COST OF CONSTRUCTION AND CAPITAL INVESTMENT IN SELECTED PLANTS OF THE SOVIET AIRCRAFT INDUSTRY: GOR'KIY AIRFRAME PLANT ORDZHONIKIDZE NO. 21

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T01049A003700160002-2
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
12
Document Creation Date: 
November 17, 2016
Document Release Date: 
July 21, 2000
Sequence Number: 
2
Case Number: 
Publication Date: 
August 6, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79T01049A003700160002-2.pdf349.51 KB
Body: 
.00 V, Approved For ReleasT0/0& R[kTRDP79T01049A003700160002-2 I 00 NO FOREIGN DISSEM TCS No. 4791/65 .00 6 August 1965 .00 ~ Copy No. of 75 1 53 .40 COST OF CONSTRUCTION AND CAPITAL INVESTMENT IN SELECTED PLANTS OF THE SOVIET AIRCRAFT INDUSTRY: GOR'KIY AIRFRAME PLANT ORDZHONIKIDZE NO. 21 CIA/ RR EP SC 65-16 (ORR Project No. 33. 4692A) Handle Via Indicated Controls TALENT-KEYHOLE CENTRAL INTELLIGENCE AGENCY Office of Research and Reports NO FOREIGN DISSEM Approved For Release/08SEITDP79T01049A003700160002-2 Approved For Release 2000/08/15: CIA-RDP79T01049A003700160002-2 This document contains Information affecting the national security of the United States within the meaning of the espionage laws U. S. Code Title 18, Sections 793 and 794. The law prohibits its transmission or the revelation of its contents in any manner to an unauthorized person, as well as its use n any manner prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized to receive information in the designated control channels. Its security must be maintained in accordance with regulations pertaining to TALENT-KEYHOLE Control System. Approved For Release 2000/08/15: CIA-RDP79T01049A003700160002-2 ApA W OIL Qk'T11` I 7W9e~700160002-2 TCS-4791/65 This publication is an engineering estimate of the cost of replace- ment of Gor'kiy Airframe Plant Ordzhonikidze No. 21 and is one of a series of cost estimates of aircraft facilities. It is intended for use as one basis of industrial and production analysis. In establishing the cost of replacement, a construction/capital-investment ratio common to con- struction costs was used in all computations. ApRR- l F rARRXeL?fi&LV CF54orRP141Qjn4b700160002-2 TOP SECRET CHESS RUFF aPpg~APw~~~; Dw WRW 00160002-2 TCS-4791/65 Page Summary and Conclusions . . . . . . . . . . . . . . . . I. Introduction . . . . . . . . . . . . . . . . . . . . II. Methodology . . . . . . . . . . . . . . . . . . . . B. Climatic and Soil Data . . . . . . . . . . . . . . C. Physical Facilities . . . . . . . . . . . . . . . D. Cost of Construction and Capital Investment ... . . . . 1 . 3 . 4 . 4 . 4 . 4 Appendix Source References . . . . . . . . . . . . . . . . . . . . 7 Table USSR: Capital Investment and Cost of Construction of Gor'kiy Airframe Plant Ordzhonikidze No. 21, Pre-1941 - January 1965 . . . . . . . . . . . . . . . . . . . . . . . . . . 6 USSR: Gor'kiy Airframe Plant Ordzhonikidze No. 21 following page . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Ap -` LEcf I.R .fF4 e1 .7% %J I %J f@~9 700160002-2 TOP SECRET CHESS RUFF 'P900AIt TOP ,'EG ' 'R4"TA ffil V&9' 3700160002-2 TCS-4791/65 COST OF CONSTRUCTION AND CAPITAL INVESTMENT IN SELECTED PLANTS OF THE SOVIET AIRCRAFT INDUSTRY: GOR'KIY AIRFRAME PLANT ORDZHONIKIDZE NO. 21*x Summary and Conclusions The total cost of construction of Gor'kiy Airframe Plant Ordzhonikidze No. 21 is estimated to be US $49 million, or 28 million rubles. ** Based on the estimated relationship between the cost of construction and total fixed capital assets for this industry, ",'c* total capital investment (which includes cost of construction) at this plant is estimated to be US $111 mil- lion, or 62 million rubles. Expansion of the original plant, built in 1931-33, was noted in 1955. Construction activity has continued to the present time with major empha- sis on the machine /workshop and assembly types of structures. At pre- sent, activity is noted on two structures. The taxiway connecting the plant area with the Gor'kiy/Sormovo Airfield is estimated to have cost $600, 000. The estimates and conclusions in this publication represent the best judgment of this Office as of 15 July 1965. < Throughout this publication, dollar values are given in 1963 US dollars, and ruble values are given in new rubles expressed in 1955 prices. Dollar values in 1963 prices have been deflated to 1955 prices by multiplying 1963 prices by a factor of 0. 792, and then converted to new rubles in 1955 prices at the 1955 ruble-dollar ratio of 0.71 ruble to US $1 for all industrial construction. The factor for the direct conversion of 1963 dollars to 1955 rubles is 0. 562. **-,< For a detailed methodology, see source 1/. (For serially numbered source references, see the Appendix. ) Ap g EFVIA" lA - ~q 1J :(.~dA S 7 T' 2 700160002-2 TOP SECRET CHESS RUFF ApR~dKRSI.~~I,~?f 3EI~f~ TCS-4791/65 Gor'kiy Airframe Plant Ordzhonikidze No. 21 is located approximately 3. 7 nautical miles (nm) west of the Oko River and 2 nm southwest of the Volga River in the Sormovo district of Gor'kiy. The area within the plant boundarywall is approximately 198 acres. The plant is connected by taxi- way to the Gor'kiy/Sormovo Airfield, located about 1 nm to the west, and is served by highway and rail. Originally built in 1931-33, it suffered only slight damage during World War II. In 1945 the Lavochkins Special Design Bureau, which had been connected with the plant, was moved to Moscow. From 1945 to 1955 there were no major additions to the plant. In 1955, construction activity was apparent and has continued in varying degrees to the present. 2/ The plant layout and the identification of the major buildings, by type, used as a basis of estimating construction costs in this publication are shown in the chart. * The share of the total building cost found to apply to the different types of buildings is shown in the following tabulation: Type of Building Percentage Share of Total Cost of Buildings Engineering/administration** 10 Forge/foundry 2 Machine/workshop 27 Assembly ?+8 Storage 5 Miscellaneous/unidentified 8 25X1 D * Unless otherwise indicated, identification and dimensions of the build- ings are from published CIA/PID reports and from reports of this Office. * * An area equal to 4 percent of the roof area was used in costing this function. E 700160002-2 ApRW6E~F9r j 1. r?9 fMn1uJP VE i-f6NTR!~P7S~ R 1cm TOP SECRET CHESS RUFF 'U49R+700160002-2 02-2 Approved %NPf?A2%64-t6TA_ffl#1ff4AftLY TCS-47 91/65 II. Methodology Construction costs in this publication are based principally on 1963 unit costs prevailing in an area of the US having climati-- conditions analogous to Gor'kiy. B. Climatic and Soil Data 4/ The climate of Gor'kiy is roughly similar to that of Duluth, Minnesota, being characterized by long cold winters, short warm sum- mers, and moderate precipitation and snow cover. Plant No. 21 is located on flat to slightly rolling terrain less than 50 feet above the VolgaRiver water level. For installat:ons having foundations less than 10 feet deep, conditions below the level of frost (absolute maximum of 6 feet) range from fair to. good.. For installations requiring deeper (more than 10 feet) excavations, conditions range from poor to fair. The water table is always less than 25 feet. C. Physical Facilities 5/ The major buildings are of steel frame and sheet or brick con- struction. Roofs vary both in design (gable, flat, and monitor) and in material (concrete, slab, or sheet metal). D. Cost of Construction and Capital Investment The cost of construction of those items in the category of build- ing construction has been estimated on the basis of the volumetric unit cost for the particular types of structures. Heavy construction costs are .estimated on the basis of plant size, work force, construction sea- son, and foundation conditions. Capital investment was determined from the total cost of con- struction for each period of time. The amount of construction work as a share of fixed capital assets is known for a number of Soviet industries as of. 1 January 1956. The share of construction in fixed capital assets used in this publication is the same as that of the Soviet autor.nobile -4- Approved For Release 2000/08/15: CIA-RDP79TO1049AO03700160002-2 HANDLE VIA TALENT-KEYHOLE CONTROL SYSTEM ONLY TOP LF,R F,TFTF,.S R TTFF 25X1 D Approved For Release 2000/08/15: CIA-RDP79TO1049AO03700160002-2 Approved For Release 2000/08/15: CIA-RDP79TO1049AO03700160002-2 ApiRi N'DL'V'IA~ 7V9~700160002-2 TCS-4791/65 industry, or 44. 7 percent. 6/ Capital investment and cost of construc- tion, distributed over time, are shown in the table. Available data do not warrant or allow the precise cost estimate that is inherent to competitive US industry. Assumptions, the validity of which cannot be checked, have been made on the basis of experience. The measurements used for the determination of building volume are con- sidered to be the most complete to date; however, data on facilities normally built by heavy construction forces are scarce. On the basis of a belief that errors in the assumptions will tend to balance out, the prob- able range of error of plus or minus 25 percent has been estimated. * Data are not available on the ratio of the cost of construction to fixed capital assets for the Soviet aviation industry.. Of the data available, those relating to the automotive industry are estimated to be most appli- cable. Although the reported figure of 44. 7 percent has been used, it should not be construed to mean that the figure is accurate to a tenth of a percent. ApR4AK .EqfiRG' -tpla~ R2 LE S fP07?T'WLQA98g. '700160002-2 TOP SECRET CHESS RUFF Approved For Release 2000/08/15: CIA-RDP79TO1049AO03700160002-2 T CS-4791/65 USSR: Capital Investment and Cost of Construction of Gor'kiy Airframe Plant Ordzhonikidze No. 21 J Pre-1941 - January 1965 January 1941 - August 1960 - January 1962 - August 1963 = Thousand Thousand Pre-1941 July 196C December 1961 July 1963 January 1965 1963 US New Rubles b/ Capital investment c/ 65,828 8,653 12,226 16,749 7,179 110,635 62,177 Of which: Construction 29,425 Buildings 28,106 Engineering/ administration 2,754 Forge/foundry 756 Machine/workshop 7,815 Assembly 13,250 Storage 2,339 3,868 5,465 7,487 3,209 49,454 27,793 3,820 5,408 7,451 3,175 47,960 26,954 443 590 590 540 4,917 2,763 756 425 1,185 1,563 1,503 1,000 13,066 7,343 2,000 3,000 5,000 23,250 13,066 2,339 1,315 192 255 358 1,635 3,632 2,041 48 57 36 34 1,494 840 W -J Z Miscellaneous/ unidentified 1,192 a. Fur piu?puses of esiimaUiun and cumparisuu, Lie dai.a shown here have nui been ruwided. The dai,a, however, are be- lieved to be accurate as to general magnitude. b. Expressed in 1955 Prices. c. Derived from costs of construction. Approved For Release 2000/08/15: CIA-RDP79TO1049AO03700160002-2 Approv T R A Nj HANDLE V ' RUFF 7%%@10A9 3(700160002-2 TCS-4791/65 APPENDIX SOURCE REFERENCES 25X1A 1. CIA. CIA/RR EP SC 64-16, Cost of Construction and Capital Investment in the Dnepropetrovsk Missile Development and Production Center, 30 Oct 64, p. 8-11. TS CHESS RUFF/NO FOREIGN DISSEM. 2: CIA. OCR/FIB Summary Sheet 7010710, 1 Apr 60. S. 3. 4. CIA. CIA/RR GB 65-8, Climate and Soil Data on Gor'kiy, USSR, Feb 65. S. 5. CIA. OCR/FIB Summary Sheet 7010710, 1 Apr 60. S. 6. CIA. CIA/RR EP SC 64-16 (1, above). 25X1A ApproHXT4 gff ~e ~ 0/ flfbiFI W~T@tg O .QU160002-2 TOP SECRET CHESS RUFF 0-4 Approved For ReleasT?PO/0S'tDP79T01049A003700160002-2 J .00 I, .00 .40 I, .10 .000 .00 .40 .00 Approved For Release/08IDP79T01049A003700160002-2