Table 1 lists the functional areas and,equipment within the refinery. Facilities and Equipment 2 clusters of processing 1 other column C Crude Oil Distillation 1 Unit with 1 atmospheric column equipment 1 furnace 2 10-foot-diameter 8 15-foot-diameter 10 cylindrical storage tanks 1 pump building 4 Support buildings 2 clusters of processing for vapor recovery) 4 columns (one is probably D Probable Thermal Cracking 1 Unit with equipment 3 horizontal storage tanks, 1 furnace 15 feet long 3 Support buildings -6- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 25X1 LOA"I Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 TOP SECRET RUFF Functional Description Equipment and Facilities Storage and Shipping Support 1 Truck loading rack 2 Support buildings 18 Cylindrical storage tanks 2 45-foot-diameter 5 40-foot-diameter 6 35-foot-diameter 4 20-foot-diameter 1 10-foot-diameter 1 Tank base 23 Support buildings -7- TOP.-SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 TOP, SECRET RUFF Map AMS. Series 1505, Sheet (SECRET Requirement COMIREX N06 Support Number 428906 44-6, 1st edition, July 1968, Scale 1:250,000 -8- T.O,P:SECRET` RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3 Top Secret Top Secret Approved For Release 2008/06/18: CIA-RDP79T00909A000500010008-3