CHIN-HSI PETROLEUM REFINERY LIEN-SHAN, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T00909A000500010017-3
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
16
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 18, 2008
Sequence Number: 
17
Case Number: 
Publication Date: 
June 1, 1969
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79T00909A000500010017-3.pdf1.23 MB
Body: 
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 Top Secret DIRECTORATE OF INTELLIGENCE Industrial Facilities (Non-Military) Basic Imagery Interpretation Report Chin-hsi i Petroleum Refinery Lien-shan, China RCS 13/0186/69 25X1 DATE JUNE 1969 COPY 105 PAGES 13 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 TOP SECRET RUFF Chin-hsi Petroleum Refinery CENTRAL INTELLIGENCE AGENCY Directorate of Intelligence Imagery Analysis Service UTM COORDINATES GEOGRAPHIC COORDINATES 51TUF172103 40-44-18N 120-49-58E MAP REFERENCE 15th RTS. USATC 200, Sheet M0289-24HL, .3rd edition, Sep 66, Scale 1:200,000 (SECRET Not Required This report provides a detailed imagery-derived analysis of the Chin-hsi Petroleum Refinery from August 1962 to November 1968. The Chin-hsi refinery was originally designed to produce and refine synthetic oil. The synthetic oil production facilities were never completed, however, and when the refinery was completed during World War II it was utilized to process crude oil. At present, its major products are straight-run, cracked and blended gasolines, kerosene, diesel and fuel oil, and residuum. This report includes a detailed line drawing and photograph of the refinery, mensuration of storage tanks, a discussion of physical features and operational functions, a chronology of construction activity and status, and reference data. -I- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 I ut' StL t 1 KUrr -2- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 TOP SECRET RUFF The Chin-hsi Petroleum Refinery is located in an industrial complex in the southwestern outskirts of Lien-shan (Chin-hsi), in Liaoning Province. The refinery was originally designed to produce and process synthetic oil, but the synthetic oil production facilities were never completed. When the refinery was completed during World War II it was utilized to process crude oil.l/ Reportedly it now processes crude oil from the Sa-erh-tu Oil Field.3/ The refinery is served by a good all-weather road system and by a spur from the main railroad leading south from Chin-hsi. A pipeline which reportedly connects the refinery with the port facilities at Hu-lu-tao, 2/ 20 nm to the east, cannot be identified on photography. The Lien-shan Thermal Power Plant, Army Fuel Depot which furnishes electric power to the refinery is collocated with it. Those facilities at the refinery which were originally designed to produce synthetic oil are identified in the Basic Encyclopedia as the Lien-shan Gas Plant, New Physical Features The refinery area is irregularly shaped, measures about 7,500 by 3,500 feet, and occupies approximately 600 acres. The plant is secured on three sides by a fence, and shares common security with the Chin-hsi Chemical Plant on the fourth side. Operational Functions The major products of the refinery include straight-run, cracked, and blended gasolines, kerosene, diesel and fuel oil, and residuum. It possibly produces higher octane gasoline, hydrogen, and aromatics. The major refinery components found at this plant are multistage dis- tillation equipment for fractionation of crude oil, cracking units, and possibly reforming and gas processing equipment. Construction Status and Activity August 1962 -- The refinery appeared basically complete. Facilities included a shell still, a single stage distillation unit, two multistage distillation units, two thermal cracking units, a low temperature carboni- zation plant, a steam plant, and a thermal power plant. Construction was underway on the crude oil storage reservoirs in Areas J and U. All units appeared to be operating except the two multistage distillation units. -3- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 25X1 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 TOP SECRET RUFF May 1963 -- Construction had begun on the possible gas processing unit and several tanks were completed in storage areas Areas I and J. All of the processing units appeared to be operating. October 1963 -- Construction was underway on the U/I processing unit (Area D), the possible reform unit (Area E), the cooling facilities (Area A), and the transfer facilities in Area C. Two new tanks had been built in the intermediate and products storage area (Area I). The refinery appeared to be operating. January 1966 -- Two unidentified processing units (Areas L and M), the intermediate storage facilities (Area K), the possible reforming facilities, the gas processing facilities, and two crude oil storage reservoirs had been completed since 1963. In addition the conveyor serving the low tem- perature carbonization plant had been removed. All processing areas appeared to be operating with the exception-of the low temperature carboni- zation plant. October 1966 -- No significant changes were noted. All units appeared to be operating. March 1967 -- Partial coverage of poor quality showed that the roof of the retort building of the low temperature carbonization plant had been removed. The rest of the refinery was operating. May 1967 -- The U/I processing unit (Area D) appeared to be complete and in operation. December 1967 -- Partial coverage showed disruptive painting on several storage tanks in the thermal cracking and crude storage areas (Areas R and V), and several personnel trenches had been dug in the crude storage area. Those portions of the refinery covered appeared to be operating. November 1968 -- No major changes to the refinery were observed on small-scale photography. The processing units appeared to be operating. Facilities and Equipment The following table lists the functional areas and equipment within the refinery. All items are keyed to Figure 3. -4- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 TOP SECRET RUFF EQUIPMENT AND FACILITIES AT THE CHIN-HSI PETROLEUM REFINERY Area Description A Cooling Facilities B Unidentified Processing C Transfer Facilities Equipment* 4 Induced-draft cooling towers with 4 cells each I Compressor/pumping building I Water pond I Cylindrical tank I Miscellaneous buildinq I U/I processing unit I Pipe furnace I Possible compressor/control building 2 Rail-served trans loading buildings 3 Miscellaneous buildings I Loading rack (not shown on graphic) I Loading building served by 2 rail spurs 2 Pumping buildings 6 Miscellaneous buildings 34 Cylindrical tanks 25X1 25X1 D Unidentified Processing 8 U/I processing columns/reactors I Possible pipe furnace I Possible compressor/control building 4 Banks of possible heat exchangers/ cooling coils 6 Miscellaneous buildings 31 Cylindrical tanks 15 diam. 25 ft. 16 diami -5- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 TOP SECRET RUFF Area Description Equipment* E Possible Reforming I Possible reform unit with 8 columns/reactors 4 Petrochemical furnaces 2 Small banks of heat exchangers I Bank of accumulators I Compressor building 4 Miscellaneous buildings 5 Cylindrical tanks 3-20 ft. diam. 2-10 ft. diam. F Possible Gas Processing I Main processing unit with at least 3 columns enclosed by scaffolding 5 Possible reactors in a row I Possible small reactor 2 Banks cooling coils I U/I processing building with 2 possible fractionators/extractors 2 Compressor/pumping buildings 2 Control houses I Large monitor roofed building with associated bank of cooling coils and a control building G Crude Oil Distillation I Crude oil distillation unit with I Fractionator I Pipe furnace I U/I column I Bank of cooling coils I Compressor building I Pumping building 4 Unidentified buildings (one with two pieces of unidentified processing equipment) 29 Cylindrical tanks 23 diam. 25 ft. H Engineering and Support 10 Engineering and support type buildings Numerous smaller buildings (not shown on graphic) Large amounts of construction material stockpiled at various points throughout the area -6- TOP SECRET RUFF 25X1 25X1 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 25X1 TOP SECRET RUFF Area Description I Intermediates and Products Storage J Products Storage K Intermediates Storage L Unidentified Processing Equipment* 2 Pumphouses I Miscellaneous building feet II Cylindrical tanks 25 Cylindrical tanks 3 Cylindrical tanks I U/I processing unit with at least 14 U/I reactors/columns 2 Banks of heat exchangers/cooling coils I Large U/I processing building 4 Miscellaneous buildings M Unidentified Processing I U/I processing unit with 2 Processing columns I Petrochemical furnace I Compressor building I Bank heat exchangers/cooling coils/accumulators 3 U/I buildings I Water pond 5 Cylindrical tanks -7- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 TOP SECRET RUFF Area Description Equipment* N Lien-shan Gas Plant (New) a. Low temperature carbonization plant, currently being dis- mantled b. Reported location of gas puri- fication plant, current function unknown c. Incomplete water gas facility d. Probable former electrolysis building, current function unknown e. I Possible catalyst regeneration facility Former hydrogenation plant (main building Area L) currently an U/I processing building I Steam plant I U/I furnace 2 Pipe furnaces I Gasholder I Cooling tower and one spray pond probably used in support of power plant (Area 0) 12 Cylindrical tanks 8 diam. 40 ft. 4 diam. 20 ft. 9 Miscellaneous buildings 0 Lien-shan Thermal Power I Boilerhouse Plant Army Fuel Depot I Generator hall I Control house 2 Miscellaneous buildings 2 Venturi cooling towers I Spray pond 9 Cylindrical tanks 20 ft. diam. P Crude Oil Distillation 2 Multistage distillations units each having I Atmospheric distillation column I Vacuum distillation column 2 Probable re-distillation columns 2 Pipe furnaces 2 Banks heat exchangers I Compressor building I Control building 2 Additional distillation columns serve both' units -8- TOP SECRET RUFF 25X1 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 TOP SECRET RUFF Area Description Equipment* P Crude Oil Distillation - I Pipe furnace Continued ?5 Associated buildings 19 Cylindrical tanks Q Thermal Cracking I Thermal cracking unit with 2 Fractionating columns I Piece U/I equipment I Pipe furnace I Compressor building I Control building 6 U/I buildings 4 Pieces U/I processing equipment 2 Induced-draft cooling towers I .Water basin 13 Cylindrical tanks R Thermal Cracking. I Thermal cracking unit with 2 Fractionating columns 3 Pipe furnaces I Bank of heat exchangers/ cooling coils I Control building 3 Miscellaneous buildings S Former Crude Oil 6 Unidentified buildings Distillation 2 Cylindrical tanks 5 Horizontal tanks Area formerly contained I Shell still 2 Pipe furnaces 3 U/I buildings 2 Additional cylindrical tanks -9- TOP SECRET RUFF 25X 25X Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 TOP SECRET RUFF -10- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 25X1;1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 TOP SECRET RUFF .................................. AREA A uu o aqIy~~ 000000000 00 0IN 000000000 n RgA occoo~ r o acoa, ' 00 000 00 0. 0 00 10 0 J y~ 0 0 AREA D , .................~~.u,...........u.o......................... AREA F....... ARER E Q 0000 00 ? 0 0 IQ ono Fr? o nnt"id nn r Lwv S 3 AREA 00 AREAI n 00 0 ... 0 0 ?o 0 AREA K 00 .............. .......0......0......0....0... - II - TOP SECRET RUFF TRANSFER FACILITIES PROBABLY ABANDONED Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 .,.nun..nuuu.u '.n..nmm... " u CONVEYOR .u "^ ?? ; ? 00 ?O 00 0 Q 00 c~ AREA O ? O U U 00 0 o c 0 ??~: duo O ,~Mf_: AREA P 0..,...O0,,, LEGEND SEMIBURIED TANKS FLARE TOWER SEMIBIJ RIED RESERVOIR HORIZONTAL TANKS BUILDING STORAGE TANKS STACK WATER TREATMENT BASINS HEAT EXCHANGER. COOLING COILS OR ACCUMULATORS REFINERY EQUIPMENT PIPE STILLS/FURNACES 0 ?0 COOLING TOWERS A. COOLING FACILITIES B. UNIDENTIFIED PROCESSING C. TRANSFER FACILITIES D. UNIDENTIFIED PROCESSING E. POSSIBLE REFORMING F. POSSIBLE GAS PROCESSING G. CRUDE OIL DISTILLATION H. ENGINEERING/SUPPORT 1. INTERMEDIATES AND PRODUCTS STORAGE J. PRODUCTS STORAGE K. INTERMEDIATES STORAGE L. UNIDENTIFIED PROCESSING M. UNIDENTIFIED PROCESSING N. LIEN-SHAN GAS PLANT (NEW) 0. LIEN-SHAN THERMAL POWER PLANT ARMY FUEL DEPOT P. CRUDE OIL DISTILLATION Q. THERMAL CRACKING R. THERMAL CRACKING S. FORMER CRUDE OIL DISTILLATION T. ADMINISTRATION U. CRUDE STORAGE STRUCTURES UNDER CONSTRUCTION WALL FENCE RAIL LINE Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 Area Description T Administration U Crude Storage Equipment* 2 Administrative buildings I Motor pool building I Theater building 4 Barrack type buildings I Firehouse Numerous small support buildings 6 Cylindrical tanks I Semiburied reservoir 265 by 130 feet 2 Large tank excavations 2 Tanks in a state of disrepair *NOTE: All tank dimensions are approximate. -12- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 Approved TOP SECRET RUFF Map 15th RTS. US Air Target Chart 200, Sheet M0289-24HL, 3rd edition, Sep 66, Scale 1:200,000 (SECRET[- 1. Air Intelligence Information Report, State Operated Petroleum Plant No. 6, September 1956 (CONFIDENTIAL) 2. CIA. CRS Installation No. 9063468, Chin-hsi Petroleum Refinery, Lien-shan, China (SECRET) 3. DOD. IIR, ChiCom POL Industry Development, Report May 1968 (CONFIDENTIAL) Requirement -13- TOP SECRET.RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3 Top Secret Top Secret Approved For Release 2008/06/18: CIA-RDP79T00909A000500010017-3