Sanitized Copy Approved for Release 2011/06/28: CIA-RDP80-00809A000600220279-9
COUNTRY SR
SUBJECT Scos,nit - Rler;.ric payer
HOW
PUBLISHED Daisy wevapape:a
WHERE
PUBLISHED '1SM?
DATE
PUBLISHED .:er. ?? 9 *r 1949
LANGUAGE R,aaiaj
W TOC oawTea 0TAT0 OITOAO TOW O"W" or ""men Acr An
O. U. C.. of AUO 00.10 A?IIsra.' T C T$CCCOtlINM N n0 MCAiIIU
M M 000"OIO 10 AIR OAOOCC. TO AN CU TICCIao Penn" 10 PVC.
mum I Le: 00/P000CTTOO CC TUIo PHY IC P 1551TCO.
REPORT
CD NO.
DATE OF
SUPPLEMENT ?O
REPORT NO.
THIS IS UNEVALUATED INFORMATION
;Information requested.)
C(X8TRUCTIC5 ON RUSTAYI AT AND P 11JZR PIAAT PRO(IRPSSZ8 -- Zarya Tostoka,
No 4,.7 Jon 49
The RustaTl heat and power plant was under construction throughout 1948.
Huge amounts of aoaFlez equipment, -setal, and pipes were required. Asseably
worker. ams iron all parts of the Union. Special efforts were required for the
ouzr'.rsotion of the :a.ter.?receiving installations. The Rustavi heat and power
p?rat will use three times as uuoh water as is used by all the plants and the
popu`xtiua of Tb:liei. The Kurs River will be diverted to a new, specially
eoz3tieua:ad scurrete ricer bed.
The Fla:t, equipped with the latest automatic control devices, will use
2,000 tors of T rarcheli a Tkibuli coal daily cad will supply the aetallur-
gica:.plzat with electric pcwer. steam for industrial purposes, and hot water.
Rustavi workers are confider that the electric paver of the new heat and
power plant will asks possible the smelting of Georgian stool in 1949.
The year 19k8 t.as a perioz of Intense construction activity '.n the city of
Ruafavt, ;ieorgisa SM. A number of new shops of the Rustavi Metallurgical plant
warn p_t into operation, including the iron and steel mill, electrical repair
shop, voadworking chop, crosetie-impreanating shop, and oxygen shop. The frans
of an open :.ee:rth plt2:,: ?eas bu) It, and a Lloomin" mill, balst furyaese, a coke-
cheea:asl v. tshop, &::4 a pips-"sting workshop are under construction.
Ufl GRS U! R COJSTa10C7:C3 Stalinekoye Znaaa, 10 26, 8 Feb 49
Ccnotruotion oS a 255-kilowatt interkoikhoz 018 has begun in the lolkhos
inxai Stalin, Zaur&k:s.*iy Village Soviet, Andishanskiy Raton, Uzbek SBR.
CLA,SSIFICA N
CENTRAL INTELLIGENCE AGENCY
INFORMATION FROM
FOREIGN DOCUMENTS OR RADIO BROADCASTS
CLASSIFICATION
9
Son
50X1-HUM
Sanitized Copy Approved for Release 2011/06/28: CIA-RDP80-00809A000600220279-9
Sanitized Copy Approved for Release 2011/06/28: CIA-RDP80-00809A000600220279-9
L;ViI.$Di MW PLAB CONSTRUCTED -- Sovetekaya Latviya, No 35, 12 Feb 49
A stew-?electric power plant has been constructed at 'Zilaye' Peat Bog.
A 7-kilometer blgh-voltage trenemieslon line has been installed from the plant
to the city of Rezekne. Workers and employees of 16 enterprises and institu-
tions of Rezekne a,ad peasants of ler-gal'ekiy and Reznekiy Volosts participated
in the construction work.
It is expected i;hac the nav plat viil be operating by the and of the month
and. Chat the city ?e electric pcger aappl; will be increased 50 percent,
AR1(RIAd6 ZU-210 II2A34.S) ISSICN LIRE PRO SEES -- gommunist, No 38, 16 Feb 49
Cozmtruction on the 4anaker G 3-Uzer soya GES high-voltage transmission line
is progre sing in spite of winter conditions. Three hundred out of a total of
320 metal meets have already been set up, and 30 kilometers of cable have been
strung. Assemblers and, constructors have pledged to complete work on the trans-
mission line in June 1949.
KA.ddIA POWER;1[RRk'OM EXPANDS -- Hazakhatanekaya Pravda, No 47, 8 Mar
Construction of the Aoeaor TsEE (Central 3lectrio Power Plant) is almost
oos%leted.. After it in put into operation, the Rmba River will have an electric
network with a length of several hundred kilometers. The most distant oil
fields and prospecting regions will receive electric power.
The main building of the plant has been finished and two turbines have been
.iratalled. The electric plant will receive its water supply by the 30-kilometer
Dossor-Iekine water main, now being built. Construction workers pledged to have
the plant ready for operation by 1 May 1949.
Et oMG :'O=R S tTI(R OM IM WITH NPS'8 -- Sovetskaya Moldaviya, No 48, 9 Mar 41)
Since the and of the war, 41 electric power plants have been built in MTSa
in Moldavia. Twenty-four more will have been put into operation by 1950.
Sanitized Copy Approved for Release 2011/06/28: CIA-RDP80-00809A000600220279-9