SA-ERH-TU PETROLEUM REFINERY AND STORAGE SA-ERH-TU, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T00909A000500010026-3
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
13
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 18, 2008
Sequence Number: 
26
Case Number: 
Publication Date: 
June 1, 1969
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79T00909A000500010026-3.pdf1.01 MB
Body: 
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 Top Secret .DIRECTORATE OF INTELLIGENCE Industrial Facilities (Non-Military) Basic Imagery Interpretation Report Sa-erh-tu Petroleum Refinery and Storage Sa-erh-tu, China Df\1L COPY PAGES Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 TOP SECRET. RUFF CENTRAL INTELLIGENCE AGENCY Directorate of Intelligence Imagery Analysis Service Sa-erh-tu Petroleum Refinery and Storage UTM COORDINATES 51TXM614532 GEOGRAPHIC COORDINATES 46-32-OON 125-06-OOE WAC-P I C No25X1 0283-118 MAP REFERENCE 2nd RTS. USATC Series 200, Sheet M0283-7HL 2nd edition April 1968, Scale 1-200-000 This report provides a detailed imagery-derived analysis of Sa-erh-tu Petroleum Refinery and Storage based on small-scale photography from November 1961 through November 1968. Surveying of the Sa-erh-tu site was completed by December 1962. Construction of the refinery occurred in three phases, each requiring approximately. two years. The facilities added during each phase went into operation upon completion. The refinery was in partial operation by November 1964 and was observed complete and in full operation on photography of November 1968. The refinery is capable of producing straight-run, cracked, and blended gasolines, diesel and fuel oils, coke and gaseous hydrocarbons. The report includes a detailed line drawing and photograph of the refinery, mensuration of tanks, a chronology of construction and operational status, and reference data. TOP SECRET RUFF 25X1 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 Not Required Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 25X1 TOP SECRET RUFF -2- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 TOP SECRET RUFF Sa-erh-tu Petroleum Refinery and Storage is located in the southeastern section of Heilungkiang Province in the center marsh area of the Sung-liao Plain. The refinery is about 5 nautical miles (nm) southeast of the town of Sa-erh-tu which was developed to support the exploration work and the subsequent drilling and development program in the surrounding oil fields. Crude oil for charging the refinery is brought in from the adjacent fields by pipeline. Products and crude in excess of that used locally are transported from Sa-erh-tu by truck and rail tank cars. This excess is probably shipped to refining facilities in eastern China. The principal rail line serving this area is between La-ma-tien and Har-erh-pin. A network of primary roads also serves the plant. Plants and facilities which are associated with the refinery include a heat and thermal power plant, a field storage and loading facility, a possible oil processing plant, and a possible petrochemical plant. Physical Features The refinery is large, occupying a rectangular area which measures approximately 5,845 by 3,190 feet and encompasses 455 acres. The refinery and the storage areas are wall secured. Operational Functions Based upon the identification of the equipment now complete and in operation, the products of this refinery are straight-run, cracked, and blended gasolines, diesel and fuel oils, coke, and gaseous hydrocarbons. Construction Status and Activity Construction of the Sa-erh-tu Petroleum Refinery began about November 1961, and the refinery was first seen in production in November 1964. The refinery was constructed in three phases following completion of surveying. The facilities added during each pbase went into operation upon completion. The refinery was observed in limited operation on all photography from November 1964 until November 1968 when it was first observed in full operation. The following is a generalized history of the refinery, covering the planning stage and three phases of development which followed. No detailed -3- TOP SECRET RUFF 25X1 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 TOP SECRET RUFF chronological accounting of the construction of the various items of equip- ment or facilities is presented in this report; however, specific items are noted to illustrate significant points of development in the complex. November 1961 - December 1962 -- Construction support facilities were built and the survey of the refinery site appeared to be completed. December 1962 - November 1964 (Ist Phase) -- The first phase of development was completed with the installation of the crude distillation unit, the probable thermal cracking unit, and the processing equipment in the unidentified area. These were.in operation in November 1964 as evidenced by emissions from the thermal cracking unit and the cooling towers. Smoke was observed coming from the flare tower for the first time on imagery of November 1964. Also present were most of the crude, intermediate, and product storage tanks and the water treatment area. November 1964 - March 1966 (2nd Phase) -- The second phase of development was completed with the construction of the delayed coking unit and two possible multistage distillation units (crude distillation area). The two loading facilities were completed and rail cars were observed for the first time on photography of November 1965. The water treatment area was expanded with the addition of five semiburied tanks. The support area and remaining storage tanks were completed. The facilities added during this phase of development appeared to be in operation on photography of January 1966, as indicated by emissions from the delayed coking area, the crude distillation area, and the cooling towers. March 1966 - November 1968 (3rd Phase) -- The third phase was completed, and the newly installed possible reforming units were in operation on coverage of November 1968, as evidenced by emissions from the associated cooling towers. Two additional basins were under construction in the water treatment area, and the six semiburied tanks had been completed. Three trains were observed within the refinery's loading facility on photography of November 1968. Facilities and Equipment The following table lists the functional areas and equipment within the refinery. All items are keyed to Figure 3. SUMMARY OF EQUIPMENT AND FACILITIES AT THE SA-ERH-TU PETROLEUM REFINERY AND STORAGE Area Description Equipment A Loading Facility 3 rail served loading racks (not shown on graphic) 18 storage/support buildings -4- TOP SECRET RUFF 25X1 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 TOP SECRET RUFF Description Equipment Crude Oil Storage 8 support buildings 43 cylindrical tanks Support/Storage Products and Intermediates Handling and Storage Products and Intermediates Handling and Storage Possible Reforming 46 support/storage buildings Undetermined number of storage tanks (not measurable) 6 support buildings 54 cylindrical tanks I settling basin 6 buildings ?4 cvlindrical tanks I possible reforming unit bank of 3 reactors/columns bank of processing equipment 3 pipe furnaces I possible reforming unit bank of reactors/columns 3 pipe furnaces 7 support buildings I possible multistage distillation unit 5 columns 3 pipe furnaces I possible multistage distillation unit 3 columns 2 pipe furnaces I control building 6 support buildings 2 cylindrical tanks diam. 30 ft. Products and Intermediates 2 support buildings Storage 18 cylindrical tanks -5- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 TOP SECRET RUFF Description Crude Distillation Probable Thermal Cracking Equipment 2 fractionators 2 pipe furnaces I building 3 columns (probable reactor, flash tower, and fractionator) pipe furnaces support buildings 2 2 U/I Processing 2 I I 2 Support 4 10 I 3 Delayed Coking I 2 I 5 7 I I I I Area of Expansion fractionators large petrochemical or DeFlorez type furnace compressor building support buildings banks of cooling towers buildings spray pond cylindrical tanks diam. 30 ft. delayed coker with 2 drums banks of cooling towers shipping building support buildings cylindical tanks 3 diam. 30 ft. settling basin basin U/C basin bank of cooling towers 13 support buildings 6 semiburied tanks I cylindrical tank I flare tower 5 support buildings -6- TOP-SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 IUP SECRET RUFF Area Description P Loading Facility Equipment 2 loading racks (not shown on graphic) 12 support buildings 20 cylindrical tanks -7- TOP SECRET RUFF 2 semi buried tanks 13 tank bases diam. 30 ft. Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 TOP SECRET RUFF 25X1 LJ/\ I -8- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 TOP SECRET RUFF 0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 111111111JI111111111111111111111 l 1111111116 111111111111111111111111; n4 19 C) no 000 13 99 .,00 c 0 O 0 o ? o oa o :111111111111111uu111111111111111111111F o 0 ~~ ? Q 0 ?1~~? 0 O unwd mmmnmwu~nuuunuu.......... v ................ n U 3 El U u 0000 ^~ =? M ~O19 po V- 711111111111% IIII 0 00000 000 00000 88 00 000 00000 00 00 00 00 ??0 0 _ n _c 000 8 77, 00 00 00 00 00 00 00 00 00 -W II nuuu111u111111111111111111 t\- O B rw-'1-7 N0 TOP SECRET RUFF LEGEND BUILDING FURNACE TANK COOLING TOWERS SEMIBURIED TANK WALL SETTLING BASIN OR SPRAY POND PROCESSING EQUIPMENT STACK RAILROAD FLARE TOWER TANK BASES KEY TO ANNOTATIONS DESCRIPTION LOADING FACILITY CRUDE OIL STORAGE SUPPORT/STORAGE PRODUCTS AND INTERMEDIATES HANDLING AND STORAGE PRODUCTS AND INTERMEDIATES HANDLING AND STORAGE POSSIBLE REFORMING CRUDE DISTILLATION PRODUCTS AND INTERMEDIATES STORAGE CRUDE DISTILLATION PROBABLE THERMAL CRACKING U/I PROCESSING SUPPORT DELAYED COKING WATER TREATMENT AREA OF EXPANSION LOADING FACILITY Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 TOP SECRET RUFF Maps and Charts 2nd RTS. US Air Target Chart Series 200, Sheet M0283-7HL, 2nd edition, 1:200.0 00 (SECRET 1. CIA. PIR 75011, Oil Field and Refinery Complex, Sa-erh-tu, China, July 1966 (TOP SECRET RUFF) INew Oilfield in North East (Map), 27 May 1963 3. State. A-742. China's Taching Oilfield: Elcipse of an Industrial Model, 27 August 1968 (SECRET) 4. Sa-erh-tu (46? 35'N, 125? 00'E) An-ta-chan '25X1 -chi-ha-erh (47 22'N, 123? -,)/-E), China, (46? 24'N, 125? 19'E) Chi 6 November 1963-(SECRET 25X1 25X1 Requirement EXSUBCOM - BR-N/002-69 -I0- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3 Top Secret Top Secret Approved For Release 2008/06/18: CIA-RDP79T00909A000500010026-3