MAJOR ELECTRIC POWER PLANTS LIAONING PROVINCE, CHINA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP79T00909A000900010006-1
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
19
Document Creation Date:
December 28, 2016
Document Release Date:
October 6, 2008
Sequence Number:
6
Case Number:
Publication Date:
February 1, 1970
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 513.27 KB |
Body:
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Top Secret
DIRECTORATE OF
INTELLIGENCE
Industrial Facilities
(Non-Military)
Basic Imagery Interpretation Report
Major Electric Power Plants
Liaoning Province, China
DATE FEBRUARY 1970
COPY
PAGES 19 11 B
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
TOP SECRET RUFF
CENTRAL INTELLIGENCE AGENCY
Directorate of Intelligence
Imagery Analysis Service
This report, based on late 1968 and 1969 photography, updates the pre-
vious Basic Imagery Interpretation Briefs and Reports on 15 of the 16 major
electric power plants in Liaoning Province, northeast China. The sixteenth
plant, the Supung-dong Hydro Power Plant, has not been seen on interpretable
photography since the previous report. The cutoff date for information in
this report is September 1969.
Since 1968, a double-unit boiler has been installed and was seen operating
at the Shen-yang Thermal Power Plant Tieh-hsi. Two cooling towers were removed
from the Chin-chou plant between November 1967 and September 1968. No construc-
tion or dismantling has been observed at the other 13 plants since the previous
reports.]
On the latest photographic coverage, II of the plants were observed in
operation. The Shen-yang Thermal Power Plant Northeast and the Chin-chou plant
did not appear to be in operation. The Kai-yuan plant was not completed and
appearedlto be inactive. The Fu-shun Dam and Hydro Power Plant appeared to be
operating in August but not in November 1968 when it was last observed.
TOP SECRET RUFF
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79TOO909AO00900010006-1
TOP-SECRET RUFF
-2-
TOP SECRET RUFF
Approved For Release 2008/10/06: CIA-RDP79TOO909AO00900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
TOP SECRET RUFF
This report presents information on the current status of 15 of the
major electric power plants in Liaoning Province and describes any changes
since the previous reports.
The following list of the major electric power plants in Liaoning
Provinc e is keyed to Figure I.
1. An-shan Heat and Thermal Power Plant Steel Plant.
2. Chin-chou Thermal Power Plant Synthetic Fuels Plant.
3. Fou-hsin Thermal Power Plant.
4. Fu-shun Dam and Hydro Power Plant Ta-huo-fang.
5. Fu-shun Heat and Thermal Power Plant Liao-ning.
6. Fu-shun Thermal Power Plant Shale Oil Plant No. 2.
7. Fu-shun Thermal Power Plant Tai-kan-ton.
8. Huan-jen Hydro Power Plant Hun-chiang.
9. Kai-yuan Thermal Power Plant Ching-ho.
10. Lu-ta (Dairen) Thermal Power Plant No. I Amanogawa.
II. Lu-ta Heat and Thermal Power Plant No. 2 Kan-ching-tzu.
12. Pen-chi Heat and Thermal Power Plant No. 3 Steel Plant.
13. Pen-chi Thermal Power Plant No. 2 Steel Plant.
14. Shen-yang Thermal Power Plant Northeast.
15. Shen-yang Thermal Power Plant Tieh-hsi.
16. Supung-dong Hydro Power Plant and Dam Suiho.
Requirement
COM II REX NO I
Support Number 420230
-3-
TOP SECRET RUFF
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
TOP SECRET RUFF
UTM COORDINATES
51TUF415542
GEOGRAPHIC COORDINATES
41-07-57N 121-05-52E
MAP REFERENCE
15th RTS. USATC, Series 200, Sheet 0289-19HL, 2nd ed, Mar 63, Scale 1:200,000
(SECRET)
BASIC DESCRIPTION
Thereihas been no construction at the Chin-chou Thermal Power Plant since
November 1967, the date of the latest photography used in the previous report.
The partially completed southern section of the boilerhouse remained unchanged.
Between November 1967 and September 1968 the two remaining cooling towers were
removed, but the plant is still considered to be operational.
The plant was not in operation when observed in September 1968 or May 1969.
No smoke or other vapors were seen emanating from the plant. It was last observed
in operation in January 1965.
CIA.: BCS. 13/0051/69, Chin-chou Thermal Power Plant (Synthetic Fuels Plant),
October 1968,1 ITOP SECRET RUFF)
-5-
TOP SECRET RUFF
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
TOP SECRET RUFF
INSTALLATION OR ACTIVITY NAME
Fu-shun Dam; and Hydro Power Plant Ta-huo-fang
UTM COORDINATES GEOGRAPHIC COORDINATES
51TWG9113721; 41-52-50N 124-05-29E
MAP REFERENCE
USATC, Series 200, Sheet M0290-IIHL, 4th ed, Jan 66, Scale 1:200,000
(SECRET
LATEST IMAGERY USED
No changes have been observed at the Fu-shun Dam and Hydro Power;.Plant
Ta-huo-fang since February 1968; the date of the latest photography used in the
previous report.
The plant appeared to,be in operation in August 1968. Water turbulence
was observed in the tailrace. In November 1968 the plant was inactive as evi-
denced by the absence of water in the tailrace.
CIA.' BCS 13/0030/69, Fu-shun
September 1968, (TOP SECRET RUFF)
-7-
TOP SECRET RUFF
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Dam and Hydro Power Plant (Ta-huo-fang),
25X1
25X1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
TOP SECRET RUFF
Fu-shun Heat and Thermal Power Plant Liao-ning
UTM COORDINATES GEOGRAPHIC COORDINATES
MAP REFERENCE
USATC, Series 200, Sheet M0290-IIHL, 4th ed. Jan 66. Scale I:200_nnn
No changes have been observed at the Fu-shun Heat and Thermal Power Plant
Liao-ning since February 1968, the date of the latest photography used in the
previous report.
The plant was operating in November 1968. Heavy smoke was observed emanat-
ing from at least two of the three stacks.
TOP SECRET RUFF
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
25X1
25X1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
TOP SECRET RUFF
INSTALLATION OR ACTIVITY NAME
Fu-shun Thermal Power Plant Shale Oil Plant No.
UTM COORDINATES GEOGRAPHIC COORDINATES
51TWG874315 41-49-45N 124-02-55E
MAP REFERENCE
25X1
LJ/\ I
USATC, Series 200, Sheet M0290-IIHL 4th ed, Jan 66 Scale 1:200,000 25X1
(S ECRE 25X1
BASIC DESCRIPTION
No changes have been observed at the Fu-shun Thermal Power Plant Shale
Oil Plant No. 2 since February 1968, the date of the latest photography used
in the prev ious report.
The plant was operating in November 1968. Smoke was observed emanating
from the stack.
Document
CIA.! BCS 13/0026/69, Fu-shun Thermal. Power Plant (Shale Oil Plant No. 2)
September 1968, (TOP SECRET RUFF)
-9-
TOP SECRET RUFF
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
iur StUt I Kurr
INSTALLATION OR ACTIVITY NAME
Huan-jen Hydro Power Plant Hun-chiang
UTM COORDINATES
? 51TYF022710
MAP REFERENCE
USNOO. USATC, Series 200, Sheet M0290-17HL, 4th ed, Apr 68. Scale 1:200.00
(SECRET
LATEST IMAGERY, USED
observed ins the tailrace.
No changes have been observed at the Huan-jen Hydro Power Plant Hun-chiang
since January 1968, the date of the latest photography used in the previous re-
port.
The plant appeared to be in operation in May 1969. Water turbulence was
Document
CIA. RCS 13/0072/69, Huan-jen Hydro Power Plant (Hun-chiang), December 1968,
-II-
TOP- SECRET RUFF
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
iur JtL t I KUrr
Kai-yuan Thermal Power Plant Ching-ho
UTM COORDINATES
51TWH955107
GEOGRAPHIC COORDINATES
42-32-31N 124-09-31E
MAP REFERENCE
USNOO. USATC, Series 200, Sheet M0290-6HL 4th ed. Feb
(SECRET
25X1
25X1
The Kai-yuan Thermal Power Plant Ching-ho remains incom lete. No signifi-
cant construction has been observed at the site since and it 25X1
appears to be inactive.
CIA. BCS 13/0036/69, Kai- uan Thermal Power Plant Ching-ho, September
1968,1 KTOP SECRET RUFF
TOP SECRET RUFF
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
TOP SECRET RUFF
INSTALLATION OR ACTIVITY NAME
Lu-ta Thermal Power Plant No. I Amanogawa
UTM COORDINATES
51SUD775065
(SECRET 25X1
15th RTS. USATC, Series 200, Sheet M0381-9HL, 3rd ed, May 67, Scale 1:200,000
MAP REFERENCE
BASIC DESCRIPTION
No changes have been observed at the Lu-ta Thermal Power Plant No. I
since June~1968, the date of the latest-photography used in the previous report.,.,
The pilant was oper
two of thelfour stacks.
CIA.; BCS 13/0087/69, Lu-ta Thermal Power Plant.1 Amanogawa, January 1969,
-13-
TOP. SECRET RUFF
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
TOP SECRET RUFF
Lu-ta Heat and Thermal Power Plant No. 2 Kan-ching-tzu
UTM COORDINATES
51SUD813128
GEOGRAPHIC COORDINATES
38-57-34N 121-37-38
15th RTS. USATC, Series 200, Sheet M0381-10HL, 3rd e
No changes have been observed at the Lu-ta Heat and Thermal Power Plant
No. 2 since September 1968, the date of the latest photography used in the pre-
vious report.
The plant was operating in August 1969. Smoke was observed emanating
from two of the five stacks. The status of the other three stacks, which were
obscured by smoke, could not be determined.
CIA. RCS 13/0110/69, Selected Chinese Power Plants, May 1969,
(TOP SECRET RUFF)
-14-
TOP SECRET RUFF
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Iq
Next 3 Page(s) In Document Denied
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
GEOGRAPHIC COORDINATES
40-27-22N 124-57-46E
MAP REFERENCE
548th RTS.; USATC, Series 200, Sheet M0290-22HL, 4th ed, Sep 66, Scale 1:200,000
I (SECRET
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
TOP SECRET RUFF
INSTALLATION OR ACTIVITY NAME
Supung-dong Hydro Power Plant and Dam Suiho
LATEST IMAGERY USED
25X1
2 DA"I
Sinceithe previous report, the Supung-dong Hydro Power Plant has been seen
only once,lon poor-quality photography of May 1969. The quality of the photo-
graphy precluded analysis of the plant.
CIA.' RCS 13/0110/69, Selected Chinese Power Plants, May 1969,
(TOP SECRET RUFF)
-19-
TOP SECRET RUFF
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1
Top Secret
Top Secret
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1