BUILDUP OF ROAD NET

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000500820158-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 19, 2016
Sequence Number: 
158
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000500820158-3.pdf108 KB
Body: 
I DEC F 1951 ~-?" Approved For Release 2025 f 1/03: CIA-RDP80-00809AO00500820158-3 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT Buildup of Road Net 25X1 DATE D I STR. 3 SvW/E 954 NO. OF PAGES 2 NO. OF ENCLS. SUPP. TO REPORT NO. 1. The roads running from the USSR cross the Hungarian border to the Danube basin were greatly improved during the last year 59597 and through the improvement and connection of many roads previously used only for local purposes, the road net was much enlarged. Especially important improvements were made in the exit,, ?rom the Carpathians, practically all of'which were concreted. 2. Line Lvov-Uzhorod-Zfrhony-Nyiregyhgza-Debrecen-Szolnok-Budapest. This line has been made eight m broad, with a 50 cm-foundation that can take the heaviest tanks. throughout its whole length. The reconstruction of the road bridge across the Tisza at Ztfhony is important. Between Uzhorod and Zifhony the road runs briefly across Czechoslovak territory; communication along this line was interrupted for years by the lack of the Zdhony bridge. The reconstruction of the bridge has, again,made rapid communication between Lvov and Budapest possible. 3. Line Lvov-Stryj Mukachevo B rehovo Vgs~rosnamgny-Hyiregyhgza Tokai-Szerencs- Miskolc. The lie between Lvov and Stryj or, Soviet territory as )een made into a concrete, road, eight m broad. Between Berehovo and Nyiregyhaza a new concrete road has been built. and thArfb is nrAnaratinn for a nPw bridge at Vffailfrosnamenv_ 4. Between these two main lines cross-connections have been built. One runs from the Mukacevo-Berehovo section by way of Cop to the right bank of the Tisza, where it meets the other main road in the Uzhorod-Zghony area, and another runs from Berehovo across the new bridge over the Tisza to M4ndok. 25X1 lhu tepnrt II (of dte use tgcfiln the USA of the Intelligence components of the Departments of Agltnda Indicated abo'e. it is n-t to be transmitted eiersen %ohmlt 118 eoncuttowe of the HgIS'natlttS office thrnuati the Asabrant D rector of the Office of Collection and Dssemin.:? . I All nr pust nI Ehe .nnLe?T. bilcations raai.incp /over.t*aa distaibutiot providing the publ;at.cn bcus the cAve 25X1 I D ? STATE -. A ed 1nr RPIPacp )nnA/ii/nA ? (^IA-Rf'lp"_flnnaAnnnrnnPon'I THIS DOCU.LNT CONTAINS Ih.O.YATIOS AFFECTING THE NATIONAL OF THE UNITCO STATES. .I THIN THCNLANING OF TITLE I. SECTIONS ]SS AND TS.. OF TH! U 1. CODE. AS AMENDED. 'TS T. AN SWISSION OS SETS. LATIOS OF ITS CONTENTS TO ON A(CCI?T ST AN UNAUTHORIZED PERSON 15 T N OF THIS - ? .T .1 1.. THE IF I I F Approved For Release 2006/11/03: CIA-RDP80-00809A000500820158-3 SECRET -2- 5. Line Lvov-Stanislav ?Delat?agi~ TataronZs-ir..7, then through the Tisza valley to the west and southwest. In general] this road goes along the right bank of the Tisza as far a: Vylok.. At Vylok it crosses the river and splits in two directions. One of the new roads here runs to Debrecen by way of Bateszalka, the other way of Satu 'flare in Rumanian territory, also to Debrecen. 6. Debrecen is connected with Miskolc by a new road. Thi_??. goes by say of Polgar, where a new road bridge is built across the Tisza. The seccs.on from Debrecen to Fuzesabony has been rebuilt into a first class highway, and serves as.a feeder to the main line Budapest-Szolnok-.Debrecen. 7. From Debrecen the road mentioned in para. 5 runs by way of Berettyoujfalu- $orosladany-Gyoma-Kunszentmerton-Tiszaug-Kecskemet-Durafoldvdr to Szekesfehervar. The sections Koroslads(ny-Oyoma and Dune foldvar-Szekesfehervac_have beer, rebuilt. From Korusladeny to Bekesesaba a new connecting road has been built, providing a through connection from Debrecen to Szeged by way of Bekescsaba and !dako. From Bekescsaba another first.class highway runs eastward through Rumania along the line Salonta-?Hare-Oradea pare-Vales lui Mihai to the USSR. From Bekescsaba westward runs a main road through Oroshaze-Szentes-Csongrad-Xiskunfglegyhaza-Bags (where there is a new bridge)-Pecs-Dombovar. 8. All the highways mentioned have been given a standard width of 8 m. In building these reads elcava.tiou is carried down to 45 on.. The base is 15 cm oC?erushed ? rock on which another 15 cm of cinders is laid before rolling. On top of this 5 cm of fine sand and stone splinters are .laid to correct any unevenness, and the road is rolled again. On this surface the concrete is poured. For each cubic meter of concrete 320 kg of cement is used. Concrete is poured In sections 4 by 10 m. These sections or blocks are separated by three cm of asphalt. 9. On either side of the road are?.?droina.gor:ditches 50 cm deep and 70 cm wide, with a bank 40 om?wide between them and the concrete. 10. The-work is usually carried or. simultArously in several sections, road workers being recruited-from the nearby villagba. There are also a good. marry eompulsory laborers building roads.