LAN-CHOU PETROLEUM REFINERY LAN-CHOU, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T00909A000500010025-4
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
15
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 18, 2008
Sequence Number: 
25
Case Number: 
Publication Date: 
June 1, 1969
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79T00909A000500010025-4.pdf1.52 MB
Body: 
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 Top Secret DIRECTORATE OF INTELLIGENCE Industrial Facilities (Non-Military) Basic Imageiy Interpretation Report Lan-chou Petroleum Refinery Lan-chou, China DATE COPY PAGES Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 TOP SECRET RUFF CENTRAL INTELLIGENCE AGENCY Directorate of Intelligence Imagery Analysis Service Lan-chou Petroleum Refinery 48SUQ7809781 .36-06-58N 103-38-16E 15th RTS. US Air Target Chart 200, Sheet 0.38.3-22HL, 2nd edition, May 64, Scale 1:200,000 This report presents a detailed imagery-derived analysis of the Lan-chou Petroleum Refinery from September 1959 through August 1968. The Lan-chou Petroleum Refinery was built with Soviet aid and became operational before the Soviet withdrawal in 1960. Since that time a lubri- cating oil plant, several unidentified processing units, and many additional storage facilities have been constructed. This refinery produces straight- run, cracked and blended gasolines, kerosene, diesel and fuel oils, lubri- cating oil, wax, asphaltic materials, and coke. Included in this report are a detailed line drawing and a photograph of the refinery, mensuration of storage facilities, a discussion of physical features and operational functions, a construction chronology, and reference data. TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 IUP SECRET RUFF - 2- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 TOP SECRET. RUFF `z;X~ The Lan-chou Petroleum Refinery is located 9.5 nautical miles (nm) west-northwest of the center of Lan-chou on the south bank of the Huang Ho (Yellow River), in Kansu Province. The Lan-chou Chemical Fertilizer Plant is located to the west of the refinery and the Lan-chou Petrochemical the northwest. The Lan-chou Thermal Power Plant (Hsi-ku) is located to the northwest and is connected to the refinery by steam lines. The refinery is served by a spur from the Lan-chou to Hsiang-tang-chou rail line. Although the. refinery is located on a river, shipments by water are probably very limited because there are no transfer facilities near the river and there is no well-defined river channel. The construction of the refinery.began in April of 1956 with Soviet aid. Construction of the primary refining units was originally expected to be completed in 1961. However, at least limited production ha.d begun by 1959. The major sources of crude oil are the Tsa.idam., Chiu-chuan, and North Shensi Basins.l/ Physical Features The Lan-chou Petroleum Refinery, which is secured-by a wall, measures approximately 8,800 by 3,700 feet and occupies about 750 acres. Operational Functions This refinery contains a large number of diverse processing units. It produces straight-run, cracked and blended gasolines, kerosene, diesel and fuel oils, lubricating oil, wax, asphaltic materials, and coke. Status and Activity September 1959 -- Most of the processing equipment including the catalytic and thermal cracking units, the three crude distillation units, and the light ends unit appeared to be complete and operational. The delayed coking unit was in the mid-stages of construction, the lubricating oil plant was in the early stages of construction, and tankage representing approximately 50 'percent of the current crude and finished products storage capacity was in place. June 1962 -- The delayed coking unit had been completed and construc- tion was continuing at the lubricating oil plant and in the storage area. Construction was begun on an unidentified processing facility (Area A), and additions were made to the packing and shipping areas. -3- TOP. SECRET. RUFF 25X1 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 TOP SECRET RUFF September 1963 -- Most activity was centered in the possible steam plant, the unidentified processing facilities, and the administration and support areas (Areas A thru D) where construction was continuing. Additions were also made in the storage area and the lubricating oil plant. October 1964 -- The possible steam plant (Area B) appeared complete and was connected by steam line to the completed unidentified processing facility (Area A) and to the main processing areas of the refinery. The lubricating oil plant appeared operational and an additional fractionating column and pipe furnace were added to one of the crude distillation units (Area L). March 1966-August 1968 -- Only minor changes were made to the facili- ties during this time period. However, the small scale and poor quality of the coverage impeded a detailed analysis of the refinery. On coverage of September 1959 the refinery was in operation as evi- denced by heavy rail traffic at the shipping facilities and smoke from the multistage distillation unit (Area L). On all subsequent coverage there were several indicators of production activity at the refinery. The lubricating oil plant which was under construction in September 1959, was in operation when observed on coverage of October 1964. The delayed coking unit was operational when observed on coverage of June 1962. Facilities and Equipment The following table lists the functional areas and facilities within the refinery. FACILITIES AND EQUIPMENT AT THE LAN-CHOU PETROLEUM REFINERY (ITEMS KEYED TO FIGURE 3) Area Description Equipment* A Unidentified Processing 4 U/I processing buildings I U/I processing equipment unit I pipe furnace 19 Storage/support buildings 34 Cylindrical storage tanks 2 diam. 25 ft. 24 diam. 20 ft. 8 diam. 15 ft. II Horizontal storage tanks 6 length 30 ft. 5 length 25 ft. -4- TOP SECRET RUFF 25X1 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 TOPSECRET, RUFF Area Description Equipment* B Possible Steam Plant and I Possible steam plant U/I Processing I U/I processing equipment unit I Processing building 3 Storage/support buildings 2 Cylindrical storage tanks diam. 25 ft. C Administration and Support D Unidentified Processing E Crude Oil and Products Storage 2 Administration buildings 20 Storage/support buildings 8 U/I processing buildings 21 Storage/support buildings 23 Miscellaneous buildings 18 Horizontal tanks 6 length 40 ft. 12 length 35 ft. 8 Semiburied storage tanks I 5 2 diam. diam. diam. 160 f 125 f 60 ft t. t. . 388 Cylindrical sto rage tanks 16 diam. 80 ft . 6 diam. 60 ft . 3 diam. 55 ft . 29 diam. 50 ft . 8 diam. 45 ft . 52 diam. 40 ft . 10 diam. 35 ft . 32 diam. 30 ft . 171 diam. 25 ft . 52 diam. 20 ft . 9 diam. 15 ft . G Unidentified Processing I Row of at least 7 columns I Row of at least 4 columns At least 3 U/I processing equipment units At least 3 possible pipe furnaces I Compressor building I Possible compressor building I Control building At least 23 support buildings 2 Cylindrical storage tanks diam. 20 ft. 4 Possible cylindrical storage tanks, -5- TOP SECRET,-..RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 TOP SECRET RUFF Area Description Equipment* H Light Ends 2 Column groupings (3 columns each) I Compressor building 4 Processing buildings 2 Cylindrical storage tanks diam. 15 ft. I Moving Bed Catalytic One area of processing equipment Cracking including reactor, regenerating kiln, catalyst hopper, and fractionator I Pipe furnace 7 Miscellaneous buildings J Thermal Cracking I Row of 7 columns 2 Pipe furnaces 2 Compressor buildings I Support building K Support 8 Support buildings 25X1 lox] L Crude Distillation I Multistage crude distillation unit with 8 Columns I Bank heat exchangers/accumulators 3 Pipe furnaces I Building with 7 desalting drums I Compressor building I Storage/support building M Crude Distillation N Possible Treating 0 Probable Dewaxing 2 Distillation units each with I Line of columns 2 Banks of heat exchangers/accumulators 2 Pipe furnaces I Compressor building 2 Processing tanks diam. 10 ft. 2 Processing buildings 10 Processing tanks diam. 10 ft. 14 Cylindrical storage tanks 8 diam. 20 ft. 6 diam. 10 ft. 2 Probable dewaxing units each with I Chilling and filter building with 6 attached treatment towers 2 U/I processing units each with I Processing building U/I processing equipment -6- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 TOP SECRET RUFF Area Description P Unidentified Processing I Distillation unit with I Fractionating column I Pipe furnace I Compressor building 4 Cylindrical storage tanks diam. 25 ft. 3 Miscellaneous buildings 2 U/I processing units each with I Compressor/processing building Undetermined number of small processing tanks 4 Miscellaneous buildings (I) Deasphalting Section 2 Banks processing equipment I Pipe furnace I Compressor building 5 Miscellaneous buildings 34 Cylindrical storage tanks 25X1 25X1 TOP SECRET RUFF Water and Products Storage 3 Cylindrical storage tanks di.am. 25 ft. 3 Water storage basins 3 Horizontal storage tanks length 30 ft. I Support building R Products Storage Area Equipment* 2 Storage/support buildings 6 Cylindrical storage tanks I diam. 80 ft. 5 diam. 25 ft. 36 Horizontal storage tanks 3 length 90 ft. 8 length 50 ft. 14 length 40 ft. II length 30 ft. S Distillation 2 Fractionating columns I Pipe furnace I Bank of heat exchangers/accumulators I Building with 4 probable desalting drums 5 Support buildings T Unidentified I Building with row of attached columns (number not determined) 18 Miscellaneous buildings U Lubricating Oil Plant Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 TOP SECRET RUFF Area Description Equipment* 9 diam. 40 ft. 2 diam. 25 ft. 4 diam. 20 ft. 19 diam. 15 ft. I Cluster processing equipment I Pipe furnace 4 Miscellaneous buildings 22 Cylindrical storage tanks 7 diam. 25 ft. 15 diam. 15 ft. (3) Dewaxing Section I Chiller and filter building 2 Storage buildings 9 Cylindrical storage tanks diam. 20 ft. (4) Clay Treatment Section V Delayed Coking I Bank of processing equipment I Pipe furnace Undetermined number of processing drums/horizontal tanks 4 Miscellaneous buildings 29 Cylindrical storage tanks 2 diam. 25 ft. 27 diam. 15 ft. I Bank of coking drums I Fractionator I Bank of possible extractors I Pipe furnace I Compressor building I Shipping building with conveyor 16 Miscellaneous buildings I Cylindrical storage tank diam. 25 ft. W Water Treatment 3 Induced draft cooling towers I Possible cooling tower 7 Storage/support buildings 6 Water treatment basins I Pumphouse X Support 13 Support buildings Y Treatment, Blending, Packaging building with 10 batch Packing, Storage and agitators/holding tanks Shipping 3 Banks processing equipment I Pipe furnace 28 Storage/support buildings -8- TOP SECRET RUFF 25X1 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 25X1 TOP SECRET RUFF Area Description Equipment* 3 Cylindrical storage tanks I diam. 60 ft. 2 diam. 15 ft. Z Shipping and Storage 3 Loading racks serving 2 tracks each (not shown on graphic) 6 Control/support houses I Pumphouse 13 Storage/support buildings 4 Semiburied cylindrical storage tanks *NOTE: All tank dimensions are approximate. -9- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 TOP SECRET RUFF TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 AREA A B C D E F G H I 1 K L M N DESCRIPTION U/I PROCESSING POSSIBLE STEAM PLANT and U/I PROCESSING ADMINISTRATION and SUPPORT U/IPROCESSING CRUDE OIL and PRODUCTS STORAGE WATER BASIN U/I PROCESSING LIGHT ENDS MOVING BED CATALYTIC CRACKING THERMAL CRACKING SUPPORT CRUDE DISTILLATION CRUDE DISTILLATION POSSIBLE TREATING PROBABLE DEWAXING KEY TO ANNOTATIONS P U/I PROCESSING Q WATER AND PRODUCTS STORAGE R PRODUCTS STORAGE AREA S DISTILLATION T. UNIDENTIFIED U LUBRICATING OIL PLANT I. DEASPHALTING SECTION 2. SOLVENT REMOVAL SECTION 3. DEWAXING SECTION 4. CLAY TREATMENT SECTION DELAYED COKING WATER TREATMENT X SUPPORT Y TREATMENT,BLENDING, PACKING, STORAGE AND SHIPPING Z SHIPPING AND STORAGE DESCRIPTION d 0 000o000 ooooo0 10000 00] ^ oao000 Mmunuuumuwuwumuum: C saWD 70? 0 O Li ~J WIN ae,J ~ o ?m. 80a ~ l~ u u ? ;:0 ^ o?ti0 o W a o0d^? 0 muuuunuumuuwiwuuuwmummmmuuuuuumiumummmuuuwuumuuu.uuuwuwun0 I....uum nuumuu 00000000000 00000 0000 0000 000000 ? 00000 0000 000 ? 0000? 0000 00000000 0000000000 00000 00000 O O 00 0000 0 00 00000 00 .00000 00000 000000 00000 0000000 0 0 00000 0000 000 00000 0000000 00000 000 00 00000 00000 00 00 0000 ' n' ?? 00000 0000 00000 00111111 000000 00 00000 00 000 0000 W ooO 0 0 0000000 0011 oo IIIIII 000000 a o 0 0 00 0 00000 0 000 a 00000 00 0 E d) n' 0G 1H ??o j J _ Oi p o O8 ? p ,mummnSuwmiuuw.tu uumwuumunu:mnuumumu:mumnmu nmr.uunuIVT null nuupnun,,,.,.f........ ......??.?p????' ---------.?-.--------C _ OLD : ?~? 00 V 12?000?,~^4 ?00000 ?000?00? 0000 l ' _ _ ? ~ ~ ~ ~0 ? 0 - - -- -- N_? ~ ~ S c ~ .??00000 0000 -- o 4?~Z:o0ooO ? 000? ^ _ - e ~ fl II jD poo n ~ ? I"1 nn i ?o ea sd- f~- o m--- n 0oooDl I 00 ooii 1I oo Q i m ?p o?? ;o m D o e TOP SECRET RUFF LJoup ?^ NOTE: THIS DRAWING HAS BEEN MADE FROM UNRECTIFIED PHOTOGRAPHY. TOP SECRET RUFF 0000 0000 0000000 00 0000 /10000 00 000 000000 0000 /10000 :000 000 000 III LEGEND -4- RAILROAD ~? PROCESSING EQUIPMENT J BUILDING IU1J HEAT EXCHANGERS 0 TANK -W- WALL COOLING TOWER SEMI-BURIED STORAGE TANKS Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 iur ALKt I KW Map . 15th RTS. US Air Target Chart 200, Sheet 0383-22HL, 2nd edition, May 64, Scale 1:200,000 (SECRET/CONTROLLED DISSEM) Document 1. DOD. Requirement Lan Chou Refinery, January 1968 (CONFIDENTIAL) Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4 Top Secret Approved For Release 2008/06/18: CIA-RDP79T00909A000500010025-4