MAJOR ELECTRIC POWER PLANTS LIAONING PROVINCE, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T00909A000900010006-1
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
19
Document Creation Date: 
December 28, 2016
Document Release Date: 
October 6, 2008
Sequence Number: 
6
Case Number: 
Publication Date: 
February 1, 1970
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79T00909A000900010006-1.pdf513.27 KB
Body: 
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Top Secret DIRECTORATE OF INTELLIGENCE Industrial Facilities (Non-Military) Basic Imagery Interpretation Report Major Electric Power Plants Liaoning Province, China DATE FEBRUARY 1970 COPY PAGES 19 11 B Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 TOP SECRET RUFF CENTRAL INTELLIGENCE AGENCY Directorate of Intelligence Imagery Analysis Service This report, based on late 1968 and 1969 photography, updates the pre- vious Basic Imagery Interpretation Briefs and Reports on 15 of the 16 major electric power plants in Liaoning Province, northeast China. The sixteenth plant, the Supung-dong Hydro Power Plant, has not been seen on interpretable photography since the previous report. The cutoff date for information in this report is September 1969. Since 1968, a double-unit boiler has been installed and was seen operating at the Shen-yang Thermal Power Plant Tieh-hsi. Two cooling towers were removed from the Chin-chou plant between November 1967 and September 1968. No construc- tion or dismantling has been observed at the other 13 plants since the previous reports.] On the latest photographic coverage, II of the plants were observed in operation. The Shen-yang Thermal Power Plant Northeast and the Chin-chou plant did not appear to be in operation. The Kai-yuan plant was not completed and appearedlto be inactive. The Fu-shun Dam and Hydro Power Plant appeared to be operating in August but not in November 1968 when it was last observed. TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79TOO909AO00900010006-1 TOP-SECRET RUFF -2- TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79TOO909AO00900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 TOP SECRET RUFF This report presents information on the current status of 15 of the major electric power plants in Liaoning Province and describes any changes since the previous reports. The following list of the major electric power plants in Liaoning Provinc e is keyed to Figure I. 1. An-shan Heat and Thermal Power Plant Steel Plant. 2. Chin-chou Thermal Power Plant Synthetic Fuels Plant. 3. Fou-hsin Thermal Power Plant. 4. Fu-shun Dam and Hydro Power Plant Ta-huo-fang. 5. Fu-shun Heat and Thermal Power Plant Liao-ning. 6. Fu-shun Thermal Power Plant Shale Oil Plant No. 2. 7. Fu-shun Thermal Power Plant Tai-kan-ton. 8. Huan-jen Hydro Power Plant Hun-chiang. 9. Kai-yuan Thermal Power Plant Ching-ho. 10. Lu-ta (Dairen) Thermal Power Plant No. I Amanogawa. II. Lu-ta Heat and Thermal Power Plant No. 2 Kan-ching-tzu. 12. Pen-chi Heat and Thermal Power Plant No. 3 Steel Plant. 13. Pen-chi Thermal Power Plant No. 2 Steel Plant. 14. Shen-yang Thermal Power Plant Northeast. 15. Shen-yang Thermal Power Plant Tieh-hsi. 16. Supung-dong Hydro Power Plant and Dam Suiho. Requirement COM II REX NO I Support Number 420230 -3- TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 TOP SECRET RUFF UTM COORDINATES 51TUF415542 GEOGRAPHIC COORDINATES 41-07-57N 121-05-52E MAP REFERENCE 15th RTS. USATC, Series 200, Sheet 0289-19HL, 2nd ed, Mar 63, Scale 1:200,000 (SECRET) BASIC DESCRIPTION Thereihas been no construction at the Chin-chou Thermal Power Plant since November 1967, the date of the latest photography used in the previous report. The partially completed southern section of the boilerhouse remained unchanged. Between November 1967 and September 1968 the two remaining cooling towers were removed, but the plant is still considered to be operational. The plant was not in operation when observed in September 1968 or May 1969. No smoke or other vapors were seen emanating from the plant. It was last observed in operation in January 1965. CIA.: BCS. 13/0051/69, Chin-chou Thermal Power Plant (Synthetic Fuels Plant), October 1968,1 ITOP SECRET RUFF) -5- TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 TOP SECRET RUFF INSTALLATION OR ACTIVITY NAME Fu-shun Dam; and Hydro Power Plant Ta-huo-fang UTM COORDINATES GEOGRAPHIC COORDINATES 51TWG9113721; 41-52-50N 124-05-29E MAP REFERENCE USATC, Series 200, Sheet M0290-IIHL, 4th ed, Jan 66, Scale 1:200,000 (SECRET LATEST IMAGERY USED No changes have been observed at the Fu-shun Dam and Hydro Power;.Plant Ta-huo-fang since February 1968; the date of the latest photography used in the previous report. The plant appeared to,be in operation in August 1968. Water turbulence was observed in the tailrace. In November 1968 the plant was inactive as evi- denced by the absence of water in the tailrace. CIA.' BCS 13/0030/69, Fu-shun September 1968, (TOP SECRET RUFF) -7- TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Dam and Hydro Power Plant (Ta-huo-fang), 25X1 25X1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 TOP SECRET RUFF Fu-shun Heat and Thermal Power Plant Liao-ning UTM COORDINATES GEOGRAPHIC COORDINATES MAP REFERENCE USATC, Series 200, Sheet M0290-IIHL, 4th ed. Jan 66. Scale I:200_nnn No changes have been observed at the Fu-shun Heat and Thermal Power Plant Liao-ning since February 1968, the date of the latest photography used in the previous report. The plant was operating in November 1968. Heavy smoke was observed emanat- ing from at least two of the three stacks. TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 25X1 25X1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 TOP SECRET RUFF INSTALLATION OR ACTIVITY NAME Fu-shun Thermal Power Plant Shale Oil Plant No. UTM COORDINATES GEOGRAPHIC COORDINATES 51TWG874315 41-49-45N 124-02-55E MAP REFERENCE 25X1 LJ/\ I USATC, Series 200, Sheet M0290-IIHL 4th ed, Jan 66 Scale 1:200,000 25X1 (S ECRE 25X1 BASIC DESCRIPTION No changes have been observed at the Fu-shun Thermal Power Plant Shale Oil Plant No. 2 since February 1968, the date of the latest photography used in the prev ious report. The plant was operating in November 1968. Smoke was observed emanating from the stack. Document CIA.! BCS 13/0026/69, Fu-shun Thermal. Power Plant (Shale Oil Plant No. 2) September 1968, (TOP SECRET RUFF) -9- TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 iur StUt I Kurr INSTALLATION OR ACTIVITY NAME Huan-jen Hydro Power Plant Hun-chiang UTM COORDINATES ? 51TYF022710 MAP REFERENCE USNOO. USATC, Series 200, Sheet M0290-17HL, 4th ed, Apr 68. Scale 1:200.00 (SECRET LATEST IMAGERY, USED observed ins the tailrace. No changes have been observed at the Huan-jen Hydro Power Plant Hun-chiang since January 1968, the date of the latest photography used in the previous re- port. The plant appeared to be in operation in May 1969. Water turbulence was Document CIA. RCS 13/0072/69, Huan-jen Hydro Power Plant (Hun-chiang), December 1968, -II- TOP- SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 iur JtL t I KUrr Kai-yuan Thermal Power Plant Ching-ho UTM COORDINATES 51TWH955107 GEOGRAPHIC COORDINATES 42-32-31N 124-09-31E MAP REFERENCE USNOO. USATC, Series 200, Sheet M0290-6HL 4th ed. Feb (SECRET 25X1 25X1 The Kai-yuan Thermal Power Plant Ching-ho remains incom lete. No signifi- cant construction has been observed at the site since and it 25X1 appears to be inactive. CIA. BCS 13/0036/69, Kai- uan Thermal Power Plant Ching-ho, September 1968,1 KTOP SECRET RUFF TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 TOP SECRET RUFF INSTALLATION OR ACTIVITY NAME Lu-ta Thermal Power Plant No. I Amanogawa UTM COORDINATES 51SUD775065 (SECRET 25X1 15th RTS. USATC, Series 200, Sheet M0381-9HL, 3rd ed, May 67, Scale 1:200,000 MAP REFERENCE BASIC DESCRIPTION No changes have been observed at the Lu-ta Thermal Power Plant No. I since June~1968, the date of the latest-photography used in the previous report.,., The pilant was oper two of thelfour stacks. CIA.; BCS 13/0087/69, Lu-ta Thermal Power Plant.1 Amanogawa, January 1969, -13- TOP. SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 TOP SECRET RUFF Lu-ta Heat and Thermal Power Plant No. 2 Kan-ching-tzu UTM COORDINATES 51SUD813128 GEOGRAPHIC COORDINATES 38-57-34N 121-37-38 15th RTS. USATC, Series 200, Sheet M0381-10HL, 3rd e No changes have been observed at the Lu-ta Heat and Thermal Power Plant No. 2 since September 1968, the date of the latest photography used in the pre- vious report. The plant was operating in August 1969. Smoke was observed emanating from two of the five stacks. The status of the other three stacks, which were obscured by smoke, could not be determined. CIA. RCS 13/0110/69, Selected Chinese Power Plants, May 1969, (TOP SECRET RUFF) -14- TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Iq Next 3 Page(s) In Document Denied Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 GEOGRAPHIC COORDINATES 40-27-22N 124-57-46E MAP REFERENCE 548th RTS.; USATC, Series 200, Sheet M0290-22HL, 4th ed, Sep 66, Scale 1:200,000 I (SECRET Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 TOP SECRET RUFF INSTALLATION OR ACTIVITY NAME Supung-dong Hydro Power Plant and Dam Suiho LATEST IMAGERY USED 25X1 2 DA"I Sinceithe previous report, the Supung-dong Hydro Power Plant has been seen only once,lon poor-quality photography of May 1969. The quality of the photo- graphy precluded analysis of the plant. CIA.' RCS 13/0110/69, Selected Chinese Power Plants, May 1969, (TOP SECRET RUFF) -19- TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1 Top Secret Top Secret Approved For Release 2008/10/06: CIA-RDP79T00909A000900010006-1