TRANSPORTATION - RAILROAD ELECTRICAL PLANT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00809A000600210701-0
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
1
Document Creation Date:
December 22, 2016
Document Release Date:
June 24, 2011
Sequence Number:
701
Case Number:
Publication Date:
April 4, 1949
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 72.28 KB |
Body:
Sanitized Copy Approved for Release 2011/06/24: CIA-RDP80-00809A000600210701-0
COUNTRY
SUBJECT
HOW
PUBLISHED
WHERE
PUBLISHED
DATE
PUBLISHED
LANGUAGE
wocwwwwr SIAT WIThI1wA710w Arr=cnwe M& "non" 01raffiss
AZ WIn110 ni[ wunq~ or .;now..! ACN
N Sww iia.$3
a hv TO "06
.......... ...... ,e. Ttuewi{wl?w ow
.
P
CLASSIF- TION CO "
CENTRAL INTELLIGENCE AGENCY
INFORMATION FROM
FOREIGN DOCUMENTS OR RADIO BROADCASTS
Transportation - Railroad electrical plant
Monthly periodical
Moscow
November 1948
Zheleznodorozhn tanepor; Ni 11, 1948, (Information requested.)
CD NO.
DATE OF
INFORMATION 1948.
DATE DIST. L April 1949
NO. OF PAGES 1
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED INFORMATION
The first electrical engineering plant for transport equipment has been
built at one of the stations on the Moscow-Kursk Railroad System. The plant
is designed for the following operations: manufacture of spar3 parts, repair
of electrical equipment, and assembly and re-Air of electric-power generating
equipment.
The plant has been built as one of the units of the Central Electrical
Repair Shops S;stem., The following are in operation: machine, forging, Me-
sel, electrical, assembly, and tool shops, and the labcratory.
Operations at the plant will include performance of capital repairs on
Dissei- and steam turbine-powered traveling eloitr.Lc-2otrer station., nanufac
ture of spare parts for Diesels and turbines, repair and checking of control
and measure ant instruments, generators, and transformers.
The plants'r half-year plan for gross production was fulfilled 126.8 per-
At present, the plant has been assigned the big job of manufacturing spare
p..:ts for turbines of 250, 500 and 1,000 kilourattb.
A Design and Planning Bureau has been organized for developing the neces-
sary blueprints for all operations being carried an by + .)is plant. The Bureau
will also design new machines, devices, and apparatas for the power eoon y.
The plant will participate in their productign and conduct teats of these new
products.
Mare wu:r Mess
50X1-HUM
Sanitized Copy Approved for Release 2011/06/24: CIA-RDP80-00809A00060021070.1-0 I