AUTOPAL PLANT, NOVY JICIN: PRODUCTION/MANAGEMENT/LAYOUT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000500340005-6
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
7
Document Creation Date: 
December 22, 2016
Document Release Date: 
November 17, 2010
Sequence Number: 
5
Case Number: 
Publication Date: 
February 9, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000500340005-6.pdf241.53 KB
Body: 
Sanitized Copy Approved for Release 2010/11/17: CIA-RDP80-00809A000500340005-6 U.S. Officials Only 0NFJDZ:' l-'IAL CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT SUBJECT Autopal Plant, Novy Jicin: Production/lannrement/ I,e.yau t Of THE UNITED STATES. WITHIN 7HEWEANINR Of TITLE 11. SECTIONS 741 MID 714. or THE?U.S, COOt. AS MENDED. ITS TRMISNISDI,.. OR Rt1t? Iab 3. 50X1-HUM DATE D I STR. FCB '# NO. OF PAGES '7 NO. OF ENCLS. SUPP. TO REPORT NO. plant is located on Suvnr?ov Street In Navy Jicin. The side facing the r--L F,l,;.reny is protected by a wooden fence 150 cm high.. Otherwise it is surrounded by a brick wall, two m higgh, toprlld by barbed wire. /'-see Enclosure (A) for layout diagram of the plant] "The plant, employs about 700 workers, of whom 250 are women. -- ------- - 5. "The plant produces reflectors [or cans at the rate of 7000 per month. It produces month) , and radiators for C;.e~ rtclslc:`~ak R-rmy trucks (250 per month). It also vro- dhc~s all red stop-lights fabo:~t 1000 ,lxr month. Sep Enclosure (B) for layout of the press workshops. 7 "Tho i'rar/e for the radiators for army tanks is made out of a 3 mm iron alloy h+'et that- will not rust. The .-.mall container of the .radiator is about 10 cm vide at the top and 13 cm wile at. the bottom. The tank is 12 cm high. The whole radiator is 15 cm long, 00 an hi ---h and 15 cm wide. fho pipes for the radiator are rectangular and are made out. of a brass material 0.5 mm thick. The pipe open- ings are 15 mm long and L mm wit'. The pipes are in groups of four, 200 pipes to Z rfidint,or. t'he horizontal plait.- are made out of copper abou.*. 0.3 rim thick and t.rc: :et about 2 mm apart. 50X1-HUM Sanitized Copy Approved for Release 2010/11/17: CIA-RDP80-00809A000500340005-6 Sanitized Copy Approved for Release 2010/11/17: CIA-RDP80-00809A000500340005-6 US CO;:i IG i; x'11 L 7. "The plant receives all kinds uiraw matar.ials iron iioravske Ostrava. _'_' -_. J. . .. 8. "The finished .,...,.a....+.. -I a t t - - c _y a n.oprivnice and scree enterprise in iiluipr Lis] j- "As of July 1953 the five-year economic program had been fulfilled at this factory 90%. Management 10. As of July 1953: Manager Production Director President of the Workers' Council Master in press section Security Officer Deputy President of the Workers' Council Jaroalav Sommer Miroslav Kirich (feu Hornk? Wanes 1.. "The director 7-2'or production '.7 receives (after the currency reform of 30 May 53) 3500 crowns net per mono:. A master or foreman receives 1500 crowns per month. A plumber receives 1000 crowns net per month. An ordinary worker in the mechanical press section receive; 700 crowns net per month, after de- ductions of about 100 crowns. Morale 1:='? "The working morale in the p:ar''. s bad hecause of the continual increase of work norms. 73. "The plant is guarded three -r_+.q keei.ir:: who are members of the workers' militia. At night they use dog:.. Military Motor De of hh u',.o )at >lan+. is a de of for militar vehicles. 7777 uepvt. l a guarded ~-b-~ two soldiers of the regular Czechoslovak army, i71e are ar,:.c ri with I.istols. f se, Enclosure (A) for location diagram of this depot." end - ENCLOSURE (A): Layout Diagram of the Autopal National Enterprise, Novy Jicin, and the Military Depot, with Legend II : Diagram of the Press Workshops of the Autopal Plant with LCgend C : Sketch of the Tank Radiator and Pipe Line of the Radiator ME-nufactured by Autopal for the CSR Army US OFFIUTAIS DULY C OIT- IDENTIAL 50X1-HUM 1 50X1-HUM Sanitized Copy Approved for Release 2010/11/17: CIA-RDP80-00809A000500340005-6 M F Sanitized Copy Approved for Release 2010/11/17: CIA-RDP80-00809A000500340005-6 N u /G fl Aul.Qpal.,nutior:al cncr,rprisc, tlovy Jicin M i t i teiy 4iepo'.C for mi 1 i Lary vehicles Sanitized Copy Approved for Release 2010/11/17: CIA-RDP80-00809A000500340005-6 Sanitized Copy Approved for Release 2010/11/17: CIA-RDP80-00809A000500340005-6 ENCLOSURE (A) Page -2-- US OFFICIALS ONLY/CONFIDENTIAL/ al. Gatekeepers' room 2. Offices. 30 x 8 m. One-floor building. 3. Canteen, 30 x 10 M. One-floor Luilding. 5. Depot of tin (sic7, aa15 m, b20m, c*10 m, d=6 in, one-floor Chimney 6. Shipping department 10 7. Toolmaker's worknhep, 20.x 10 m 8. Workshop, 15 x 6 m, one-floor building. 0 Oree^. Ouse and gcaideu iof Uue factory kitchen. 10. Workshops equipped with presses, 16 x 15 m, one-floor. 11. 13. the end of 1953, 20 x 10 m, one-floor. Garages: two Tatra 3.5 ton trucks, one tractor, one one Tatra 57-A. The house of the former factory owner, converted to 14. Gatekeeper's room. 15. Workshop, production of radiators. 16. Plumber'e workshop and lathe section, 17. Pond. Military de of 10. Garage an depot, 15 x 7 m. 19. Garage and depot, 10 x 6 m. 20. Garage and depot, 80 x 15 m. 21. Wooden depot and garage, 15 x 4 22. Gatekeeper's room.' j~~~?j~~ Sanitized Copy Approved for Release 2010/11/17: CIA-RDP80-00809A000500340005-6 F Sanitized Copy Approved for Release 2010/11/17: CIA-RDP80-00809A000500340005-6 ENCLOSURE (B) Page floor ]5.- 14 4,- CtU1?r 1 ' r( Pre.... r:orl:sh,);r:1 of the :utop] I1unL Sanitized Copy Approved for Release 2010/11/17: CIA-RDP80-00809A000500340005-6 Sanitized Copy Approved for Release 2010/11/17: CIA-RDP80-00809A000500340005-6 ENCLOSURE (B) rJS OFFICIALS OTTLY/CONFIDEVfIAL' Page -2- `i . Legenc1 for Enclosure (B) Autopal Press Workshops A. Groundfloor 1. Depot for the precc workers 2. WC 3. WC 4. Depot for iron sheet; 5. Press section 6. Galvanizing section equipped ?.rith 10 reservoirs ~sic~. 7. Machinery station for hydraulic presses 8. Small cleaning section 9. Big cleaning section 10. Control room for the cleaning section 11. Galvanizing section equipped with 8 reservoirs 32. Store of finished products 13. Corridors to the elevators. l). Office of the master 15. Press workshop 16. Cleaning of the 'ready made frames' 17. Transformers 18. Elevator 19. 12 presses 20. Small workshop 21. Electric furnaces, 2 m long 15 m wide 22. Hydraulic press, product. of the Fritz Muller firm, Eslingen, 6 m high 2 m wide 3 m deep. 23. 6 presses 21t. 4 mechanical hammers 25. 4 presses, working under a pressure of 30-60 tons. 26. Compressor for the hydraulic presses. 27. Compressor for the hydraulic presses. 28. Tank for compressed air 29. A machine for the hydraulic presses 30. Polishing section 31. Polishing section 32. 12 excentric Csic Prences 33. A small workshop B.Firs+. Floor 1. Offices 2. WC 3. Drawing section 4. Assembling of rei'lec tors 5. Depot of finished rel'lcctors 6. Assembling o!' reIi0-:;.,,'.2 7. Office of the technical manat,er 8. Varnishing; workshop 9. Production of mirrors !'u- t e reflectors 10. Technical office 11. Elevator 1. 2. 3. 7. WC Depot oi' old mat(!rial. at.c rc ; e . L Dressing room Dress1 r. ; room Dressing room Luu is used) Cleanind of the re t' :. ,r:; Depot of the worker=' .^ilitis. 'lil'iuar; rifles. ammunition are stored here. Elevator boiler house US 0)FFICLAIS OP1LY/'i' 1.'i''li>Fl;'~'LI?.i Sanitized Copy Approved for Release 2010/11/17: CIA-RDP80-00809A000500340005-6 Sanitized Copy Approved for Release 2010/11/17: CIA-RDP80-00809A000500340005-6 ENCLOSURE (C) CONFIDENTIALAIS Or'FICIMs ONLY %A, k c_co%y -Fr the C-SZ Army __u 11 11 1 11 o -- fAe- Yaj,e or Sanitized Copy Approved for Release 2010/11/17: CIA-RDP80-00809A000500340005-6