DNEPROSTROI SEWAGE CONSTRUCTION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600060190-5
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
5
Document Creation Date: 
December 22, 2016
Document Release Date: 
August 17, 2011
Sequence Number: 
190
Case Number: 
Publication Date: 
July 20, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600060190-5.pdf222.89 KB
Body: 
Sanitized Copy Approved for Release 2011/08/18: CIA-RDP80-00809A000600060190-5 CLASSIFICATION CONFIDENTIAL -7 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT CD NO. COUNTRY USS[t SUBJECT Dneprostroi Sewage Construction PLACE ACQUIREL DATE ACQUIRED DATE OF It 50X1-HUM; DATE DISTR. . o Jul 1954 NO. OF PAGES 7 NO. OF ENCLS. (LISTED BELOW', 50X1 -HUM SUPPLEMENT TO REPORT NO. etruction Section for nes &YA Sewage Syatet. of the Dnsprostroi ). This organization had as its in purpose the construction of water lines and eewagr systems fer the entire industrial area. As the various plants were cospleted the administrative set up changed. The plants were trans- ferred tc the exploiting agency. An organization known as MM (Section of Capital Construction) was for m& which * 50X1-HUM work and which c letsd the work lamed. The Dnsy~'os arse, 'built tpon the left bank of the epsr iver, was about three kilo- mo'erc wide and 15 kilometer3 long. The following plants were built on ,as site: a. The aluminum combine plant (associatel with the electrode plant). _a ferro-alloys plant. c. The bl st furnace plant (four furnaces). d. The cheaical-coke plant. a. the Martin-furnace plant. f. T:.o plant snnu actt. ing tool and die steel. g. The sheet rolling plsxt. h. The magassiua plant. i. The fireproof brick plant (for bleat furnace linings). organization known as PNK (Con- Sanitized Copy Approved for Release 2011/08/18: CIA-RDP80-00809A000600060190-5 Sanitized Copy Approved for Release 2011/08/18: CIA-RDP80-00809A000600060190-5 CONFIDENTIAL -2- The repair shop. k. The vocational school for repair mechanics and foundry workers. The following plants, located outside of the area proper, were to be serviced with water and. sewage systems as well as the above plants: a. Plant #29, manufacturing airplane motors. b: `The locomotive manufacturing plant. c. The silicon-carbide plant. Besides the above plants the watt--r and sewage system was to serve the needs of the so-called "Great Zaporoshe , the new portion of Zaporoshe which was also known as.the "socialized. city". 2. PVX was also responsible for the construction of pumping stations which were to be used to raise water from the Dnepr River and pump it into the water system. This water was purified and chlorinated for drinking purposes. PVK also had the job of constructing the main sever which carried the sewage to a disposal plant located at the village of Novo Nikolaivka where the sewage was treated and later passed on into the lower Dnepr. 3. The water wins for the area were laid in pairs or in three lines, ?4l1 placed parallel. The maims Aare-A. of cast iron with w 4twten,ofora 1,200 2* Elbow were of the same material. The pipes werer.lei. together with lead. There vere.four types of pipe used for the branch lines, as follows: a. Cast iron pipes, 100 m/m in diameter, held together with concrete. b,. Cast iron pipes sealed with rubber washers. c. Iron pipes joined by welding. d. nobestos and concrete pipes with flexible points. The loints *ere asbestos sleeves lined with rubber rings, 4. For swags disposal, concrete pipes ranging fuse 100 to 500'm/m in diameter rare used. Ceramic pipe was used where it was felt the sewage contained ebeaieal e_